Callahan Divide Wind Energy Center
1209 F CR 618, Tusocola, TX 79562Plant Summary Information
Callahan Divide Wind Energy Center is ranked #136 out of 226 wind farms in Texas in terms of total annual net electricity generation.
Callahan Divide Wind Energy Center generated 110.4 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Callahan Divide Wind Energy Center |
|---|---|
| Utility Name | FPL Energy Callahan Wind, LLC |
| Location | Taylor County, TX |
| Initial Operation Date | March 2005 |
| Last Update | Dec 2024 |
| Annual Generation | 414.3 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,546 out of 12,574 Power Plants Nationwide | |
| Ranked #437 out of 1,370 Wind Power Plants Nationwide | |
| Ranked #312 out of 810 Texas Power Plants | |
| Ranked #136 out of 226 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Callahan Divide Wind Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Callahan Divide Wind Energy Center.
Monthly Net Generation for Callahan Divide Wind Energy Center
Callahan Divide Wind Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Callahan Divide Wind Energy Center (56270) |
| Plant Address | 1209 F CR 618, Tusocola, TX 79562 |
| Utility | FPL Energy Callahan Wind, LLC (50012) |
| Latitude, Longitude | 32.30389, -100.02167 |
| Generation Dates on File | Feb 2005 to Dec 2024 |
| Initial Operation Date | March 2005 |
| Annual Generation | 414.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator 1 Details Operating March 2005
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 114 MW |
| Summer Capacity | 114 MW |
| Winter Capacity | 114 MW |
| Minimum Load | 5.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2005 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 76 |
| Turbine Details | |
| Number Of Turbines | 76 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.5 |
Callahan Divide Wind Energy Center Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #427 | Cedar Creek Wind, LLC | Shelley, ID | 430.4 GWh |
| #428 | Ranchland Wind Project I | Cisco, TX | 429.6 GWh |
| #429 | Bishop Hill III | Cambridge, IL | 426.5 GWh |
| #430 | Fowler Ridge IV Wind Farm LLC | Fowler, IN | 425.5 GWh |
| #431 | Whispering Willow Wind Farm - East | Iowa Falls, IA | 425.2 GWh |
| #432 | Prairie Queen Wind Farm | Moran, KS | 424.8 GWh |
| #433 | Los Vientos Windpower IV | Rio Grande City, TX | 423.4 GWh |
| #434 | Heartland Divide Wind Project, LLC | Melville, IA | 417.9 GWh |
| #435 | Los Vientos Wind 1A | Sebastian, TX | 416.8 GWh |
| #436 | Leaning Juniper Wind Power II | Arlington, OR | 416.6 GWh |
| #438 | Smoky Hills Wind Project Phase II | Lincoln, KS | 414.3 GWh |
| #439 | Senate Wind LLC | Bryson, TX | 413.7 GWh |
| #440 | Morning Light Wind Farm | Adair, IA | 413.3 GWh |
| #441 | Canadian Hills Wind | El Rino, OK | 413.2 GWh |
| #442 | Judith Gap Wind Energy Center | Harlowton, MT | 412.6 GWh |
| #443 | Glass Sands Wind Facility | Sulphur, OK | 412.2 GWh |
| #444 | Midway Wind, LLC | Taft, TX | 412.1 GWh |
| #445 | Camp Grove Wind Farm | Wyoming, IL | 406.4 GWh |
| #446 | Post Oak Wind LLC | Abilene, TX | 405.5 GWh |
| #447 | Panther Creek Wind Farm II | Big Spring, TX | 402.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Callahan Divide Wind Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 493.6 GWh | 35.6 mi |
| Buffalo Gap 2 Wind Farm | Merkel, TX | 348.5 GWh | 9.1 mi |
| Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 4.7 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 2.4 mi |
| HEB00070 | Abilene, TX | 231.0 MWh | 17.8 mi |
| Holstein 1 Solar Farm | Wingate, TX | 276.9 GWh | 16.1 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 6.5 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 35.2 mi |
| Maryneal Windpower | Maryneal, TX | 550.1 GWh | 28.4 mi |
| Mesquite Star | Roscoe, TX | 1.1 TWh | 17.8 mi |
| Post Oak Wind LLC | Abilene, TX | 405.5 GWh | 25.8 mi |
| South Trent Wind Farm | Sweetwater, TX | 252.5 GWh | 9.5 mi |
| Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh | 18.9 mi |
| Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh | 20.6 mi |
| Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh | 23.4 mi |
| Sweetwater Wind 4 LLC | Roscoe, TX | 628.5 GWh | 29.7 mi |
| Sweetwater Wind 5 | Roscoe, TX | 163.2 GWh | 27.4 mi |
| Trent Wind Farm | Trent, TX | 515.0 GWh | 15.2 mi |
| Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh | 16.2 mi |
| WAL536 | Abilene, TX | 245.0 MWh | 22.5 mi |