Cuyahoga Falls 1
2554 Bailey Rd., Cuyahoga Falls, OH 44221Plant Summary Information
Cuyahoga Falls 1 is ranked #14 out of 55 distillate fuel oil power plants in Ohio in terms of total annual net electricity generation.
Cuyahoga Falls 1 is comprised of 9 generators and generated 232.7 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Cuyahoga Falls 1 |
|---|---|
| Utility Name | City of Cuyahoga Falls - (OH) |
| Location | Summit County, OH |
| Initial Operation Date | July 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 866.0 MWh |
| Annual Consumption | 10.4 k MMBtu |
| Ranked #12,066 out of 13,081 Power Plants Nationwide | |
| Ranked #494 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #162 out of 206 Ohio Power Plants | |
| Ranked #14 out of 55 Ohio Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Cuyahoga Falls 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cuyahoga Falls 1.
Monthly Net Generation for Cuyahoga Falls 1
Monthly Plant Fuel Consumption for Cuyahoga Falls 1
Cuyahoga Falls 1 Details
| Summary Information | |
|---|---|
| Plant Name | Cuyahoga Falls 1 (62658) |
| Plant Address | 2554 Bailey Rd., Cuyahoga Falls, OH 44221 |
| Utility | City of Cuyahoga Falls - (OH) (4683) |
| Latitude, Longitude | 41.14177, -81.47454 |
| Generation Dates on File | Jul 2018 to Dec 2025 |
| Initial Operation Date | July 2018 |
| Annual Generation | 866.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | N/A |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Cuyahoga Falls - (OH) (4683) OH |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator P001 Details Operating July 2018
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator P002 Details Operating July 2018
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator P003 Details Operating July 2018
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator P004 Details Operating July 2018
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator P005 Details Operating July 2018
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator P006 Details Operating July 2018
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CF2-1 Details Operating June 2020
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CF2-2 Details Operating June 2020
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CF2-3 Details Operating June 2020
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Cuyahoga Falls 1 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #484 | McPherson 3 | McPherson, KS | 7.5 GWh |
| #485 | Nottoway Diesel Generating Facility | Courtland, VA | 953.0 MWh |
| #486 | Chester Generating Station | Chester, PA | 944.0 MWh |
| #487 | SEMASS Resource Recovery | West Wareham, MA | 553.0 GWh |
| #488 | Powell Valley | Kyles Ford, TN | 934.0 MWh |
| #489 | Wicomico | Salisbury, MD | 14.0 GWh |
| #490 | Valdez | Valdez, AK | 892.0 MWh |
| #491 | Fort Lupton | Ft. Lupton, CO | 15.1 GWh |
| #492 | New Ulm | New Ulm, MN | 2.1 GWh |
| #493 | Alamosa | Alamosa, CO | 27.2 GWh |
| #495 | McMinnville | McMinnville, TN | 865.0 MWh |
| #496 | MMSD Jones Island Wastewater | Milwaukee, WI | 83.3 GWh |
| #497 | Richmond | Centerville, IN | 45.1 GWh |
| #498 | Central Utility Plant at White Oak | Silver Spring, MD | 96.0 GWh |
| #499 | Somerset Plant | Skowhegan, ME | 567.7 GWh |
| #500 | Westwood Generation LLC | Tremont, PA | 147.0 GWh |
| #501 | Backus Microgrid Project | Norwich, CT | 843.0 MWh |
| #502 | Erving Paper Mills | Erving, MA | 41.9 GWh |
| #503 | Hayden | Hayden, CO | 1.6 TWh |
| #504 | Hazelton | Hazelton, PA | 8.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cuyahoga Falls 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Akron WRF | Akron, OH | 5.6 GWh | 5 mi |
| Cleveland Peaking | Cleveland, OH | 547.0 MWh | 29.3 mi |
| Cleveland Thermal | Cleveland, OH | 1.2 GWh | 27.6 mi |
| Cleveland Works | Cleveland, OH | 380.5 GWh | 25.1 mi |
| Collinwood BioEnergy Facility | Cleveland, OH | 2.8 GWh | 29.2 mi |
| Cuyahoga County Landfill | Brooklyn, OH | 4.6 GWh | 25.3 mi |
| Cuyahoga Generating Facility | Solon, OH | 3.8 GWh | 16.5 mi |
| DG AMP 1048 Wadsworth | Wadsworth, OH | 10.4 GWh | 17.5 mi |
| DG AMP Rittman Rd | Wadsworth, OH | 3.4 GWh | 17.4 mi |
| DG AMP Solar Orrville 3 | Orrville, OH | 3.2 GWh | 24.7 mi |
| IGS AKC1 | Akron, OH | 4.4 GWh | 8.5 mi |
| LE Wind Turbine 1 | Euclid, OH | 1.8 GWh | 30.7 mi |
| MCCo Solar Generating Facility | Cleveland, OH | 1.1 GWh | 26.7 mi |
| Morton Salt Rittman | Rittman, OH | 14.3 GWh | 19.7 mi |
| Orrville | Orrville, OH | 29.3 GWh | 25.2 mi |
| Orrville Peaking | Orrville, OH | 271.0 MWh | 24.5 mi |
| Seville | Seville, OH | 260.0 MWh | 22 mi |
| Summit Street Power Plant | Kent, OH | 30.5 GWh | 7 mi |
| Wadsworth HBS RTO BTM | Wadsworth, OH | 606.0 MWh | 16.1 mi |
| Wadsworth IPS RTO BTM | Wadsworth, OH | 534.0 MWh | 13.7 mi |