Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Misenheimer Solar LLC | Misenheimer Solar LLC | Gold Hill, NC | Duke Energy Carolinas (DUK) | 159.6 GWh | Mar 2024 | Jun 2026 | Solar |
| Red Bud Solar Plant | Duke Energy Carolinas, LLC | Castalia, NC | Duke Energy Carolinas (DUK) | 97.7 GWh | Sep 2025 | Jun 2026 | Solar |
| Virginia Line Solar, LLC | Virginia Line Solar, LLC | Manson, NC | Duke Energy Progress East (CPLE) | 81.7 GWh | Nov 2023 | Jun 2026 | Solar |
| Apex NC Solar | Apex NC Solar, LLC | Lawndale, NC | Duke Energy Carolinas (DUK) | 6.7 GWh | - | Jun 2026 | Solar |
| Timbermill Wind, LLC | Timbermill Wind | Edenton, NC | PJM Interconnection, LLC (PJM) | 371.0 GWh | Nov 2024 | Jun 2026 | Wind |
| Oak Solar | Oak Solar LLC | Gaston, NC | PJM Interconnection, LLC (PJM) | 256.4 GWh | Nov 2023 | Jun 2026 | Solar |
| Asheville | Duke Energy Progress - (NC) | Arden, NC | Duke Energy Progress East (CPLE) | 4.0 TWh | Apr 1964 | Jun 2026 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| Desert Wind Farm, LLC | Avangrid Power LLC | Hertford, NC | PJM Interconnection, LLC (PJM) | 558.0 GWh | Nov 2016 | Jun 2026 | Wind |
| Pecan Solar | Dominion Renewable Energy | Pleasant Hill, NC | PJM Interconnection, LLC (PJM) | 153.2 GWh | Nov 2018 | Jun 2026 | Solar |
| Innovative Solar 43, LLC | Cypress Creek Renewables | Ivanhoe, NC | Duke Energy Progress East (CPLE) | 65.0 GWh | Nov 2016 | Jun 2026 | Solar |
| Innovative Solar 67 | John Laing US Solar Corp. | Willard, NC | Duke Energy Progress East (CPLE) | 61.1 GWh | Nov 2018 | Jun 2026 | Solar |
| Innovative Solar 46 | Cypress Creek Renewables | Hope Mills, NC | Duke Energy Progress East (CPLE) | 127.2 GWh | Nov 2016 | Jun 2026 | Solar |
| Innovative Solar 54 | John Laing US Solar Corp. | Kinston, NC | Duke Energy Progress East (CPLE) | 98.8 GWh | Nov 2018 | Jun 2026 | Solar |
| Innovative Solar 47 | MN8 Energy LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 52.4 GWh | Mar 2017 | Jun 2026 | Solar |
| Innovative Solar 37 LLC | Dominion Renewable Energy | Morven, NC | Duke Energy Carolinas (DUK) | 142.4 GWh | Apr 2017 | Jun 2026 | Solar |
| Rutherford Farm | Southern Power Co | Forest City, NC | Duke Energy Carolinas (DUK) | 136.2 GWh | Nov 2016 | Jun 2026 | Solar |
| Shoe Creek Solar, LLC | Cypress Creek Renewables | Laurinburg, NC | Duke Energy Progress East (CPLE) | 117.7 GWh | Nov 2017 | Jun 2026 | Solar |
| Monroe Solar Facility | Duke Energy Carolinas, LLC | Monroe, NC | Duke Energy Progress East (CPLE) | 87.9 GWh | Feb 2017 | Jun 2026 | Solar |
| Innovative Solar 42 | Novis Renewables, LLC | Fayetteville, NC | Duke Energy Progress East (CPLE) | 78.0 GWh | Aug 2017 | Jun 2026 | Solar |
| Innovative Solar 31 | MN8 Energy LLC | Bladenboro, NC | Duke Energy Progress East (CPLE) | 53.2 GWh | Dec 2016 | Jun 2026 | Solar |
| Summit Farms Solar | Dominion Renewable Energy | Moyock, NC | PJM Interconnection, LLC (PJM) | 95.2 GWh | Nov 2016 | Jun 2026 | Solar |
