Lumina II Solar Project
12985 CR 1105, Snyder, TX 79549Plant Summary Information
Lumina II Solar Project is ranked #43 out of 7,027 solar farms nationwide in terms of total annual net electricity generation.
Lumina II Solar Project generated 199.3 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Lumina II Solar Project |
|---|---|
| Utility Name | Intersect USA, LLC |
| Location | Scurry County, TX |
| Initial Operation Date | January 2024 |
| Last Update | Jun 2026 |
| Annual Generation | 693.8 GWh |
| Annual Consumption | 2.6 M MMBtu |
| Ranked #1,025 out of 13,094 Power Plants Nationwide | |
| Ranked #43 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #189 out of 858 Texas Power Plants | |
| Ranked #17 out of 251 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
IP Lumina II, LLC (2021 to 2024) Intersect USA, LLC (2025 to 2025) |
Map of Lumina II Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lumina II Solar Project.
Monthly Net Generation for Lumina II Solar Project
Monthly Plant Fuel Consumption for Lumina II Solar Project
Lumina II Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Lumina II Solar Project (65644) |
| Plant Address | 12985 CR 1105, Snyder, TX 79549 |
| Utility | Intersect USA, LLC (67582) |
| Latitude, Longitude | 32.88353, -100.74639 |
| Generation Dates on File | Jan 2024 to Jun 2026 |
| Initial Operation Date | January 2024 |
| Annual Generation | 693.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 22-138-000, 24-141-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Wind Energy Transmission Texas LLC (60066) |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator LUMII Details Operating January 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ANDMSLR_ALL |
| Nameplate Capacity | 326.6 MW |
| Summer Capacity | 320 MW |
| Winter Capacity | 320 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 412.9 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator LU2BA Details Operating October 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ANDMDSLR_ALL |
| Nameplate Capacity | 160 MW |
| Summer Capacity | 160 MW |
| Winter Capacity | 160 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 320 |
|---|---|
| Maximum Charge Rate | 160 MW |
| Maximum Discharge Rate | 160 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 99 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 65644 |
| Direct Support Gen Id | LUMII |
| Support T D Asset | No |
Lumina II Solar Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #33 | Arica Solar | Desert Center, CA | 734.2 GWh |
| #34 | Atrisco Solar LLC | Rio Rancho, NM | 750.4 GWh |
| #35 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 728.3 GWh |
| #36 | Mammoth North Solar | Knox, IN | 746.1 GWh |
| #37 | Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 716.5 GWh |
| #38 | Rexford Solar Farm | Ducor, CA | 712.6 GWh |
| #39 | Juno Solar Project | Lamesa, TX | 735.7 GWh |
| #40 | Copper Mountain Solar 2 | Boulder City, NV | 726.0 GWh |
| #41 | Slate Hybrid | Stratford, CA | 698.2 GWh |
| #42 | Texas Solar Nova 1 | Spur, TX | 709.9 GWh |
| #44 | Peregrine Solar | Gollad, TX | 704.2 GWh |
| #45 | Copper Mountain Solar 5, LLC | Boulder City, NV | 698.4 GWh |
| #46 | Five Wells Solar Center - Hybrid | Rogers, TX | 677.1 GWh |
| #47 | Athos Solar Project | Desert Center, CA | 692.0 GWh |
| #48 | McCoy Solar Energy Project Hybrid | Blythe, CA | 638.7 GWh |
| #49 | Bright Arrow Solar, LLC | Sulphur Springs, TX | 671.9 GWh |
| #50 | Solar Blue | Lemoore, CA | 646.5 GWh |
| #51 | Prospero Solar | Andrews, TX | 678.4 GWh |
| #52 | Arlington Energy Center II | Blythe, CA | 640.6 GWh |
| #53 | AEUG Union Solar, LLC | West Mansfield, OH | 664.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lumina II Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amadeus Wind Farm | Rotan, TX | 694.5 GWh | 12 mi |
| Brazos Wind Farm | Fluvanna, TX | 655.2 GWh | 23.7 mi |
| Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh | 23.2 mi |
| Coyote Wind LLC | Snyder, TX | 697.9 GWh | 7.4 mi |
| Dermott Wind | Snyder, TX | 889.7 GWh | 13.3 mi |
| EG178 Facility | Snyder, TX | 796.0 GWh | 15.3 mi |
| Fluvanna | Fluvanna, TX | 562.2 GWh | 23.3 mi |
| Gopher Creek Wind Farm | Fluvanna, TX | 622.6 GWh | 26.8 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 321.2 GWh | 28.4 mi |
| Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 30.8 mi |
| Lumina Solar Project | Snyder, TX | 630.3 GWh | 13.8 mi |
| Mozart Wind Farm | Jayton, TX | 49.5 GWh | 14.2 mi |
| Post Wind Farm LP | Fluvanna, TX | 311.8 GWh | 27.6 mi |
| Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 904.9 GWh | 20.8 mi |
| Roscoe Wind Farm LLC | Roscoe, TX | 334.3 GWh | 29 mi |
| Scurry County Wind II | Snyder, TX | 164.9 GWh | 11.8 mi |
| Scurry County Wind LP | Snyder, TX | 252.2 GWh | 18.3 mi |
| Texas Solar Nova 1 | Spur, TX | 709.9 GWh | 33.1 mi |
| Texas Solar Nova 2 | Spur, TX | 565.7 GWh | 33.1 mi |
| WAL1272 | Snyder, TX | 257.0 MWh | 16.6 mi |