Buffalo Gap 2 Wind Farm
10718 FM 89, Merkel, TX 79536Plant Summary Information
Buffalo Gap 2 Wind Farm is ranked #140 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Buffalo Gap 2 Wind Farm generated 84.9 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Buffalo Gap 2 Wind Farm |
---|---|
Utility Name | AES Distributed Energy |
Location | Nolan County, TX |
Initial Operation Date | July 2007 |
Last Update | Mar 2025 |
Annual Generation | 372.6 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,620 out of 12,288 Power Plants Nationwide | |
Ranked #481 out of 1,353 Wind Power Plants Nationwide | |
Ranked #308 out of 788 Texas Power Plants | |
Ranked #140 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
AES Wind Generation Inc (2013 to 2021) AES Distributed Energy (2022 to 2024) |
Map of Buffalo Gap 2 Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Buffalo Gap 2 Wind Farm.
Monthly Net Generation for Buffalo Gap 2 Wind Farm
Buffalo Gap 2 Wind Farm Details
Summary Information | |
---|---|
Plant Name | Buffalo Gap 2 Wind Farm (56484) |
Plant Address | 10718 FM 89, Merkel, TX 79536 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 32.31822, -100.17699 |
Generation Dates on File | Jul 2007 to Mar 2025 |
Initial Operation Date | July 2007 |
Annual Generation | 372.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 34.00 kV |
Energy Storage | No |
Generator 1 Details Operating July 2007
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 232.5 MW |
Summer Capacity | 232.5 MW |
Winter Capacity | 232.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 155 |
Turbine Details | |
Number Of Turbines | 155 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 S |
Design Wind Speed | 17 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 201 |
Buffalo Gap 2 Wind Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#471 | Grand Meadow | Dexter, MN | 380.3 GWh |
#472 | Trimont Area Wind Farm | Trimont, MN | 378.9 GWh |
#473 | Bitter Ridge Wind Farm, LLC | Redkey, IN | 378.9 GWh |
#474 | Prairie Winds SD1 | Crow Lake, SD | 378.9 GWh |
#475 | Victory Wind Farm | Westside, IA | 378.4 GWh |
#476 | Drift Sand Wind Project LLC | Rush Springs, OK | 377.4 GWh |
#477 | White Oak Energy LLC | Carlock, IL | 376.2 GWh |
#478 | Gratiot Farms Wind Project | Carson City, MI | 375.2 GWh |
#479 | Wolf Ridge Wind | Muenster, TX | 374.5 GWh |
#480 | Crescent Wind Park | Hillsdale, MI | 373.6 GWh |
#482 | Tuscola Bay Wind | Reese, MI | 371.9 GWh |
#483 | Hoopeston Wind LLC | Rossville, IL | 371.3 GWh |
#484 | Black Rock Wind | Elk Garden, WV | 371.1 GWh |
#485 | FPL Energy Vansycle LLC (WA) | Touchet, WA | 370.3 GWh |
#486 | Blue Summit II Wind | Vernon, TX | 370.2 GWh |
#487 | Goshen Phase II | Idaho Falls, ID | 369.2 GWh |
#488 | Tyler Bluff Wind Project, LLC | Muenster, TX | 367.0 GWh |
#489 | White Rock West Wind Project | Anadarko, OK | 366.9 GWh |
#490 | Dunlap | Medicine Bow, WY | 366.5 GWh |
#491 | Majestic 1 Wind Farm | Panhandle, TX | 365.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Buffalo Gap 2 Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 5 mi |
Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 6.8 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 9.1 mi |
Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh | 28 mi |
HEB00070 | Abilene, TX | 231.0 MWh | 25.7 mi |
Holstein 1 Solar Farm | Wingate, TX | 386.0 GWh | 14.8 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 10 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 26.5 mi |
Maryneal Windpower | Maryneal, TX | 569.6 GWh | 20.1 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 9.4 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 343.2 GWh | 30.4 mi |
South Trent Wind Farm | Sweetwater, TX | 252.5 GWh | 6.8 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh | 9.9 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh | 11.5 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh | 14.4 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 636.6 GWh | 20.6 mi |
Sweetwater Wind 5 | Roscoe, TX | 163.2 GWh | 18.8 mi |
Trent Wind Farm | Trent, TX | 515.0 GWh | 8.5 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh | 9.9 mi |
WAL536 | Abilene, TX | 245.0 MWh | 30.1 mi |