| Brantley Solar | John Laing US Solar Corp. | Spring Hope, NC | Duke Energy Progress East (CPLE) | 99.8 GWh | Sep 2018 | Jun 2026 | Solar |
| Fox Creek Solar | John Laing US Solar Corp. | Louisburg, NC | Duke Energy Progress East (CPLE) | 84.9 GWh | Oct 2018 | Jun 2026 | Solar |
| Kings Mountain Energy Center | Carolina Power Partners, LLC | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 3.5 TWh | Jul 2018 | Jun 2026 | Natural Gas |
| Chestnut Solar | Dominion Renewable Energy | Enfield, NC | PJM Interconnection, LLC (PJM) | 152.9 GWh | Feb 2020 | Jun 2026 | Solar |
| Bullock Solar, LLC | Cypress Creek Renewables | Manson, NC | Duke Energy Progress East (CPLE) | 101.7 GWh | Nov 2017 | Jun 2026 | Solar |
| Bladen Solar | Cypress Creek Renewables | Fayetteville, NC | Duke Energy Progress East (CPLE) | 102.1 GWh | Nov 2017 | Jun 2026 | Solar |
| NC 102 Project LLC | NC 102 Project LLC | Midland, NC | Duke Energy Carolinas (DUK) | 143.1 GWh | Aug 2018 | Jun 2026 | Solar |
| Buckleberry Solar | John Laing US Solar Corp. | Grifton, NC | Duke Energy Progress East (CPLE) | 94.1 GWh | Oct 2018 | Jun 2026 | Solar |
| North 301 Solar | North 301 Solar, LLC | Enfield, NC | PJM Interconnection, LLC (PJM) | 38.8 GWh | Nov 2019 | Jun 2026 | Solar |
| Ranchland Solar, LLC | Ranchland Solar, LLC | Moyock, NC | PJM Interconnection, LLC (PJM) | 107.5 GWh | Nov 2017 | Jun 2026 | Solar |
| L V Sutton Combined Cycle | Duke Energy Progress - (NC) | Wilmington, NC | Duke Energy Progress East (CPLE) | 4.3 TWh | Oct 2013 | Jun 2026 | Natural Gas |
| Aulander Holloman Solar, LLC | Aulander Holloman Solar, LLC | Aulander, NC | PJM Interconnection, LLC (PJM) | 173.8 GWh | Nov 2018 | Jun 2026 | Solar |
| Wilkinson Solar LLC | Dominion Renewable Energy | Pantego, NC | PJM Interconnection, LLC (PJM) | 155.5 GWh | Nov 2019 | Jun 2026 | Solar |
| Maiden Creek Solar Power Plant | Duke Energy Carolinas, LLC | Maiden, NC | Duke Energy Carolinas (DUK) | 114.8 GWh | Dec 2020 | Jun 2026 | Solar |
| Gaston Solar Power Plant | Duke Energy Carolinas, LLC | Cherryville Township, NC | Duke Energy Carolinas (DUK) | 45.6 GWh | Nov 2020 | Jun 2026 | Solar |
| Crooked Run | Cubico USA, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 136.2 GWh | Nov 2019 | Jun 2026 | Solar |
| Fern Solar LLC | Fern Solar LLC | Battleboro, NC | PJM Interconnection, LLC (PJM) | 219.7 GWh | Nov 2020 | Jun 2026 | Solar |
| Broad River Solar, LLC | Deriva Energy | Mooresboro, NC | Duke Energy Carolinas (DUK) | 106.7 GWh | Nov 2021 | Jun 2026 | Solar |
| Hawtree Solar | Hawtree Creek Farm Solar, LLC | Warrenton, NC | PJM Interconnection, LLC (PJM) | 117.5 GWh | Sep 2021 | Jun 2026 | Solar |
| Gutenberg Solar | Dominion Energy Inc. | Garysburg, NC | PJM Interconnection, LLC (PJM) | 130.6 GWh | Aug 2019 | Jun 2026 | Solar |
