Directory of Power Plants in Ohio
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| DG AMP Solar Piqua Manier | DG AMP Solar, LLC | Piqua, OH | PJM Interconnection, LLC (PJM) | 21.8 GWh | Jun 2019 | Dec 2024 | Solar |
| DG AMP Rittman Rd | DG AMP Solar, LLC | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 3.5 GWh | Apr 2020 | Dec 2024 | Solar |
| DG AMP 1048 Wadsworth | DG AMP Solar, LLC | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 10.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Monroeville Solar | Solar Planet Power | Monroeville, OH | PJM Interconnection, LLC (PJM) | 3.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Parking Lot Array | Cincinnati Zoo & Botanical Garden | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 1.7 GWh | Apr 2011 | Dec 2024 | Solar |
| Progress Drive Generation Station | City of Shelby - (OH) | Shelby, OH | PJM Interconnection, LLC (PJM) | 103.0 MWh | Jun 2016 | Dec 2024 | Distillate Fuel Oil |
| POET Biorefining - Marion, LLC | POET Biorefining - Marion, LLC | Marion, OH | PJM Interconnection, LLC (PJM) | 27.0 GWh | Jul 2017 | Dec 2024 | Natural Gas |
| POET Biorefining - Fostoria | Fostoria Ethanol | Fostoria, OH | PJM Interconnection, LLC (PJM) | 19.8 GWh | Sep 2017 | Dec 2024 | Natural Gas |
| POET Biorefining - Leipsic, LLC | POET Biorefining - Leipsic, LLC | Leipsic, OH | PJM Interconnection, LLC (PJM) | 6.0 GWh | Jun 2017 | Dec 2024 | Natural Gas |
| Clyde Peaking Engine | AEP Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 641.0 MWh | Oct 2020 | Dec 2024 | Natural Gas |
| Wapakoneta-Pratt | Madison Energy Holdings LLC | Wapakoneta, OH | PJM Interconnection, LLC (PJM) | 23.7 GWh | Oct 2021 | Dec 2024 | Solar |
| KSU Trumbull | Madison Energy Holdings LLC | Warren, OH | PJM Interconnection, LLC (PJM) | 1.6 GWh | May 2021 | Dec 2024 | Solar |
| IGS AKC1 | Greenbacker Renewable Energy Corporation | Akron, OH | PJM Interconnection, LLC (PJM) | 4.5 GWh | Jun 2023 | Dec 2024 | Solar |
| IGS CMH4, LLC | Greenbacker Renewable Energy Corporation | Madison, OH | PJM Interconnection, LLC (PJM) | 6.7 GWh | Jun 2023 | Dec 2024 | Solar |
| IGS PCW1 | Greenbacker Renewable Energy Corporation | Rossford, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jun 2023 | Dec 2024 | Solar |
| PNA Rossford Solar Array | AEP Onsite Partners, LLC | Rossford, OH | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 2022 | Dec 2024 | Solar |
| Martin Marietta Wind Project | OEE XXXIII LLC | Woodville, OH | PJM Interconnection, LLC (PJM) | 7.2 GWh | Nov 2023 | Dec 2024 | Wind |
| Monroeville RTO BTM | American Mun Power-Ohio, Inc | Monroeville, OH | PJM Interconnection, LLC (PJM) | 153.0 MWh | Mar 2020 | Dec 2024 | Distillate Fuel Oil |
| Niles RTO BTM | American Mun Power-Ohio, Inc | Niles, OH | PJM Interconnection, LLC (PJM) | 526.0 MWh | Jan 2020 | Dec 2024 | Distillate Fuel Oil |
| Woodville RTO BTM | American Mun Power-Ohio, Inc | Woodville, OH | PJM Interconnection, LLC (PJM) | 144.0 MWh | Sep 2020 | Dec 2024 | Distillate Fuel Oil |
| Wadsworth IPS RTO BTM | American Mun Power-Ohio, Inc | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 606.0 MWh | Jul 2023 | Dec 2024 | Distillate Fuel Oil |
| Wadsworth HBS RTO BTM | American Mun Power-Ohio, Inc | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 608.0 MWh | Jan 2020 | Dec 2024 | Distillate Fuel Oil |
| Energy Developments, Hancock | Energy Developments, Inc d/b/a EDL | Findlay, OH | PJM Interconnection, LLC (PJM) | 20.6 GWh | Aug 2014 | Dec 2024 | Landfill Gas |
