Cloud County Wind Farm
1409 Iron Road, Concordia, KS 66901Plant Summary Information
Cloud County Wind Farm is ranked #43 out of 174 power plants in Kansas in terms of total annual net electricity generation.
Cloud County Wind Farm generated 77.8 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Cloud County Wind Farm |
|---|---|
| Utility Name | Cloud County Windfarm, LLC |
| Location | Cloud County, KS |
| Initial Operation Date | December 2008 |
| Last Update | Sep 2025 |
| Annual Generation | 334.8 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,826 out of 12,539 Power Plants Nationwide | |
| Ranked #548 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #43 out of 174 Kansas Power Plants | |
| Ranked #34 out of 52 Kansas Wind Power Plants | |
| Fuel Types | Wind |
Map of Cloud County Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cloud County Wind Farm.
Monthly Net Generation for Cloud County Wind Farm
Cloud County Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Cloud County Wind Farm (56784) |
| Plant Address | 1409 Iron Road, Concordia, KS 66901 |
| Utility | Cloud County Windfarm, LLC (55990) |
| Latitude, Longitude | 39.4375, -97.6644 |
| Generation Dates on File | Dec 2008 to Sep 2025 |
| Initial Operation Date | December 2008 |
| Annual Generation | 334.8 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 08-1225 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Prairie Land Electric Coop Inc (13799) KS |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2008
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 105 MW |
| Summer Capacity | 105 MW |
| Winter Capacity | 105 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2008 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 35 |
| Turbine Details | |
| Number Of Turbines | 35 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V90-3.0 |
| Design Wind Speed | 18.3 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262 |
Generator 2 Details Operating December 2008
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 96 MW |
| Summer Capacity | 96 MW |
| Winter Capacity | 96 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2008 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 32 |
| Turbine Details | |
| Number Of Turbines | 32 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V90-3.0 |
| Design Wind Speed | 17.6 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262 |
Cloud County Wind Farm Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #538 | Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh |
| #539 | Fenton Wind Farm | Chandler, MN | 340.2 GWh |
| #540 | Bishop Hill II Wind Farm | Cambridge, IL | 339.9 GWh |
| #541 | Mesquite Wind Power LLC | Abilene, TX | 339.8 GWh |
| #542 | Cameron Wind 1 LLC | Rio Hondo, TX | 337.6 GWh |
| #543 | Shady Oaks Wind 2 | Compton, IL | 338.1 GWh |
| #544 | Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh |
| #545 | Papalote Creek I LLC | Taft, TX | 335.8 GWh |
| #546 | Penascal Wind Power LLC | Sarita, TX | 335.6 GWh |
| #547 | Rugby Wind Power Project | Barton, ND | 335.4 GWh |
| #549 | Spinning Spur Wind LLC | Vegas, TX | 334.2 GWh |
| #550 | Peyton Creek Wind Farm LLC | Bay City, TX | 334.2 GWh |
| #551 | Lorenzo Wind | Lorenzo, TX | 334.1 GWh |
| #552 | Macksburg Wind Project | Macksburg, IA | 329.9 GWh |
| #553 | Ivester Wind Farm | Wellsburg, IA | 329.4 GWh |
| #554 | Crossroads Wind Farm | Canton, OK | 328.2 GWh |
| #555 | Ashtabula Wind II LLC | Luverne, ND | 328.1 GWh |
| #556 | Michigan Wind 2 | Minden City, MI | 326.6 GWh |
| #557 | Shady Oaks Wind Farm | Compton, IL | 326.4 GWh |
| #558 | Palouse | Oakesdale, WA | 325.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cloud County Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Belleville | Belleville, KS | 205.0 MWh | 27.4 mi |
| Beloit | Beloit, KS | 192.0 MWh | 23.9 mi |
| Beloit Solar LLC | Beloit, KS | 4.6 GWh | 23.5 mi |
| Clifton | Clifton, KS | 6.3 GWh | 23.9 mi |
| Corvias - Fort Riley II | Fort Riley, KS | 2.3 GWh | 51.5 mi |
| Deshler | Deshler, NE | 2.0 MWh | 48.7 mi |
| Deshler Solar | Hebron, NE | 2.3 GWh | 44.9 mi |
| Hebron | Hebron, NE | 5.2 GWh | 52.1 mi |
| High Banks Wind | Belleville, KS | 2.5 TWh | 28.9 mi |
| Lincoln | Lincoln, KS | 22.0 MWh | 38.1 mi |
| Lindsborg | Lindsborg, KS | 2.4 GWh | 60.3 mi |
| Minneapolis City of | Minneapolis, KS | 99.0 MWh | 22.1 mi |
| Munson-DS&O | Junction City, KS | 2.3 GWh | 50.6 mi |
| Osborne | Osborne, KS | 15.7 MWh | 54.7 mi |
| Post Rock Wind Power Project, LLC | Ellsworth, KS | 405.7 GWh | 53.4 mi |
| Smoky Hills Wind Project Phase I | Lincoln, KS | 250.8 GWh | 46.8 mi |
| Smoky Hills Wind Project Phase II | Lincoln, KS | 414.3 GWh | 46.3 mi |
| Solomon-DS&O | Solomon, KS | 2.4 GWh | 43.5 mi |
| Steele Flats Wind Project LLC | Diller, NE | 269.1 GWh | 56.7 mi |
| Washington | Washington, KS | 125.0 MWh | 41.7 mi |