Buffalo Gap 2 Wind Farm
10718 FM 89, Merkel, TX 79536Plant Summary Information
Buffalo Gap 2 Wind Farm is ranked #150 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Buffalo Gap 2 Wind Farm generated 91.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Buffalo Gap 2 Wind Farm |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Nolan County, TX |
| Initial Operation Date | July 2007 |
| Last Update | Dec 2025 |
| Annual Generation | 350.4 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,790 out of 12,613 Power Plants Nationwide | |
| Ranked #531 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #349 out of 816 Texas Power Plants | |
| Ranked #150 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
AES Wind Generation Inc (2013 to 2021) AES Distributed Energy (2022 to 2024) |
Map of Buffalo Gap 2 Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Buffalo Gap 2 Wind Farm.
Monthly Net Generation for Buffalo Gap 2 Wind Farm
Monthly Plant Fuel Consumption for Buffalo Gap 2 Wind Farm
Buffalo Gap 2 Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Buffalo Gap 2 Wind Farm (56484) |
| Plant Address | 10718 FM 89, Merkel, TX 79536 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 32.31822, -100.17699 |
| Generation Dates on File | Jul 2007 to Dec 2025 |
| Initial Operation Date | July 2007 |
| Annual Generation | 350.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 34.00 kV |
| Energy Storage | No |
Generator 1 Details Operating July 2007
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 232.5 MW |
| Summer Capacity | 232.5 MW |
| Winter Capacity | 232.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2007 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 155 |
| Turbine Details | |
| Number Of Turbines | 155 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 S |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 201 |
Buffalo Gap 2 Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #521 | Northern Wind | Lake Wilson, MN | 358.0 GWh |
| #522 | Benton County Wind Farm | Earl Park, IN | 357.6 GWh |
| #523 | Vansycle II Wind Energy Center | Athena, OR | 357.3 GWh |
| #524 | Seiling Wind II | Seiling, OK | 356.1 GWh |
| #525 | Arbuckle Mountain Wind Farm LLC | Davis, OK | 355.9 GWh |
| #526 | Colorado Highlands Wind | Fleming, CO | 355.0 GWh |
| #527 | Settlers Trail Wind Farm LLC | Sheldon, IL | 353.9 GWh |
| #528 | High Lonesome Mesa LLC | Willard, NM | 351.7 GWh |
| #529 | Oakfield Wind Project | City of Oakfield, ME | 350.6 GWh |
| #530 | Spring Valley Wind Project | Ely, NV | 350.6 GWh |
| #532 | Blue Summit II Wind | Vernon, TX | 346.9 GWh |
| #533 | Mesquite Wind Power LLC | Abilene, TX | 346.3 GWh |
| #534 | Midland Wind | Kewane, IL | 346.2 GWh |
| #535 | Hopkins Ridge Wind | Dayton, WA | 345.4 GWh |
| #536 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
| #537 | Gratiot Farms Wind Project | Carson City, MI | 344.5 GWh |
| #538 | Drift Sand Wind Project LLC | Rush Springs, OK | 344.1 GWh |
| #539 | Hart Wind | Hart, TX | 344.0 GWh |
| #540 | Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh |
| #541 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 343.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Buffalo Gap 2 Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 5 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 6.8 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 9.1 mi |
| Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh | 28 mi |
| HEB00070 | Abilene, TX | 231.0 MWh | 25.7 mi |
| Holstein 1 Solar Farm | Wingate, TX | 286.8 GWh | 14.8 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 10 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 26.5 mi |
| Maryneal Windpower | Maryneal, TX | 545.0 GWh | 20.1 mi |
| Mesquite Star | Roscoe, TX | 1.2 TWh | 9.4 mi |
| Roscoe Wind Farm LLC | Roscoe, TX | 364.3 GWh | 30.4 mi |
| South Trent Wind Farm | Sweetwater, TX | 252.5 GWh | 6.8 mi |
| Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh | 9.9 mi |
| Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh | 11.5 mi |
| Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh | 14.4 mi |
| Sweetwater Wind 4 LLC | Roscoe, TX | 633.4 GWh | 20.6 mi |
| Sweetwater Wind 5 | Roscoe, TX | 163.2 GWh | 18.8 mi |
| Trent Wind Farm | Trent, TX | 515.0 GWh | 8.5 mi |
| Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh | 9.9 mi |
| WAL536 | Abilene, TX | 245.0 MWh | 30.1 mi |