Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| St. Pauls Solar 2 | CD Global Solar Holdings, LLC | St. Pauls, NC | Duke Energy Carolinas (DUK) | 7.8 GWh | Jun 2017 | Dec 2025 | Solar |
| Phelps 158 Solar Farm | CleanCapital Holdings | Conway, NC | PJM Interconnection, LLC (PJM) | 5.4 GWh | Jan 2018 | Dec 2025 | Solar |
| Tolson Solar | Oppidum Renewables USA, LLC | Tarboro, NC | PJM Interconnection, LLC (PJM) | 2.4 GWh | Nov 2015 | Dec 2025 | Solar |
| Wadesboro Solar | Oppidum Renewables USA, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Nov 2017 | Dec 2025 | Solar |
| Salisbury Solar | Oppidum Renewables USA, LLC | Salisbury, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Gamble Solar | Oppidum Renewables USA, LLC | Bostic, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Sampson Solar | Strata Manager, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Jun 2015 | Dec 2025 | Solar |
| Railroad Farm 2 | Strata Manager, LLC | St. Pauls, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Sep 2014 | Dec 2025 | Solar |
| Old Wire Farm | Strata Manager, LLC | Laurel Hill, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Nov 2016 | Dec 2025 | Solar |
| Mills Anson Farm | Strata Manager, LLC | Lilesville, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | May 2016 | Dec 2025 | Solar |
| Laurinburg Farm | Strata Manager, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Kinston Davis Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Feb 2015 | Dec 2025 | Solar |
| Fisher Solar Farm - NC | Strata Manager, LLC | Oakboro, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Sep 2015 | Dec 2025 | Solar |
| Delco Farm | Strata Manager, LLC | Riegelwood, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | May 2016 | Dec 2025 | Solar |
| Wadesboro Farm 1 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Feb 2015 | Dec 2025 | Solar |
| Tripple State Farm | Strata Manager, LLC | Statesville, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Sep 2016 | Dec 2025 | Solar |
| Stone Solar | Strata Manager, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Jul 2016 | Dec 2025 | Solar |
| Floyd Road Solar Farm | Altus Power America Management, LLC | Gaston, NC | PJM Interconnection, LLC (PJM) | 8.5 GWh | May 2017 | Dec 2025 | Solar |
| Siler 421 Farm, LLC | Heelstone Energy Holdings, LLC | Siler City, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Underwood PV2 | Strata Manager, LLC | Murfreesboro, NC | PJM Interconnection, LLC (PJM) | 29.1 GWh | Sep 2020 | Dec 2025 | Solar |
| Everett PV1 | Strata Manager, LLC | Parmele, NC | PJM Interconnection, LLC (PJM) | 18.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Northern Cardinal Solar | Terraform Arcadia | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 1.2 GWh | May 2018 | Dec 2025 | Solar |
| Atkinson Farm Solar | Strata Manager, LLC | Beulaville, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Nov 2015 | Dec 2025 | Solar |
| ZV Solar 1 | Cypress Creek Renewables | Red Springs, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | May 2016 | Dec 2025 | Solar |
| Cotten Farm, LLC | Heelstone Energy Holdings, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Oct 2016 | Dec 2025 | Solar |
| Violet Solar | Violet Solar, LLC | Mount Pleasant, NC | Duke Energy Carolinas (DUK) | 9.7 GWh | Nov 2018 | Dec 2025 | Solar |
| Washington Solar | SolRiver Capital LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 11.3 GWh | Feb 2024 | Dec 2025 | Solar |
| Red Oak Solar Farm, LLC | Heelstone Energy Holdings, LLC | Nashville, NC | Duke Energy Carolinas (DUK) | 8.7 GWh | Nov 2016 | Dec 2025 | Solar |
| Ruskin Solar | Cypress Creek Renewables | Dudley, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Oct 2017 | Dec 2025 | Solar |
| Scarlet Solar | Cypress Creek Renewables | La Grange, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Aug 2017 | Dec 2025 | Solar |
| Viper Solar | Cypress Creek Renewables | Rockfish, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | Oct 2017 | Dec 2025 | Solar |
| Carl Friedrich Gauss Solar | Heelstone Energy Holdings, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 4.0 GWh | Sep 2018 | Dec 2025 | Solar |
| Bernhardt Furniture Solar Farm | Bernhardt Furniture Company | Lenoir, NC | Duke Energy Carolinas (DUK) | 1.6 GWh | Nov 2015 | Dec 2025 | Solar |
| Thigpen Farms Solar, LLC | Thigpen Solar, LLC | Maxton, NC | Duke Energy Carolinas (DUK) | 10.4 GWh | Nov 2023 | Dec 2025 | Solar |