| Lee Combined Cycle Plant | Duke Energy Progress - (NC) | Goldsboro, NC | Duke Energy Carolinas (DUK) | 5.7 TWh | Nov 2012 | Jun 2026 | Natural Gas |
| Concord Energy | Concord Energy LLC | Concord, NC | Duke Energy Carolinas (DUK) | 60.3 GWh | Jan 2012 | Jun 2026 | Landfill Gas |
| Long Creek Waste Water Plant | City of Gastonia - (NC) | Dallas, NC | Duke Energy Carolinas (DUK) | 320.0 MWh | Dec 1994 | Jun 2026 | Distillate Fuel Oil |
| Sugar Solar, LLC | SunStrong Management | Yadkinville, NC | Duke Energy Carolinas (DUK) | 100.3 GWh | Nov 2021 | Jun 2026 | Solar |
| Lick Creek Solar, LLC | SunStrong Management | Walnut Cove, NC | Duke Energy Carolinas (DUK) | 107.6 GWh | Feb 2022 | Jun 2026 | Solar |
| Highest Power Solar, LLC | SunStrong Management | Louisburg, NC | Duke Energy Progress East (CPLE) | 98.3 GWh | Jan 2022 | Jun 2026 | Solar |
| Partin Solar | Partin Solar, LLC | Elkin, NC | Duke Energy Carolinas (DUK) | 88.0 GWh | Sep 2023 | Jun 2026 | Solar |
| Trent River Solar, LLC | SunStrong Management | Pollocksville, NC | Duke Energy Progress East (CPLE) | 135.8 GWh | Jun 2021 | Jun 2026 | Solar |
| Bay Tree | Cypress Creek Renewables | Harrells, NC | Duke Energy Progress East (CPLE) | 151.2 GWh | Oct 2021 | Jun 2026 | Solar |
| Harts Mill Solar, LLC | Harts Mills Solar, LLC | Tarboro, NC | PJM Interconnection, LLC (PJM) | 179.5 GWh | Nov 2020 | Jun 2026 | Solar |
| Albemarle Beach Solar | Albemarle Beach Solar, LLC | Roper, NC | PJM Interconnection, LLC (PJM) | 226.5 GWh | Nov 2020 | Jun 2026 | Solar |
| Rockingham County CT Station | Duke Energy Carolinas, LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 1.8 TWh | May 2000 | Jun 2026 | Natural Gas : 99.5% Distillate Fuel Oil : 0.5% |
| American Beech Solar LLC | MN8 Energy LLC | Scotland Neck, NC | PJM Interconnection, LLC (PJM) | 173.8 GWh | Oct 2025 | Jun 2026 | Solar |
| Smithfield Farmland Corp Bladen | Smithfield Fresh Meats Corp. | Tar Heel, NC | Duke Energy Progress East (CPLE) | 42.0 MWh | Sep 1993 | Jun 2026 | Distillate Fuel Oil |
| Avalon Hydropower | Avalon Hydropower LLC | Mayodan, NC | Duke Energy Carolinas (DUK) | 2.3 GWh | Mar 1997 | Jun 2026 | Water |
| International Paper Riegelwood Mill | GCF - Riegelwood Mill | Riegelwood, NC | Duke Energy Progress East (CPLE) | 332.8 GWh | Nov 1951 | Jun 2026 | Black Liquor : 82.6% Natural Gas : 17.4% |
| Univ of NC Chapel Hill Cogen Facility | University of North Carolina | Chapel Hill, NC | Duke Energy Carolinas (DUK) | 51.2 GWh | Jun 1991 | Jun 2026 | Natural Gas : 58.8% Bituminous Coal : 41.2% |
| PCS Phosphate | PCS Phosphate | Aurora, NC | Duke Energy Progress East (CPLE) | 217.3 GWh | Nov 1984 | Jun 2026 | Waste Heat |
| KapStone Kraft Paper Corp | Westrock Kraft Paper, LLC | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 203.2 GWh | Dec 1965 | Jun 2026 | Black Liquor : 62.6% Bituminous Coal : 16.2% Natural Gas : 11.3% Wood/Wood Waste Solids : 9.7% |
