Shelby Solar Array

129 West State Street, Shelby, OH 44875

Plant Summary Information

Shelby Solar Array is ranked #51 out of 76 solar farms in Ohio in terms of total annual net electricity generation.

Shelby Solar Array generated 816.0 MWh during the 3-month period between March 2026 to June 2026.

Plant NameShelby Solar Array
Utility NameOnsite Partners, LLC
LocationRichland County, OH
Initial Operation DateDecember 2019
Last Update Jun 2026
Annual Generation 3.0 GWh
Annual Consumption 11.8 k MMBtu
Ranked #9,841 out of 13,094 Power Plants Nationwide
Ranked #4,853 out of 7,027 Solar Power Plants Nationwide
Ranked #131 out of 208 Ohio Power Plants
Ranked #51 out of 76 Ohio Solar Power Plants
Fuel Types Solar
Previous Operators AEP Onsite Partners (2019 to 2019)
AEP Onsite Partners, LLC (2020 to 2024)
Onsite Partners, LLC (2025 to 2025)

Map of Shelby Solar Array

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Shelby Solar Array.

Create Your Account Today

Monthly Net Generation for Shelby Solar Array

Monthly Plant Fuel Consumption for Shelby Solar Array

Shelby Solar Array Details

Summary Information
Plant NameShelby Solar Array (63390)
Plant Address129 West State Street, Shelby, OH 44875
UtilityOnsite Partners, LLC (60571)
Latitude, Longitude40.89604, -82.6724
Generation Dates on FileJan 2020 to Jun 2026
Initial Operation DateDecember 2019
Annual Generation 3.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number20-320-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC (PJM)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerCity of Shelby - (OH) (17043) OH
Grid Voltage 12.47 kV
Energy StorageNo

Generator SHBOH Details Operating December 2019

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.9 MW
Summer Capacity1.9 MW
Winter Capacity1.9 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2019
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
DC Net Capacity2.5 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Shelby Solar Array Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4843GrabinskiWalden, NY3.1 GWh
#4844Rio Rico SolarRio Rico, AZ3.0 GWh
#4845Reisender SolarEllenville, NY3.0 GWh
#4846Ashby Duffy CSG Solar FarmAshby, MA3.0 GWh
#4847Pima Community College NWTucson, AZ3.0 GWh
#4848Oak Leaf - CSG Portfolio (OL 38)Watkins, CO3.0 GWh
#4849HesperiaHesperia, CA3.0 GWh
#4850Breesport Road Community Solar FarmBaldwin, NY3.0 GWh
#4851Arrache 8083Palmdale, CA3.0 GWh
#4852Steel Sun 2: 2303-III-4 Hamburg TpkeLackawanna, NY3.0 GWh
#4854Lakeville SolarLakeville, MA3.0 GWh
#4855Seaboard Charlton, LLCCharlton, MA3.0 GWh
#4856Hoppe Nitzberg Solar 1AKingston, IL3.0 GWh
#4857Yellow Mills Rd #2 Community Solar FarmFarmington, NY3.0 GWh
#4858Bighorn SolarSalem, OR3.0 GWh
#4859PAC Aviation SolarVan Nuys, CA3.0 GWh
#4860Time Warner Cable - KnowlesBath, NY3.0 GWh
#4861SCE-Snowline-Duncan Road (North)Phelan, CA3.0 GWh
#4862Lindberg FIeld SolarSan Diego, CA3.0 GWh
#4863Coyote Ridge Community SolarFort Collins, CO3.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Shelby Solar Array.

Plant NamePlant LocationAnnual GenerationDistance
Broshco Fabricated ProductsMansfield, OH128.0 MWh9.9 mi
Clyde Peaking EngineClyde, OH641.0 MWh31.4 mi
Clyde Solar ArrayClyde, OH3.4 GWh33.5 mi
GalionGalion, OH262.0 MWh13.1 mi
Galion Generating StationGalion, OH2.5 GWh13.8 mi
Harpster WindHarpster, OH3.1 GWh31.6 mi
Marion County Solar ProjectMarion, OH72.9 GWh30.7 mi
Monroeville RTO BTMMonroeville, OH124.0 MWh24.1 mi
Monroeville SolarMonroeville, OH2.5 GWh23.2 mi
North American - Erie Generating StationMilan, OH10.0 GWh30.6 mi
POET Biorefining - Marion, LLCMarion, OH23.6 GWh31.7 mi
Progress Drive Generation StationShelby, OH22.0 MWh29 mi
Shelby NorthShelby, OH66.0 MWh0.5 mi
Shelby SouthShelby, OH111.0 MWh1.3 mi
SycamoreSycamore, OH1.7 GWh25.8 mi
Sycamore Creek Solar, LLCNew Washington, OH89.5 GWh10.5 mi
WellingtonWellington, OH46.0 MWh29.6 mi
Wheatsborough SolarBellevue, OH205.3 GWh31.6 mi
Whirlpool Corporation - Marion Wind FarmMarion, OH5.7 GWh33.8 mi
Wyandot Solar FarmUpper Sandusky, OH10.7 GWh33.7 mi