| Catawba Solar LLC | Catawba Solar LLC | Salisbury, NC | Duke Energy Carolinas (DUK) | 2.8 GWh | Aug 2016 | Dec 2025 | Solar |
| Williamston Speight Solar, LLC | Williamston Speight Solar, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 25.2 GWh | Oct 2016 | Dec 2025 | Solar |
| Jersey Holdings | Heelstone Energy Holdings, LLC | Lumberton, NC | Duke Energy Carolinas (DUK) | 6.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Leggett Solar, LLC | Cypress Creek Renewables | Leggett, NC | PJM Interconnection, LLC (PJM) | 7.3 GWh | Nov 2016 | Dec 2025 | Solar |
| Barnhill Road Solar, LLC | Cypress Creek Renewables | Elizabeth City, NC | PJM Interconnection, LLC (PJM) | 2.5 GWh | Nov 2016 | Dec 2025 | Solar |
| McGoogan Farm, LLC | Strata Manager, LLC | Lumber Bridge, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Jul 2015 | Dec 2025 | Solar |
| Hew Fulton Farm, LLC | Strata Manager, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Roper Farm, LLC | Strata Manager, LLC | Grover, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | May 2015 | Dec 2025 | Solar |
| Tanager Holdings | RWE Clean Energy | Asheboro, NC | Duke Energy Progress East (CPLE) | 5.3 GWh | Nov 2019 | Dec 2025 | Solar |
| North Nash Farm, LLC | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Sunflower Solar | Sunflower Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 31.3 GWh | Nov 2017 | Dec 2025 | Solar |
| Cork Oak Solar | Cork Oak Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 38.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Bunn Level Farm, LLC | Strata Manager, LLC | Bunnlevel, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2016 | Dec 2025 | Solar |
| Creech Solar 2, LLC | Cypress Creek Renewables | Garner, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Auten Road Farm, LLC | Cypress Creek Renewables | Gastonia, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Nov 2017 | Dec 2025 | Solar |
| Perkins Solar, LLC | Cypress Creek Renewables | Roxboro, NC | Duke Energy Carolinas (DUK) | 3.8 GWh | Sep 2016 | Dec 2025 | Solar |
| BRE NC Solar 3 | SunStrong Management | Oxford, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Bay Branch Solar | Sol Systems | Chocowinity, NC | Duke Energy Progress East (CPLE) | 10.2 GWh | Nov 2018 | Dec 2025 | Solar |
| Old Pageland Monroe Road Solar Farm | Cypress Creek Renewables | Monroe, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Oct 2015 | Dec 2025 | Solar |
| Duplin Solar I LLC (160 Houston Lane) | Duplin Solar I, LLC | Kenansville, NC | Duke Energy Carolinas (DUK) | 2.3 GWh | Jun 2014 | Dec 2025 | Solar |
| Wayne Solar II LLC | Wayne Solar II, LLC | Goldsboro, NC | Duke Energy Carolinas (DUK) | 1.9 GWh | Jun 2014 | Dec 2025 | Solar |
| Wayne Solar III LLC | Wayne Solar III, LLC | Goldsboro, NC | Duke Energy Carolinas (DUK) | 3.9 GWh | Jun 2014 | Dec 2025 | Solar |
| Soluga Farms III | Strata Manager, LLC | Godwin, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Oct 2015 | Dec 2025 | Solar |
| Meriwether Farm | Strata Manager, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Aug 2016 | Dec 2025 | Solar |
| Kojak Farm | Strata Manager, LLC | Bailey, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | May 2016 | Dec 2025 | Solar |
| Hector Farm | Strata Manager, LLC | Troy, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Feb 2017 | Dec 2025 | Solar |
| Yanceyville Farm 3, LLC | Strata Manager, LLC | Blanch, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Nov 2015 | Dec 2025 | Solar |
| Belafonte | Strata Manager, LLC | Calypso, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Nov 2018 | Dec 2025 | Solar |
| Boykin PV1 | Strata Manager, LLC | Wade, NC | Duke Energy Carolinas (DUK) | 32.7 GWh | Nov 2020 | Dec 2025 | Solar |
| High Shoals PV1 | SunStrong Management | High Shoals, NC | Duke Energy Carolinas (DUK) | 30.7 GWh | Mar 2022 | Dec 2025 | Solar |
| Ouchchy PV1 | Strata Manager, LLC | Mebane, NC | Duke Energy Carolinas (DUK) | 5.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Turkey Creek PV1 | Fresh Air Energy XXXV, LLC | Kirby, NC | Duke Energy Carolinas (DUK) | 17.6 GWh | Jan 2017 | Dec 2025 | Solar |
| Vaughn Creek PV1 | Strata Manager, LLC | Murfreesboro, NC | Duke Energy Carolinas (DUK) | 36.4 GWh | Nov 2017 | Dec 2025 | Solar |
