Spanish Peaks Solar
TBD, Trinidad, CO 81082Plant Summary Information
Spanish Peaks Solar is ranked #41 out of 286 power plants in Colorado in terms of total annual net electricity generation.
Spanish Peaks Solar generated 67.0 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Spanish Peaks Solar |
|---|---|
| Utility Name | Spanish Peaks Solar LLC |
| Location | Las Animas County, CO |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 344.2 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,811 out of 12,613 Power Plants Nationwide | |
| Ranked #223 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #41 out of 286 Colorado Power Plants | |
| Ranked #6 out of 163 Colorado Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Juwi Inc (2018 to 2020) Spanish Peaks Solar LLC (2021 to 2024) |
Map of Spanish Peaks Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Spanish Peaks Solar.
Monthly Net Generation for Spanish Peaks Solar
Monthly Plant Fuel Consumption for Spanish Peaks Solar
Spanish Peaks Solar Details
| Summary Information | |
|---|---|
| Plant Name | Spanish Peaks Solar (62379) |
| Plant Address | TBD, Trinidad, CO 81082 |
| Utility | Spanish Peaks Solar LLC (64783) |
| Latitude, Longitude | 37.378, -104.475 |
| Generation Dates on File | Dec 2024 to Dec 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 344.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of Colorado (PSCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tri-State G & T Assn, Inc (30151) |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 47301 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 140 MW |
| Nameplate Power Factor | 0.947 |
| Summer Capacity | 140 MW |
| Winter Capacity | 140 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Planned Retirement | December 2058 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 0.1 |
| DC Net Capacity | 149 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Spanish Peaks Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #213 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
| #214 | Ray Ranch Solar | Pettus, TX | 352.6 GWh |
| #215 | Calhoun Solar | Battle Creek, MI | 352.4 GWh |
| #216 | Maverick Solar 7, LLC | Desert Center, CA | 352.1 GWh |
| #217 | Blythe Solar II, LLC | Blythe, CA | 337.0 GWh |
| #218 | Edwards Sanborn E1A | Mojave, CA | 332.6 GWh |
| #219 | Ganado Solar | Gail, TX | 339.9 GWh |
| #220 | West Memphis Solar Station | Crawfordsville, AR | 347.3 GWh |
| #221 | Samson Solar Energy | Cunningham, TX | 346.7 GWh |
| #222 | Agave | Arlington, AZ | 346.4 GWh |
| #224 | SR Russellville | Olmstead, KY | 343.7 GWh |
| #225 | Serrano | Marana, AZ | 324.7 GWh |
| #226 | Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh |
| #227 | Arlington Energy Center III | Blythe, CA | 320.9 GWh |
| #228 | Vikings Energy Farm | Holtville, CA | 314.9 GWh |
| #229 | Midway Solar - TX | Fort Stockton, TX | 332.5 GWh |
| #230 | Cass County Renewable Energy Center | Beardstown, IL | 331.8 GWh |
| #231 | Twin Lakes Solar LLC | Monticello, IN | 328.9 GWh |
| #232 | Hardin Solar Energy II LLC | Belle Center, OH | 328.8 GWh |
| #233 | Sun Streams 2 | Hassayampa, AZ | 328.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Spanish Peaks Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bighorn Solar 1 | Pueblo, CO | 582.5 GWh | 57.7 mi |
| Busch Ranch II Wind Farm | Walsenburg, CO | 139.0 GWh | 27 mi |
| Busch Ranch Wind Energy | Walsenburg, CO | 83.7 GWh | 29.2 mi |
| CEC Solar #1117, LLC | Pueblo, CO | 4.1 GWh | 62.7 mi |
| Cimarron Solar Facility | Springer, NM | 44.6 GWh | 63.5 mi |
| Comanche (CO) | Pueblo, CO | 4.2 TWh | 57.6 mi |
| Comanche Solar | Pueblo, CO | 227.7 GWh | 57.4 mi |
| CSU Pueblo | Pueblo, CO | 1.8 GWh | 64.4 mi |
| CSWIND America Inc. | Pueblo, CO | 27.2 GWh | 55.2 mi |
| Huerfano River Wind | Walsenburg, CO | 12.8 GWh | 33.5 mi |
| James W. Broderick Hydropower Plant | Pueblo, CO | 20.8 GWh | 63.1 mi |
| Kit Carson | Amalia, NM | 2.6 GWh | 60.2 mi |
| Peak View Wind Farm | Walsenburg, CO | 190.1 GWh | 23 mi |
| Rocky Mountain Solar | CO | 3.1 GWh | 53.8 mi |
| San Isabel Solar, LLC | Trinidad, CO | 69.3 GWh | 20.2 mi |
| Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 448.2 GWh | 55.5 mi |
| Thunder Wolf Energy Center Hybrid | Avondale, CO | 543.7 GWh | 56.3 mi |
| Trinidad (CO) | Trinidad, CO | 5.0 MWh | 13.8 mi |
| USS Giveback Solar LLC (CSG) | Pueblo, CO | 5.0 GWh | 54.3 mi |
| Vestas Towers America, Inc. | Pueblo, CO | 2.2 GWh | 55.5 mi |