Mesquite Star
1125 F M 608, Roscoe, TX 79545Plant Summary Information
Mesquite Star is ranked #35 out of 1,366 wind farms nationwide in terms of total annual net electricity generation.
Mesquite Star generated 383.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Mesquite Star |
|---|---|
| Utility Name | Mesquite Star Special LLC |
| Location | Nolan County, TX |
| Initial Operation Date | March 2020 |
| Last Update | May 2026 |
| Annual Generation | 1.2 TWh |
| Annual Consumption | 4.4 M MMBtu |
| Ranked #666 out of 13,081 Power Plants Nationwide | |
| Ranked #35 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #103 out of 852 Texas Power Plants | |
| Ranked #15 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Mesquite Star LLC (2018 to 2023) Mesquite Star Special LLC (2024 to 2025) |
Map of Mesquite Star
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mesquite Star.
Monthly Net Generation for Mesquite Star
Monthly Plant Fuel Consumption for Mesquite Star
Mesquite Star Details
| Summary Information | |
|---|---|
| Plant Name | Mesquite Star (62587) |
| Plant Address | 1125 F M 608, Roscoe, TX 79545 |
| Utility | Mesquite Star Special LLC (62085) |
| Latitude, Longitude | 32.25598, -100.32031 |
| Generation Dates on File | Mar 2020 to May 2026 |
| Initial Operation Date | March 2020 |
| Annual Generation | 1.2 TWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Big Country Electric Coop, Inc (1591) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator MESQ Details Operating March 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 418.9 MW |
| Summer Capacity | 418.9 MW |
| Winter Capacity | 418.9 MW |
| Minimum Load | 23 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 120 |
| Turbine Details | |
| Number Of Turbines | 120 |
|---|---|
| Predominant Turbine Manufacturer | Siemens Gamesa |
| Predominant Turbine Model Number | G132-3.465 |
| Design Wind Speed | 16.2 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 101 |
Mesquite Star Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #25 | Iron Star Wind Project | Dodge City, KS | 1.2 TWh |
| #26 | Seven Cowboy Wind Project, LLC | Rocky, OK | 1.2 TWh |
| #27 | Palo Duro Wind | Perryton, TX | 1.2 TWh |
| #28 | Santa Rita East | Barnhart, TX | 1.2 TWh |
| #29 | Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh |
| #30 | Grande Prairie Wind Farm | O'Neill, NE | 1.2 TWh |
| #31 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.2 TWh |
| #32 | Flat Ridge 2 Wind Energy LLC | Zenda, KS | 1.2 TWh |
| #33 | Beaver Creek Wind | Ogden, IA | 1.2 TWh |
| #34 | Boswell Wind | Rock River, WY | 1.2 TWh |
| #36 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
| #37 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
| #38 | Sage Draw Wind | Wilson, TX | 1.2 TWh |
| #39 | Foard City Wind | Crowell, TX | 1.2 TWh |
| #40 | Neosho Ridge Wind Energy Center | Galesburg, KS | 1.2 TWh |
| #41 | Tahoka Wind | Tahoka, TX | 1.2 TWh |
| #42 | WPWP | Wellington, KS | 1.1 TWh |
| #43 | Ranchero Wind Farm LLC | Iraan, TX | 1.1 TWh |
| #44 | Arbor Hill Wind Farm | Greenfield, IA | 1.1 TWh |
| #45 | SunZia Wind South | Corona, NM | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mesquite Star.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Buffalo Gap 2 Wind Farm | Merkel, TX | 350.4 GWh | 9.4 mi |
| Buffalo Gap 3 Wind Farm | Nolan, TX | 337.7 GWh | 13.1 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 158.7 GWh | 15.6 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 422.0 GWh | 17.8 mi |
| Champion Wind Farm LLC | Roscoe, TX | 382.3 GWh | 21.5 mi |
| Holstein 1 Solar Farm | Wingate, TX | 337.6 GWh | 14 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 15.7 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 321.2 GWh | 22.5 mi |
| Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 27.8 mi |
| Maryneal Windpower | Maryneal, TX | 499.2 GWh | 10.8 mi |
| Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 896.2 GWh | 30.8 mi |
| Roscoe Wind Farm LLC | Roscoe, TX | 335.8 GWh | 25 mi |
| South Trent Wind Farm | Sweetwater, TX | 272.3 GWh | 15.4 mi |
| Sweetwater Wind 1 LLC | Sweetwater, TX | 138.2 GWh | 7.3 mi |
| Sweetwater Wind 2 LLC | Sweetwater, TX | 351.7 GWh | 6.9 mi |
| Sweetwater Wind 3 LLC | Sweetwater, TX | 472.3 GWh | 6.4 mi |
| Sweetwater Wind 4 LLC | Roscoe, TX | 622.7 GWh | 12.9 mi |
| Sweetwater Wind 5 | Roscoe, TX | 172.5 GWh | 9.6 mi |
| Trent Wind Farm | Trent, TX | 525.7 GWh | 13 mi |
| Turkey Track Wind Energy LLC | Blackwell, TX | 331.4 GWh | 5 mi |