| Buckeye Power Inc. | Township Road 215 Solar Project 2021, LLC | Marion, OH | PJM Interconnection, LLC (PJM) | 3.6 GWh | Jun 2022 | Dec 2024 | Solar |
| Minster 3 | Madison Energy Investments LLC | Minster, OH | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2022 | Dec 2024 | Solar |
| Sycamore | Madison Energy Investments LLC | Sycamore, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Nov 2023 | Dec 2024 | Solar |
| 3100 Valleyview Drive | Madison Energy Investments LLC | Columbus, OH | PJM Interconnection, LLC (PJM) | 548.0 MWh | Jul 2023 | Dec 2024 | Solar |
| Sauder Power Plant | Sauder Woodworking Co | Archbold, OH | PJM Interconnection, LLC (PJM) | 7.4 GWh | Sep 1993 | Apr 2025 | Wood/Wood Waste Solids : 99.3% Natural Gas : 0.7% |
| Pixelle Specialty Solutions LLC - Chilli | Pixelle Specialty Solution, LLC | Chillicothe, OH | PJM Interconnection, LLC (PJM) | 272.9 GWh | Jan 1952 | Jun 2025 | Black Liquor : 41.8% Natural Gas : 41.1% Wood/Wood Waste Solids : 14.2% Tire-derived Fuels : 2.1% Distillate Fuel Oil : 0.7% |
| Toledo Ref Power Recovery Train | Toledo Refining Company | Oregon, OH | PJM Interconnection, LLC (PJM) | 81.5 MWh | May 1986 | Jul 2025 | Petroleum Coke |
| East Campus Utility Plant | University of Cincinnati | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 495.9 MWh | Jun 2006 | Aug 2025 | Distillate Fuel Oil |
| Broshco Fabricated Products | Broshco Fabricated Products | Mansfield, OH | PJM Interconnection, LLC (PJM) | 281.0 MWh | Aug 2001 | Aug 2025 | Natural Gas |
| Cardinal | Cardinal Operating Company | Brillant, OH | PJM Interconnection, LLC (PJM) | 10.1 TWh | Jan 1967 | Sep 2025 | Bituminous Coal : 99.7% |
| Miami Fort | Luminant Miami Fort | North Bend, OH | PJM Interconnection, LLC (PJM) | 6.4 TWh | Oct 1960 | Sep 2025 | Bituminous Coal : 99.8% |
| Kyger Creek | Ohio Valley Electric Corp | Cheshire, OH | PJM Interconnection, LLC (PJM) | 5.5 TWh | Jan 1955 | Sep 2025 | Bituminous Coal : 95.9% Subbituminous Coal : 4.0% |
| Perry | Energy Harbor Nuclear Generation LLC | Perry, OH | PJM Interconnection, LLC (PJM) | 9.3 TWh | Oct 1987 | Sep 2025 | Nuclear |
| Davis Besse | Energy Harbor Nuclear Generation LLC | Oak Harbor, OH | PJM Interconnection, LLC (PJM) | 7.8 TWh | Oct 1977 | Sep 2025 | Nuclear |
| Woodsdale | Duke Energy Kentucky Inc | Trenton, OH | PJM Interconnection, LLC (PJM) | 359.0 GWh | Apr 1992 | Sep 2025 | Natural Gas : 98.6% Distillate Fuel Oil : 1.4% |
| Gavin Power, LLC | Gavin Power, LLC | Cheshire, OH | PJM Interconnection, LLC (PJM) | 13.3 TWh | Sep 1974 | Sep 2025 | Bituminous Coal : 99.5% |
| Cleveland Works | Cleveland Cliffs | Cleveland, OH | PJM Interconnection, LLC (PJM) | 359.3 GWh | Dec 1949 | Sep 2025 | Blast Furnace Gas : 53.3% Natural Gas : 46.7% |
| Dresden Energy Facility | Appalachian Power Co | Dresden, OH | PJM Interconnection, LLC (PJM) | 4.2 TWh | Jan 2012 | Sep 2025 | Natural Gas |
| Washington Energy Facility | Dynegy Washington Energy Facility | Beverly, OH | PJM Interconnection, LLC (PJM) | 3.5 TWh | May 2002 | Sep 2025 | Natural Gas |
| Waterford Power, LLC | Waterford Power, LLC | Waterford, OH | PJM Interconnection, LLC (PJM) | 5.0 TWh | Jul 2003 | Sep 2025 | Natural Gas |
| Fremont Energy Center | American Mun Power-Ohio, Inc | Fremont, OH | PJM Interconnection, LLC (PJM) | 4.1 TWh | Dec 2011 | Sep 2025 | Natural Gas |
| Hanging Rock Energy Facility | Dynegy Hanging Rock Energy Facility | Ironton, OH | PJM Interconnection, LLC (PJM) | 9.0 TWh | May 2003 | Sep 2025 | Natural Gas |
