TB Flats
2179A Wyoming Highway 487, Medicine Bow, WY 82329Plant Summary Information
TB Flats is ranked #19 out of 1,358 wind farms nationwide in terms of total annual net electricity generation.
TB Flats generated 483.0 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | TB Flats |
|---|---|
| Utility Name | PacifiCorp |
| Location | Carbon County, WY |
| Initial Operation Date | October 2021 |
| Last Update | Mar 2026 |
| Annual Generation | 1.4 TWh |
| Annual Consumption | 5.2 M MMBtu |
| Ranked #621 out of 12,332 Power Plants Nationwide | |
| Ranked #19 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #7 out of 70 Wyoming Power Plants | |
| Ranked #1 out of 28 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
Map of TB Flats
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TB Flats.
Monthly Net Generation for TB Flats
Monthly Plant Fuel Consumption for TB Flats
TB Flats Details
| Summary Information | |
|---|---|
| Plant Name | TB Flats (62516) |
| Plant Address | 2179A Wyoming Highway 487, Medicine Bow, WY 82329 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 42.17725, -106.23414 |
| Generation Dates on File | Oct 2021 to Mar 2026 |
| Initial Operation Date | October 2021 |
| Annual Generation | 1.4 TWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 1 Details Operating October 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 503.2 MW |
| Summer Capacity | 503.2 MW |
| Winter Capacity | 503.2 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 132 |
| Turbine Details | |
| Number Of Turbines | 132 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V136-4.2 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262 |
TB Flats Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #9 | White Mesa Wind | Ozona, TX | 1.8 TWh |
| #10 | Aviator Wind | Robert Lee, TX | 1.8 TWh |
| #11 | Orient Wind Farm | Orient, IA | 1.8 TWh |
| #12 | Cheyenne Ridge Wind Farm | Cheyenne Wells, CO | 1.7 TWh |
| #13 | Maverick Creek Wind | Eden, TX | 1.7 TWh |
| #14 | Young Wind | Graham, TX | 1.6 TWh |
| #15 | Rolling Hills Wind Farm | Massena, IA | 1.5 TWh |
| #16 | Fowler Ridge Wind Farm LLC | Fowler, IN | 1.5 TWh |
| #17 | Palo Alto Wind Farm | Emmetsburg, IA | 1.4 TWh |
| #18 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.4 TWh |
| #20 | Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh |
| #21 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
| #22 | Cedar Springs Wind IV | Douglas, WY | 1.3 TWh |
| #23 | North English | Montezuma, IA | 1.3 TWh |
| #24 | Inertia Wind Project | Haskell, TX | 1.3 TWh |
| #25 | Grande Prairie Wind Farm | O'Neill, NE | 1.3 TWh |
| #26 | Santa Rita East | Barnhart, TX | 1.3 TWh |
| #27 | Highland Wind Project (IA) | Primghar, IA | 1.3 TWh |
| #28 | Iron Star Wind Project | Dodge City, KS | 1.2 TWh |
| #29 | Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TB Flats.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 35.6 mi |
| Boswell Wind | Rock River, WY | 1.2 TWh | 25.9 mi |
| Campbell Hill Windpower | Glenrock, WY | 257.0 GWh | 59.1 mi |
| Dave Johnston | Glen Rock, WY | 3.6 TWh | 51.2 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 10 mi |
| Ekola Flats | Hanna, WY | 765.2 GWh | 18.1 mi |
| Foote Creek Rim | McFadden, WY | 642.4 GWh | 38 mi |
| Fremont Canyon | Alcova, WY | 227.7 GWh | 35.4 mi |
| Glenrock | Glenrock, WY | 401.0 GWh | 61.5 mi |
| High Plains | Rock River, WY | 274.1 GWh | 36.5 mi |
| Kortes | Sinclair, WY | 155.4 GWh | 33.1 mi |
| McFadden Ridge | Rock River, WY | 84.1 GWh | 33.7 mi |
| Medicine Bow | Medicine Bow, WY | 11.1 GWh | 23.6 mi |
| Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh | 42.4 mi |
| Rock Creek Wind | McFadden, WY | 427.8 GWh | 41.9 mi |
| Rolling Hills | Glenrock, WY | 244.8 GWh | 63.8 mi |
| Seminoe | Sinclair, WY | 137.0 GWh | 34.6 mi |
| Seven Mile Hill | Medicine Bow, WY | 399.8 GWh | 19.2 mi |
| Sinclair Oil Refinery | Sinclair, WY | 5.6 GWh | 52.7 mi |
| Top of the World Windpower Project | Glenrock, WY | 498.5 GWh | 56.5 mi |