Buffalo Gap 2 Wind Farm
10718 FM 89, Merkel, TX 79536Plant Summary Information
Buffalo Gap 2 Wind Farm is ranked #161 out of 228 wind farms in Texas in terms of total annual net electricity generation.
Buffalo Gap 2 Wind Farm generated 91.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Buffalo Gap 2 Wind Farm |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Nolan County, TX |
| Initial Operation Date | July 2007 |
| Last Update | Dec 2025 |
| Annual Generation | 350.4 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,824 out of 13,081 Power Plants Nationwide | |
| Ranked #539 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #374 out of 852 Texas Power Plants | |
| Ranked #161 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
AES Wind Generation Inc (2013 to 2021) AES Distributed Energy (2022 to 2025) |
Map of Buffalo Gap 2 Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Buffalo Gap 2 Wind Farm.
Monthly Net Generation for Buffalo Gap 2 Wind Farm
Monthly Plant Fuel Consumption for Buffalo Gap 2 Wind Farm
Buffalo Gap 2 Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Buffalo Gap 2 Wind Farm (56484) |
| Plant Address | 10718 FM 89, Merkel, TX 79536 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 32.31822, -100.17699 |
| Generation Dates on File | Jul 2007 to Dec 2025 |
| Initial Operation Date | July 2007 |
| Annual Generation | 350.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 34.00 kV |
| Energy Storage | No |
Generator 1 Details Operating July 2007
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 232.5 MW |
| Summer Capacity | 232.5 MW |
| Winter Capacity | 232.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2007 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 155 |
| Turbine Details | |
| Number Of Turbines | 155 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 S |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 201 |
Buffalo Gap 2 Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #529 | Tuscola Bay Wind | Reese, MI | 357.9 GWh |
| #530 | Elbow Creek Wind Project LLC | Forsan, TX | 357.9 GWh |
| #531 | Drift Sand Wind Project LLC | Rush Springs, OK | 357.1 GWh |
| #532 | Wolf Ridge Wind | Muenster, TX | 355.0 GWh |
| #533 | Prairie Winds ND1 | Minot, ND | 353.8 GWh |
| #534 | Hopkins Ridge Wind | Dayton, WA | 352.9 GWh |
| #535 | Sweetwater Wind 2 LLC | Sweetwater, TX | 351.7 GWh |
| #536 | Lorenzo Wind | Lorenzo, TX | 351.1 GWh |
| #537 | Midland Wind | Kewane, IL | 350.9 GWh |
| #538 | Cameron Wind 1 LLC | Rio Hondo, TX | 348.2 GWh |
| #540 | Lindahl Wind Project, LLC | Tioga, ND | 350.1 GWh |
| #541 | Trimont Area Wind Farm | Trimont, MN | 349.7 GWh |
| #542 | Majestic 1 Wind Farm | Panhandle, TX | 349.7 GWh |
| #543 | Palmas Wind, LLC | Rio Hondo, TX | 349.6 GWh |
| #544 | Rugby Wind Power Project | Barton, ND | 348.1 GWh |
| #545 | Spinning Spur Wind LLC | Vegas, TX | 347.0 GWh |
| #546 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 346.2 GWh |
| #547 | Duran Mesa LLC | Duran, NM | 345.3 GWh |
| #548 | Voyager Wind I | Mojave, CA | 343.4 GWh |
| #549 | Northern Wind | Lake Wilson, MN | 343.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Buffalo Gap 2 Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Buffalo Gap 3 Wind Farm | Nolan, TX | 337.7 GWh | 5 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 158.7 GWh | 6.8 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 422.0 GWh | 9.1 mi |
| Champion Wind Farm LLC | Roscoe, TX | 382.3 GWh | 28 mi |
| HEB00070 | Abilene, TX | 255.0 MWh | 25.7 mi |
| Holstein 1 Solar Farm | Wingate, TX | 337.6 GWh | 14.8 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 10 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 321.2 GWh | 26.5 mi |
| Maryneal Windpower | Maryneal, TX | 499.2 GWh | 20.1 mi |
| Mesquite Star | Roscoe, TX | 1.2 TWh | 9.4 mi |
| Roscoe Wind Farm LLC | Roscoe, TX | 335.8 GWh | 30.4 mi |
| South Trent Wind Farm | Sweetwater, TX | 272.3 GWh | 6.8 mi |
| Sweetwater Wind 1 LLC | Sweetwater, TX | 138.2 GWh | 9.9 mi |
| Sweetwater Wind 2 LLC | Sweetwater, TX | 351.7 GWh | 11.5 mi |
| Sweetwater Wind 3 LLC | Sweetwater, TX | 472.3 GWh | 14.4 mi |
| Sweetwater Wind 4 LLC | Roscoe, TX | 622.7 GWh | 20.6 mi |
| Sweetwater Wind 5 | Roscoe, TX | 172.5 GWh | 18.8 mi |
| Trent Wind Farm | Trent, TX | 525.7 GWh | 8.5 mi |
| Turkey Track Wind Energy LLC | Blackwell, TX | 331.4 GWh | 9.9 mi |
| WAL536 | Abilene, TX | 423.0 MWh | 30.1 mi |