| Ashtabula | DTE Ashtabula, LLC | Ashtabula, OH | PJM Interconnection, LLC (PJM) | 171.9 GWh | Jan 2001 | Sep 2025 | Natural Gas |
| Wyandot Solar Farm | Wyandot Solar LLC | Upper Sandusky, OH | PJM Interconnection, LLC (PJM) | 10.7 GWh | Mar 2010 | Sep 2025 | Solar |
| Blue Creek Wind Project | Avangrid Power LLC | Paulding, OH | PJM Interconnection, LLC (PJM) | 787.6 GWh | Nov 2011 | Sep 2025 | Wind |
| Paulding Wind Farm II | Paulding Wind Farm II LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 310.5 GWh | Jun 2011 | Sep 2025 | Wind |
| Central Utility Plant Cincinnati | University of Cincinnati | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 223.1 GWh | May 2004 | Sep 2025 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Summit Street Power Plant | Kent State University | Kent, OH | PJM Interconnection, LLC (PJM) | 31.2 GWh | Dec 2002 | Sep 2025 | Natural Gas : 99.9% |
| Scioto Ridge Wind Farm | Big Sky Wind, LLC | Belle Center, OH | PJM Interconnection, LLC (PJM) | 537.1 GWh | Apr 2021 | Sep 2025 | Wind |
| Akron WRF | City of Akron | Akron, OH | PJM Interconnection, LLC (PJM) | 5.8 GWh | Apr 2014 | Sep 2025 | Other Biomass Gas |
| Northwest Ohio Wind | Northwest Ohio Wind, LLC | Haviland, OH | PJM Interconnection, LLC (PJM) | 276.4 GWh | Aug 2018 | Sep 2025 | Wind |
| Middletown Energy Center | Ohio Power Partners, LLC | Middletown, OH | PJM Interconnection, LLC (PJM) | 3.2 TWh | Apr 2018 | Sep 2025 | Natural Gas |
| Foxconn Ohio | Foxconn | Warren, OH | PJM Interconnection, LLC (PJM) | 184.0 MWh | Dec 2014 | Sep 2025 | Solar |
| Oregon Clean Energy Center | Oregon Clean Energy Center | Oregon, OH | PJM Interconnection, LLC (PJM) | 5.9 TWh | Jun 2017 | Sep 2025 | Natural Gas |
| Carroll County Energy | Carroll County Energy LLC | Carrollton, OH | PJM Interconnection, LLC (PJM) | 5.3 TWh | Nov 2017 | Sep 2025 | Natural Gas |
| Harpster Wind | OEE XVII, LLC | Harpster, OH | PJM Interconnection, LLC (PJM) | 3.1 GWh | Dec 2015 | Sep 2025 | Wind |
| South Field Energy | South Field Energy, LLC | Wellsville, OH | PJM Interconnection, LLC (PJM) | 8.0 TWh | Jul 2021 | Sep 2025 | Natural Gas |
| Clean Energy Future-Lordstown, LLC | Clean Energy Future-Lordstown, LLC | Lordstown, OH | PJM Interconnection, LLC (PJM) | 6.5 TWh | Sep 2018 | Sep 2025 | Natural Gas |
| Paulding Wind Farm III | Paulding Wind Farm III LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 311.2 GWh | Nov 2016 | Sep 2025 | Wind |
| Ohio Northern University Solar Site | AEP Onsite Partners, LLC | Ada, OH | PJM Interconnection, LLC (PJM) | 4.0 GWh | Nov 2016 | Sep 2025 | Solar |
| Clyde Solar Array | AEP Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 3.9 GWh | May 2016 | Sep 2025 | Solar |
| Long Ridge Energy Generation | Long Ridge Energy Generation LLC | Hannibal, OH | PJM Interconnection, LLC (PJM) | 3.9 TWh | Sep 2021 | Sep 2025 | Natural Gas |
| Hog Creek Wind Project | Hog Creek Wind Project LLC | Ada, OH | PJM Interconnection, LLC (PJM) | 198.1 GWh | Nov 2017 | Sep 2025 | Wind |
| Denison Solar Array | AEP Onsite Partners, LLC | Granville, OH | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2017 | Sep 2025 | Solar |
| Hillcrest Solar | Hillcrest Solar I, LLC | Mt. Orab, OH | PJM Interconnection, LLC (PJM) | 374.6 GWh | Jun 2021 | Sep 2025 | Solar |
| Hecate Energy Highland LLC | Hecate Energy Highland LLC | Buford, OH | PJM Interconnection, LLC (PJM) | 602.1 GWh | Apr 2024 | Sep 2025 | Solar |
