Spanish Peaks Solar

TBD, Trinidad, CO 81082

Plant Summary Information

Spanish Peaks Solar is ranked #40 out of 286 power plants in Colorado in terms of total annual net electricity generation.

Spanish Peaks Solar generated 68.8 GWh during the 3-month period between November 2025 to February 2026.

Plant NameSpanish Peaks Solar
Utility NameSpanish Peaks Solar LLC
LocationLas Animas County, CO
Initial Operation DateDecember 2024
Last Update Feb 2026
Annual Generation 358.4 GWh
Annual Consumption 1.3 M MMBtu
Ranked #1,770 out of 12,637 Power Plants Nationwide
Ranked #214 out of 6,487 Solar Power Plants Nationwide
Ranked #40 out of 286 Colorado Power Plants
Ranked #6 out of 163 Colorado Solar Power Plants
Fuel Types Solar
Previous Operator Juwi Inc (2018 to 2020)
Spanish Peaks Solar LLC (2021 to 2024)

Map of Spanish Peaks Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Spanish Peaks Solar.

Create Your Account Today

Monthly Net Generation for Spanish Peaks Solar

Monthly Plant Fuel Consumption for Spanish Peaks Solar

Spanish Peaks Solar Details

Summary Information
Plant NameSpanish Peaks Solar (62379)
Plant AddressTBD, Trinidad, CO 81082
UtilitySpanish Peaks Solar LLC (64783)
Latitude, Longitude37.378, -104.475
Generation Dates on FileDec 2024 to Feb 2026
Initial Operation DateDecember 2024
Annual Generation 358.4 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityPublic Service Company of Colorado (PSCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceNA
Ash Impoundment
Transmission / Distribution OwnerTri-State G & T Assn, Inc (30151)
Grid Voltage 230.00 kV
Energy StorageNo

Generator 47301 Details Operating December 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity140 MW
Nameplate Power Factor0.947
Summer Capacity140 MW
Winter Capacity140 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2024
Planned RetirementDecember 2058
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Single Axis TrackingYes
Azimuth Angle180
Tilt Angle0.1
DC Net Capacity149 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Spanish Peaks Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#204Impact Solar 1Deport, TX366.3 GWh
#205Swift Air Solar IGoldsmith, TX364.7 GWh
#206BigBeau Solar, LLCRosamond, CA361.5 GWh
#207Solar Gen 2 Solar FacilityCalipatria, CA364.2 GWh
#208Blythe Solar IV, LLCBlythe, CA356.4 GWh
#209Hardy Hills Solar Energy LLCFrankfort, IN362.7 GWh
#210Twiggs SolarDry Branch, GA362.2 GWh
#211Samson Solar Energy II LLCCunningham, TX359.5 GWh
#212Lund Hill SolarBickleton, WA359.4 GWh
#213Hillcrest SolarMt. Orab, OH359.2 GWh
#215Newport Solar ProjectNewport, AR358.0 GWh
#216Pixley Solar EnergyPixley, KS357.6 GWh
#217Copper Mountain Solar 2Boulder City, NV356.1 GWh
#218Camilla Solar Energy ProjectCamilla, GA355.9 GWh
#219Darien SolarDarien, WI355.5 GWh
#220Driver SolarOsceola, AR355.3 GWh
#221Calhoun SolarBattle Creek, MI354.9 GWh
#222Ganado SolarGail, TX347.1 GWh
#223Centinela Solar EnergyCalexico, CA352.7 GWh
#224Blythe Solar II, LLCBlythe, CA336.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Spanish Peaks Solar.

Plant NamePlant LocationAnnual GenerationDistance
Bighorn Solar 1Pueblo, CO577.2 GWh57.7 mi
Busch Ranch II Wind FarmWalsenburg, CO143.7 GWh27 mi
Busch Ranch Wind EnergyWalsenburg, CO83.7 GWh29.2 mi
CEC Solar #1117, LLCPueblo, CO4.1 GWh62.7 mi
Cimarron Solar FacilitySpringer, NM44.6 GWh63.5 mi
Comanche (CO)Pueblo, CO3.2 TWh57.6 mi
Comanche SolarPueblo, CO223.8 GWh57.4 mi
CSU PuebloPueblo, CO1.8 GWh64.4 mi
CSWIND America Inc.Pueblo, CO27.2 GWh55.2 mi
Huerfano River WindWalsenburg, CO12.8 GWh33.5 mi
James W. Broderick Hydropower PlantPueblo, CO20.8 GWh63.1 mi
Kit CarsonAmalia, NM2.6 GWh60.2 mi
Peak View Wind FarmWalsenburg, CO190.1 GWh23 mi
Rocky Mountain SolarCO95.6 GWh53.8 mi
San Isabel Solar, LLCTrinidad, CO69.0 GWh20.2 mi
Sun Mountain Solar 1Unincorporated Pueblo, CO444.9 GWh55.5 mi
Thunder Wolf Energy Center HybridAvondale, CO537.1 GWh56.3 mi
Trinidad (CO)Trinidad, CO5.0 MWh13.8 mi
USS Giveback Solar LLC (CSG)Pueblo, CO5.0 GWh54.3 mi
Vestas Towers America, Inc.Pueblo, CO2.2 GWh55.5 mi