Maiden Creek Solar Power Plant
TBD - Diddley Dadburn Road, Maiden, NC 28650Plant Summary Information
Maiden Creek Solar Power Plant is ranked #25 out of 762 solar farms in North Carolina in terms of total annual net electricity generation.
Maiden Creek Solar Power Plant generated 32.3 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Maiden Creek Solar Power Plant |
|---|---|
| Utility Name | Duke Energy Carolinas, LLC |
| Location | Catawba County, NC |
| Initial Operation Date | January 2021 |
| Last Update | May 2026 |
| Annual Generation | 119.4 GWh |
| Annual Consumption | 440.2 k MMBtu |
| Ranked #3,291 out of 13,081 Power Plants Nationwide | |
| Ranked #831 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #65 out of 876 North Carolina Power Plants | |
| Ranked #25 out of 762 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
Map of Maiden Creek Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maiden Creek Solar Power Plant.
Monthly Net Generation for Maiden Creek Solar Power Plant
Monthly Plant Fuel Consumption for Maiden Creek Solar Power Plant
Maiden Creek Solar Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Maiden Creek Solar Power Plant (62668) |
| Plant Address | TBD - Diddley Dadburn Road, Maiden, NC 28650 |
| Utility | Duke Energy Carolinas, LLC (5416) |
| Latitude, Longitude | 35.593, -81.167 |
| Generation Dates on File | Jan 2021 to May 2026 |
| Initial Operation Date | January 2021 |
| Annual Generation | 119.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Carolinas (DUK) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator PV1 Details Operating January 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 69.3 MW |
| Summer Capacity | 69.3 MW |
| Winter Capacity | 69.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 5 |
| Tilt Angle | 23 |
| DC Net Capacity | 102.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Maiden Creek Solar Power Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #821 | RE Camelot LLC | Mojave, CA | 121.0 GWh |
| #822 | Kayenta Solar Project | Kayenta, AZ | 120.4 GWh |
| #823 | Grange Hall Solar | Wimauma, FL | 120.3 GWh |
| #824 | Rocking R Solar, LLC | Hosston, LA | 120.2 GWh |
| #825 | Glover Creek Solar, LLC | Summer Shade, KY | 119.8 GWh |
| #826 | New Market Solar | Sardinia, OH | 119.6 GWh |
| #827 | Shoe Creek Solar, LLC | Laurinburg, NC | 119.6 GWh |
| #828 | Hawtree Solar | Warrenton, NC | 119.5 GWh |
| #829 | Antelope DSR 1 | Lancaster, CA | 119.4 GWh |
| #830 | Meridian III | Meridian, MS | 119.4 GWh |
| #832 | Payne Creek Solar | Bowling Green, FL | 119.2 GWh |
| #833 | OE_GA3 | Camilla, GA | 119.1 GWh |
| #834 | Northern Preserve Solar | Glen St. Mary, FL | 119.0 GWh |
| #835 | Skysol | Merrill, OR | 118.9 GWh |
| #836 | Hecate Energy Beacon Solar 3 | Cantil, CA | 118.9 GWh |
| #837 | BT Cooke Solar, LLC | Gainsville, TX | 117.7 GWh |
| #838 | Iris Solar LLC | Franklinton, LA | 117.1 GWh |
| #839 | Muskegon Solar | Muskegon, MI | 117.1 GWh |
| #840 | Sandstone Solar | Florence, AZ | 116.9 GWh |
| #841 | Sunlight Road Solar | Franklinton, LA | 116.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maiden Creek Solar Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Angel Solar | Newton, NC | 6.0 GWh | 4.6 mi |
| Apple Data Center - PV2 | Conover, NC | 34.5 GWh | 10.3 mi |
| Apple Data Center PV | Maiden, NC | 29.3 GWh | 4.8 mi |
| Apple Data Center PV3 | Conover, NC | 33.2 GWh | 8.5 mi |
| Apple One | Newton, NC | 9.3 GWh | 2.6 mi |
| Arndt Farm | Claremont, NC | 8.6 GWh | 12.9 mi |
| Flash Solar | Conover, NC | 8.2 GWh | 11.9 mi |
| Haynes Farm | Lincolnton, NC | 7.9 GWh | 6 mi |
| High Shoals Hydro (NC) | High Shoals, NC | 3.0 GWh | 13.9 mi |
| High Shoals PV1 | High Shoals, NC | 30.7 GWh | 13.9 mi |
| Lincoln Combustion | Stanley, NC | 981.9 GWh | 13.4 mi |
| Lincolnton High School | Lincolnton, NC | 148.0 MWh | 9.6 mi |
| Lookout Shoals | Statesville, NC | 82.5 GWh | 12.2 mi |
| Maiden Community Center | Maiden, NC | 154.0 MWh | 2.6 mi |
| Marshall (NC) | Terrell, NC | 7.5 TWh | 11.3 mi |
| Old Catawba PV 1 | Claremont, NC | 5.5 GWh | 8.4 mi |
| Owen Solar | Lincolnton, NC | 6.9 GWh | 8.3 mi |
| Sigmon Catawba Farm | Newton, NC | 2.5 GWh | 4.5 mi |
| Sonne Two | Newton, NC | 8.0 GWh | 4.5 mi |
| Two Lines Farm | Hickory, NC | 9.1 GWh | 9.3 mi |