| Timber Road IV | Paulding Wind Farm IV LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 384.3 GWh | Dec 2019 | Sep 2025 | Wind |
| Guernsey Power Station | Guernsey Power Station LLC | Byesville, OH | PJM Interconnection, LLC (PJM) | 11.4 TWh | Jan 2023 | Sep 2025 | Natural Gas |
| Hardin Solar Energy LLC | Dominion Renewable Energy | Alger, OH | PJM Interconnection, LLC (PJM) | 293.0 GWh | Jan 2021 | Sep 2025 | Solar |
| Shelby Solar Array | AEP Onsite Partners, LLC | Shelby, OH | PJM Interconnection, LLC (PJM) | 3.2 GWh | Nov 2019 | Sep 2025 | Solar |
| Hardin Solar Energy II LLC | Invenergy Services LLC | Belle Center, OH | PJM Interconnection, LLC (PJM) | 289.0 GWh | Nov 2024 | Sep 2025 | Solar |
| Willowbrook Solar I, LLC | Big Sky Wind, LLC | Morystown, OH | PJM Interconnection, LLC (PJM) | 284.8 GWh | Aug 2024 | Sep 2025 | Solar |
| Big Plain Solar, LLC | Leeward Asset Management, LLC | London, OH | PJM Interconnection, LLC (PJM) | 397.5 GWh | Aug 2023 | Sep 2025 | Solar |
| AEUG Union Solar, LLC | Acciona Energy USA Global, LLC | West Mansfield, OH | PJM Interconnection, LLC (PJM) | 599.5 GWh | Oct 2024 | Sep 2025 | Solar |
| Yellowbud Solar, LLC | Yellowbud Solar LLC | Williamsport, OH | PJM Interconnection, LLC (PJM) | 515.0 GWh | May 2023 | Sep 2025 | Solar |
| New Market Solar | New Market Solar | Sardinia, OH | PJM Interconnection, LLC (PJM) | 70.5 GWh | Jun 2023 | Sep 2025 | Solar |
| Nestlewood Solar | Nestlewood Solar | Hamersville, OH | PJM Interconnection, LLC (PJM) | 158.4 GWh | Nov 2023 | Sep 2025 | Solar |
| Salt City Solar Project - Hybrid | Salt City Solar LLC | Circleville, OH | PJM Interconnection, LLC (PJM) | 105.1 GWh | Apr 2023 | Sep 2025 | Solar |
| Ross County Solar, LLC | Ross County Solar, LLC | Greenfield, OH | PJM Interconnection, LLC (PJM) | 185.9 GWh | - | Sep 2025 | Solar |
| Arche Energy Project, LLC | Lightsource Renewable Energy Asset Management, LLC | Fulton, OH | PJM Interconnection, LLC (PJM) | 191.5 GWh | Dec 2023 | Sep 2025 | Solar |
| Powell Creek Solar | Avangrid Power LLC | Miller City, OH | PJM Interconnection, LLC (PJM) | 174.8 GWh | - | Sep 2025 | Solar |
| Madison Fields Solar Project, LLC | Madison Fields Solar Project, LLC | Irwin, OH | PJM Interconnection, LLC (PJM) | 381.5 GWh | Dec 2023 | Sep 2025 | Solar |
| Blue Harvest Solar Park | Blue Harvest Solar Park LLC | Continental, OH | PJM Interconnection, LLC (PJM) | 101.4 GWh | Nov 2023 | Sep 2025 | Solar |
| Timber Road Solar Park | Timber Road Solar Park | Payne, OH | PJM Interconnection, LLC (PJM) | 100.5 GWh | Nov 2023 | Sep 2025 | Solar |
| Fayette Solar | National Grid Renewables | Greenfield, OH | PJM Interconnection, LLC (PJM) | 75.4 GWh | - | Sep 2025 | Solar |
| Fox Squirrel Solar | EDF Renewable Asset Holdings, Inc. | Mt Sterling, OH | PJM Interconnection, LLC (PJM) | 1.1 TWh | Nov 2023 | Sep 2025 | Solar |
| Clearview Solar 1 | Clearview Solar I, LLC | Quincy, OH | PJM Interconnection, LLC (PJM) | 234.4 GWh | Nov 2024 | Sep 2025 | Solar |
| Wheatsborough Solar | Wheatsborough Solar, LLC | Bellevue, OH | PJM Interconnection, LLC (PJM) | 52.7 GWh | - | Sep 2025 | Solar |
| Hardin Solar III | Hardin Solar Energy III | Alger, OH | PJM Interconnection, LLC (PJM) | 390.8 GWh | - | Sep 2025 | Solar |
| Buckeye Solar | Dominion Renewable Energy | Williamsport, OH | PJM Interconnection, LLC (PJM) | 167.8 GWh | - | Sep 2025 | Solar |
| Pickaway Solar | Dominion Renewable Energy | Williamsport, OH | PJM Interconnection, LLC (PJM) | 156.8 GWh | - | Sep 2025 | Solar |