| Mayo | Duke Energy Progress - (NC) | Roxboro, NC | Duke Energy Progress East (CPLE) | 1.4 TWh | Feb 1983 | Jun 2026 | Bituminous Coal : 98.4% Distillate Fuel Oil : 1.6% |
| Dan River | Duke Energy Carolinas, LLC | Eden, NC | Duke Energy Carolinas (DUK) | 4.1 TWh | Nov 2012 | Jun 2026 | Natural Gas |
| Cabin Creek Solar, LLC | Cabin Creek Solar, LLC | Biscoe, NC | Duke Energy Progress East (CPLE) | 161.1 GWh | Dec 2022 | Jun 2026 | Solar |
| International Paper Co. - New Bern Mill | GFC - New Bern Mill | New Bern, NC | Duke Energy Progress East (CPLE) | 195.6 GWh | Nov 1969 | Jun 2026 | Black Liquor : 82.7% Natural Gas : 17.3% |
| Butler-Warner Generation Plant | Fayetteville Public Works Commission | Fayetteville, NC | Duke Energy Progress East (CPLE) | 111.0 GWh | Jun 1976 | Jun 2026 | Natural Gas : 86.2% Distillate Fuel Oil : 12.5% Solar : 1.3% |
| Gaston | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 133.9 GWh | Jan 1963 | Jun 2026 | Water |
| High Shoals Hydro (NC) | Central Rivers Power US, LLC | High Shoals, NC | Duke Energy Carolinas (DUK) | 2.7 GWh | Jun 1934 | Jun 2026 | Water |
| Lincoln Combustion | Duke Energy Carolinas, LLC | Stanley, NC | Duke Energy Carolinas (DUK) | 896.1 GWh | Apr 1995 | Jun 2026 | Natural Gas : 95.0% Distillate Fuel Oil : 5.0% |
| Hiwassee Dam | Tennessee Valley Authority | Murphy, NC | Tennessee Valley Authority (TVA) | 194.4 GWh | Apr 1940 | Jun 2026 | Water |
| Brunswick Nuclear | Duke Energy Progress - (NC) | Southport, NC | Duke Energy Progress East (CPLE) | 15.3 TWh | Oct 1975 | Jun 2026 | Nuclear |
| Craven County Wood Energy LP | CMS Generation Operating Co II | New Bern, NC | Duke Energy Progress East (CPLE) | 273.4 GWh | Oct 1990 | Jun 2026 | Wood/Wood Waste Solids : 65.6% Other Biomass Solids : 34.4% |
| Harris (NC) | Duke Energy Progress - (NC) | New Hill, NC | Duke Energy Progress East (CPLE) | 7.8 TWh | Apr 1987 | Jun 2026 | Nuclear |
| Marshall (NC) | Duke Energy Carolinas, LLC | Terrell, NC | Duke Energy Carolinas (DUK) | 7.7 TWh | Feb 1965 | Jun 2026 | Bituminous Coal : 59.7% Natural Gas : 40.3% |
| Phobos Solar, LLC | Phobos Solar, LLC | Middlesex, NC | Duke Energy Progress East (CPLE) | 172.0 GWh | Dec 2022 | Jun 2026 | Solar |
| Sherwood H Smith Jr Energy Complex | Duke Energy Progress - (NC) | Hamlet, NC | Duke Energy Progress East (CPLE) | 9.7 TWh | Apr 2001 | Jun 2026 | Natural Gas |
| James E. Rogers Energy Complex | Duke Energy Carolinas, LLC | Cliffside, NC | Duke Energy Carolinas (DUK) | 5.1 TWh | May 1972 | Jun 2026 | Bituminous Coal : 55.5% Natural Gas : 44.4% |
| Buck | Duke Energy Carolinas, LLC | Salisbury, NC | Duke Energy Carolinas (DUK) | 4.5 TWh | Oct 2011 | Jun 2026 | Natural Gas |
| Rowan | Southern Power Co | Salisbury, NC | Duke Energy Carolinas (DUK) | 5.1 TWh | Mar 2001 | Jun 2026 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Roxboro | Duke Energy Progress - (NC) | Semora, NC | Duke Energy Progress East (CPLE) | 6.7 TWh | Apr 1966 | Jun 2026 | Bituminous Coal : 99.5% |
