Great Bend Solar Project
26317 Cleek Road, Portland, OH 45770Plant Summary Information
Great Bend Solar Project is ranked #30 out of 76 solar farms in Ohio in terms of total annual net electricity generation.
Great Bend Solar Project generated 32.1 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Great Bend Solar Project |
|---|---|
| Utility Name | Great Bend Solar LLC |
| Location | Meigs County, OH |
| Initial Operation Date | December 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 51.9 GWh |
| Annual Consumption | 177.2 k MMBtu |
| Ranked #4,183 out of 13,094 Power Plants Nationwide | |
| Ranked #1,132 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #76 out of 208 Ohio Power Plants | |
| Ranked #30 out of 76 Ohio Solar Power Plants | |
| Fuel Types | Solar |
Map of Great Bend Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Great Bend Solar Project.
Monthly Net Generation for Great Bend Solar Project
Monthly Plant Fuel Consumption for Great Bend Solar Project
Great Bend Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Great Bend Solar Project (67834) |
| Plant Address | 26317 Cleek Road, Portland, OH 45770 |
| Utility | Great Bend Solar LLC (66409) |
| Latitude, Longitude | 39.00333, -81.77111 |
| Generation Dates on File | Dec 2025 to Jun 2026 |
| Initial Operation Date | December 2025 |
| Annual Generation | 51.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Ohio Power Co (14006) OH |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator GBSP1 Details Operating December 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | RAVENSWO 69 KV T1 |
| Nameplate Capacity | 48 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Bifacial | Yes |
| Azimuth Angle | 90 |
| Tilt Angle | 6 |
| DC Net Capacity | 58 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Great Bend Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1122 | Portal Ridge Solar B, LLC | Lancaster, CA | 52.7 GWh |
| #1123 | EE Waianae Solar Project | Waianae, HI | 52.7 GWh |
| #1124 | SEPV Mojave West | Mojave, CA | 52.7 GWh |
| #1125 | Innovative Solar 47 | Maxton, NC | 52.4 GWh |
| #1126 | CED Ducor 1 | Ducor, CA | 52.3 GWh |
| #1127 | Mountain View Solar | North Las Vegas, NV | 52.3 GWh |
| #1128 | Techren Solar III LLC | Boulder, NV | 52.3 GWh |
| #1129 | Western Antelope Blue Sky B | Lancaster, CA | 52.2 GWh |
| #1130 | Rio Bravo Solar 1 LLC | McKittrick, CA | 52.1 GWh |
| #1131 | Baxley | Baxley, GA | 52.0 GWh |
| #1133 | Atwell Island West Solar | Alpaugh, CA | 51.9 GWh |
| #1134 | CED Ducor 4 | Ducor, CA | 51.8 GWh |
| #1135 | Rio Bravo Solar II LLC | McKittrick, CA | 51.7 GWh |
| #1136 | CED Ducor 2 | Ducor, CA | 51.6 GWh |
| #1137 | Fort Gordon Solar Facility | Fort Gordon, GA | 51.4 GWh |
| #1138 | Cascade Solar | Joshua Tree, CA | 51.4 GWh |
| #1139 | RE Rosamond One LLC | Rosamond, CA | 51.2 GWh |
| #1140 | RE Gaskell West 3 LLC | Rosamond, CA | 50.8 GWh |
| #1141 | Pumpjack Solar I | McKittrick, CA | 50.6 GWh |
| #1142 | RE Kansas South LLC | Lemoore, CA | 50.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Great Bend Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anadarko | Woodsfield, OH | 42.0 MWh | 62.7 mi |
| Belleville Dam | Belleville, WV | 256.9 GWh | 8.2 mi |
| BHER Ravenswood Solar 1 | Milwood, WV | 11.9 GWh | 6.8 mi |
| Ceredo Generating Station | Huntington, WV | 885.9 GWh | 60.2 mi |
| Gavin Power, LLC | Cheshire, OH | 12.9 TWh | 19.1 mi |
| Hanging Rock Energy Facility | Ironton, OH | 9.9 TWh | 62.1 mi |
| Haverhill North Cogeneration Facility | Franklin Furnace, OH | 320.2 GWh | 63.5 mi |
| John E Amos | St Albans, WV | 8.7 TWh | 36.7 mi |
| Kyger Creek | Cheshire, OH | 5.0 TWh | 20.2 mi |
| London | Handley, WV | 64.1 GWh | 59.9 mi |
| Marmet | Marmet, WV | 67.6 GWh | 53 mi |
| Mountaineer | New Haven, WV | 6.8 TWh | 8.9 mi |
| Pleasants Energy LLC | St Mary's, WV | 1.9 TWh | 31.5 mi |
| Pleasants Power Station | Willow Island, WV | 1.1 TWh | 35.8 mi |
| Racine | Racine, OH | 190.0 GWh | 9.5 mi |
| Rolling Hills Generating | Wilkesville, OH | 2.0 TWh | 30.7 mi |
| Washington Energy Facility | Beverly, OH | 4.8 TWh | 40.3 mi |
| Waterford Power, LLC | Waterford, OH | 6.8 TWh | 36.7 mi |
| Willow Island Hydroelectric Plant | Willow Island, WV | 198.3 GWh | 34.5 mi |
| Winfield | Winfield, WV | 93.0 GWh | 33.8 mi |