Perry
10 Center Road, Perry, OH 44081Plant Summary Information
Perry is ranked #34 out of 54 nuclear power plants nationwide in terms of total annual net electricity generation.
Perry is comprised of 1 generator and generated 2.8 TWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Perry |
|---|---|
| Utility Name | Energy Harbor Nuclear Generation LLC |
| Location | Lake County, OH |
| Initial Operation Date | November 1987 |
| Last Update | May 2026 |
| Annual Generation | 11.0 TWh |
| Annual Consumption | 124.2 M MMBtu |
| Ranked #55 out of 13,081 Power Plants Nationwide | |
| Ranked #34 out of 54 Nuclear Power Plants Nationwide | |
| Ranked #3 out of 206 Ohio Power Plants | |
| Ranked #1 out of 2 Ohio Nuclear Power Plants | |
| Fuel Types | Nuclear |
| Previous Operator |
FirstEnergy Nuclear Operating Company (2013 to 2019) Energy Harbor Nuclear Generation LLC (2020 to 2025) |
Map of Perry
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Perry.
Monthly Net Generation for Perry
Monthly Plant Fuel Consumption for Perry
Perry Details
| Summary Information | |
|---|---|
| Plant Name | Perry (6020) |
| Plant Address | 10 Center Road, Perry, OH 44081 |
| Utility | Energy Harbor Nuclear Generation LLC (64225) |
| Latitude, Longitude | 41.8006, -81.1439 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | November 1987 |
| Annual Generation | 11.0 TWh |
| Fuel Types | Nuclear |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Lake Erie |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Cleveland Electric Illum Co (3755) OH |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 1 Details Operating November 1987
| Technology | Nuclear |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 1311.6 MW |
| Nameplate Power Factor | 0.92 |
| Summer Capacity | 1240 MW |
| Winter Capacity | 1268 MW |
| Minimum Load | 133 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1987 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Nuclear |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Planned Net Summer Capacity Uprate | 213 MW |
| Planned Net Winter Capacity Uprate | 213 MW |
| Planned Uprate | July 2031 |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Perry Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Nuclear.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #24 | Brunswick Nuclear | Southport, NC | 15.3 TWh |
| #25 | Quad Cities Generating Station | Cordova, IL | 15.2 TWh |
| #26 | Dresden Generating Station | Morris, IL | 15.1 TWh |
| #27 | Calvert Cliffs Nuclear Power Plant | Lusby, MD | 14.9 TWh |
| #28 | Joseph M Farley | Columbia, AL | 14.7 TWh |
| #29 | Beaver Valley | Shippingport, PA | 14.5 TWh |
| #30 | Arkansas Nuclear One | Russellville, AR | 14.1 TWh |
| #31 | Edwin I Hatch | Baxley, GA | 13.9 TWh |
| #32 | Turkey Point | Homestead, FL | 19.8 TWh |
| #33 | Surry | Surry, VA | 12.2 TWh |
| #35 | Point Beach Nuclear Plant | Two Rivers, WI | 10.0 TWh |
| #36 | Grand Gulf | Port Gibson, MS | 10.0 TWh |
| #37 | Seabrook | Seabrook, NH | 9.9 TWh |
| #38 | Waterford 3 | Killona, LA | 9.5 TWh |
| #39 | Wolf Creek Generating Station | Burlington, KS | 9.3 TWh |
| #40 | Columbia Generating Station | Richland, WA | 9.1 TWh |
| #41 | Callaway | Fulton, MO | 9.0 TWh |
| #42 | Prairie Island | Welch, MN | 8.8 TWh |
| #43 | PSEG Hope Creek Generating Station | Hancocks Bridge, NJ | 8.8 TWh |
| #44 | Clinton Power Station | Clinton, IL | 8.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Perry.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ashtabula | Ashtabula, OH | 159.0 GWh | 20.6 mi |
| Cleveland Peaking | Cleveland, OH | 547.0 MWh | 28.5 mi |
| Cleveland Thermal | Cleveland, OH | 1.2 GWh | 34.3 mi |
| Cleveland Works | Cleveland, OH | 380.5 GWh | 35.4 mi |
| Collinwood BioEnergy Facility | Cleveland, OH | 2.8 GWh | 28.5 mi |
| Cuyahoga County Landfill | Brooklyn, OH | 4.6 GWh | 39.9 mi |
| Cuyahoga Generating Facility | Solon, OH | 3.8 GWh | 33.7 mi |
| Euclid Farm, Stamco N-54 | Euclid, OH | 1.1 GWh | 22.8 mi |
| Foxconn Ohio | Warren, OH | 160.0 MWh | 47.1 mi |
| Geneva | Geneva, OH | 16.4 GWh | 12.1 mi |
| Girard (PA) RTO BTM | Girard, PA | 215.0 MWh | 44.6 mi |
| KSU Trumbull | Warren, OH | 1.5 GWh | 39.4 mi |
| LE Wind Turbine 1 | Euclid, OH | 1.8 GWh | 24.7 mi |
| MCCo Solar Generating Facility | Cleveland, OH | 1.1 GWh | 30.5 mi |
| Middletown- Ohio | Lordstown, OH | 6.5 TWh | 47.5 mi |
| Niles Power Plant | Niles, OH | 182.0 MWh | 48.3 mi |
| Niles RTO BTM | Niles, OH | 283.0 MWh | 48.2 mi |
| Painesville | Painesville, OH | 1.2 GWh | 7.6 mi |
| Summit Street Power Plant | Kent, OH | 30.5 GWh | 46.6 mi |
| Trumbull Energy Center | Warren, OH | 569.2 GWh | 47.6 mi |