| McLean Homestead | SolRiver Capital LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 10.3 GWh | Jul 2023 | Dec 2025 | Solar |
| TWE Chocowinity Solar, LLC | Cypress Creek Renewables | Chocowinity, NC | Duke Energy Carolinas (DUK) | 5.6 GWh | Nov 2015 | Dec 2025 | Solar |
| Innovative Solar 10 | Cypress Creek Renewables | Canton, NC | Duke Energy Carolinas (DUK) | 2.6 GWh | Sep 2015 | Dec 2025 | Solar |
| Innovative Solar 26, LLC | Cypress Creek Renewables | Hildebran, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Nov 2015 | Dec 2025 | Solar |
| Innovative Solar 63, LLC | Cypress Creek Renewables | Snow Hill, NC | Duke Energy Carolinas (DUK) | 8.6 GWh | Jan 2016 | Dec 2025 | Solar |
| Innovative Solar 16 | Cypress Creek Renewables | Hendersonville, NC | Duke Energy Carolinas (DUK) | 3.4 GWh | Sep 2015 | Dec 2025 | Solar |
| Neisler Street Solar | Neisler Street Solar I, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 2.7 GWh | Jul 2015 | Dec 2025 | Solar |
| Shelby Randolph Road Solar 1, LLC | SRE Utility Solar 1, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Aug 2015 | Dec 2025 | Solar |
| Lafayette Solar I, LLC | SRE Utility Solar 1, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 3.3 GWh | Aug 2015 | Dec 2025 | Solar |
| Rockingham Solar, LLC | SRE Utility Solar 1, LLC | Marston, NC | Duke Energy Carolinas (DUK) | 8.7 GWh | Oct 2015 | Dec 2025 | Solar |
| York Road Solar I, LLC | SRE Utility Solar 1, LLC | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 3.4 GWh | Aug 2015 | Dec 2025 | Solar |
| SID Solar I, LLC | SRE Utility Solar 1, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 8.2 GWh | Aug 2015 | Dec 2025 | Solar |
| HCE Johnston I, LLC | HCE Johnston I, LLC | Willow Springs, NC | Duke Energy Carolinas (DUK) | 2.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Red Toad 1425 A Powatan Road, LLC | SRE Utility Solar 1, LLC | Clayton, NC | Duke Energy Carolinas (DUK) | 3.8 GWh | Nov 2015 | Dec 2025 | Solar |
| Durham Solar | SRE Utility Solar 1, LLC | Durham, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2015 | Dec 2025 | Solar |
| Morgan Farm, LLC | SRE Utility Solar 1, LLC | Louisburg, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Nashville Farms, LLC | SRE Utility Solar 1, LLC | Nashville, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Cedar Solar, LLC | SRE Utility Solar 1, LLC | Beulaville, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Oct 2015 | Dec 2025 | Solar |
| Elm Solar, LLC | SRE Utility Solar 1, LLC | Sanford, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Nov 2015 | Dec 2025 | Solar |
| Baltimore Church Solar, LLC | Altus Power America Management, LLC | Fairmont, NC | Duke Energy Carolinas (DUK) | 7.2 GWh | Sep 2017 | Dec 2025 | Solar |
| Cohen Farm Solar, LLC | Cypress Creek Renewables | Sanford, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | Jul 2016 | Dec 2025 | Solar |
| Floyd Solar, LLC | Cypress Creek Renewables | Fairmont, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Jun 2016 | Dec 2025 | Solar |
| Shelter Solar | Sol Systems | Raeford, NC | Duke Energy Carolinas (DUK) | 7.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Heedeh Solar | MN8 Energy LLC | Delco, NC | Duke Energy Carolinas (DUK) | 6.3 GWh | Jun 2018 | Dec 2025 | Solar |
| Tate Solar | USF Essex Lessor, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jul 2020 | Dec 2025 | Solar |
| Eagle Solar | USF Essex Lessor, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Jul 2020 | Dec 2025 | Solar |
| Robin Solar | SunStrong Management | Dudley, NC | Duke Energy Carolinas (DUK) | 7.4 GWh | Dec 2020 | Dec 2025 | Solar |
| Cash Solar | SunStrong Management | Nashville, NC | Duke Energy Carolinas (DUK) | 10.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Daystar Solar | Altus Power America Management, LLC | Pollocksville, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Aug 2017 | Dec 2025 | Solar |
| Kathleen Solar | Sol Systems | Fuquay Varina, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Oct 2018 | Dec 2025 | Solar |
| Conetoe Solar | Conetoe Solar, LLC | Tarboro, NC | PJM Interconnection, LLC (PJM) | 5.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Sugar Run Solar | Sugar Run Solar, LLC | Sunbury, NC | PJM Interconnection, LLC (PJM) | 8.3 GWh | Nov 2015 | Dec 2025 | Solar |
| County Home Solar Center, LLC | Heelstone Energy Holdings, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | Aug 2016 | Dec 2025 | Solar |