| Metropolitan Sewerage District | Metropolitan Sewerage District | Asheville, NC | Duke Energy Progress East (CPLE) | 5.5 GWh | Aug 1988 | Jun 2026 | Water |
| Turner Shoals | Northbrook Carolina Hydro LLC | Mill Springs, NC | Duke Energy Carolinas (DUK) | 69.0 MWh | Nov 1996 | Jun 2026 | Water |
| McGuire | Duke Energy Carolinas, LLC | Huntersville, NC | Duke Energy Carolinas (DUK) | 19.0 TWh | Aug 1981 | Jun 2026 | Nuclear |
| Belews Creek | Duke Energy Carolinas, LLC | Belews Creek, NC | Duke Energy Carolinas (DUK) | 8.9 TWh | Jul 1974 | Jun 2026 | Natural Gas : 67.6% Bituminous Coal : 32.4% |
| Stanly Solar, LLC | SunStrong Management | Albemarle, NC | Duke Energy Carolinas (DUK) | 89.9 GWh | Jul 2022 | Jun 2026 | Solar |
| Oak Trail Solar, LLC | Leeward Asset Management, LLC | Moyock, NC | PJM Interconnection, LLC (PJM) | 231.4 GWh | Jun 2023 | Jun 2026 | Solar |
| Catawba River Pollution Control | City of Morganton - (NC) | Morganton, NC | Duke Energy Carolinas (DUK) | 6.0 MWh | Jun 2009 | May 2026 | Distillate Fuel Oil |
| Murphy-Brown LLC | Murphy - Brown LLC | Warsaw, NC | Duke Energy Progress East (CPLE) | 6.0 MWh | Jun 1995 | Apr 2026 | Distillate Fuel Oil |
| Williamston Speight Solar, LLC | Williamston Speight Solar, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 25.2 GWh | Oct 2016 | Dec 2025 | Solar |
| River Road Solar, LLC | Deriva Energy | Cofield, NC | PJM Interconnection, LLC (PJM) | 8.6 GWh | Jul 2016 | Dec 2025 | Solar |
| Jersey Holdings | Heelstone Energy Holdings, LLC | Lumberton, NC | Duke Energy Carolinas (DUK) | 6.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Leggett Solar, LLC | Cypress Creek Renewables | Leggett, NC | PJM Interconnection, LLC (PJM) | 7.3 GWh | Nov 2016 | Dec 2025 | Solar |
| Barnhill Road Solar, LLC | Cypress Creek Renewables | Elizabeth City, NC | PJM Interconnection, LLC (PJM) | 2.5 GWh | Nov 2016 | Dec 2025 | Solar |
| McGoogan Farm, LLC | Strata Manager, LLC | Lumber Bridge, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Jul 2015 | Dec 2025 | Solar |
| Hew Fulton Farm, LLC | Strata Manager, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Roper Farm, LLC | Strata Manager, LLC | Grover, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | May 2015 | Dec 2025 | Solar |
| Tanager Holdings | RWE Clean Energy | Asheboro, NC | Duke Energy Progress East (CPLE) | 5.3 GWh | Nov 2019 | Dec 2025 | Solar |
| North Nash Farm, LLC | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Sunflower Solar | Sunflower Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 31.3 GWh | Nov 2017 | Dec 2025 | Solar |
| Cork Oak Solar | Cork Oak Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 38.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Bunn Level Farm, LLC | Strata Manager, LLC | Bunnlevel, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2016 | Dec 2025 | Solar |