Chestnut Solar
13889 NC Highway 481, Enfield, NC 27823Plant Summary Information
Chestnut Solar is ranked #13 out of 755 solar farms in North Carolina in terms of total annual net electricity generation.
Chestnut Solar generated 44.1 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Chestnut Solar |
---|---|
Utility Name | Dominion Renewable Energy |
Location | Halifax County, NC |
Initial Operation Date | March 2020 |
Last Update | May 2025 |
Annual Generation | 150.0 GWh |
Annual Consumption | 555.4 k MMBtu |
Ranked #2,782 out of 12,312 Power Plants Nationwide | |
Ranked #493 out of 6,191 Solar Power Plants Nationwide | |
Ranked #51 out of 868 North Carolina Power Plants | |
Ranked #13 out of 755 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Chestnut Solar LLC (2016 to 2021) Dominion Renewable Energy (2022 to 2024) |
Map of Chestnut Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chestnut Solar.
Monthly Net Generation for Chestnut Solar
Chestnut Solar Details
Summary Information | |
---|---|
Plant Name | Chestnut Solar (61011) |
Plant Address | 13889 NC Highway 481, Enfield, NC 27823 |
Utility | Dominion Renewable Energy (58468) |
Latitude, Longitude | 36.18, -77.712 |
Generation Dates on File | Mar 2020 to May 2025 |
Initial Operation Date | March 2020 |
Annual Generation | 150.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-664-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PV1 Details Operating March 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.9 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 74.9 MW |
Winter Capacity | 74.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 100 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Chestnut Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#483 | Solar Star California, XLI, LLC | Rosamond, CA | 150.8 GWh |
#484 | Mesquite Solar 4, LLC | Tonopah, AZ | 149.8 GWh |
#485 | Hobnail Solar | Hephzibah, GA | 150.4 GWh |
#486 | Allora Solar, LLC | Gilbert, SC | 150.4 GWh |
#487 | Roswell Solar, LLC | Roswell, NM | 150.4 GWh |
#488 | Pelican Solar Center | Ft. Pierce, FL | 150.3 GWh |
#489 | Blackwater Solar | Bickley, GA | 150.3 GWh |
#490 | Big Juniper Solar | TBD, FL | 150.3 GWh |
#491 | Okeechobee Solar | Vero Beach, FL | 150.2 GWh |
#492 | Matrix Pleasant Valley | Boise, ID | 150.1 GWh |
#494 | Estonian Solar Project, LLC | Cooper, TX | 146.4 GWh |
#495 | Echo River Solar | Live Oak, FL | 147.1 GWh |
#496 | Blue Heron Solar | Clewiston, FL | 149.0 GWh |
#497 | Bay Tree | Harrells, NC | 148.9 GWh |
#498 | SR DeSoto II | DeSoto, GA | 148.8 GWh |
#499 | River Bend Solar, LLC | Florence, AL | 148.5 GWh |
#500 | Eastover Solar | Eastover, SC | 148.5 GWh |
#501 | Eastern Shore Solar, LLC | Oak Hall, VA | 148.2 GWh |
#502 | Pink Trial Solar Energy Center | Port St. Lucie, FL | 148.2 GWh |
#503 | Wing | Wing, AL | 147.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chestnut Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
American Legion PV 1 | Roanoke Rapids, NC | 23.2 GWh | 16.8 mi |
Battleboro Farm | South Whitakers, NC | 8.0 GWh | 8.8 mi |
Boseman Solar Center LLC | Rocky Mount, NC | 8.4 GWh | 13.1 mi |
Carl Friedrich Gauss Solar | Halifax, NC | 5.7 GWh | 12.3 mi |
Cash Solar | Nashville, NC | 10.5 GWh | 15.8 mi |
Castalia Solar | Castalia, NC | 3.6 GWh | 7.2 mi |
Cork Oak Solar | Halifax, NC | 38.3 GWh | 15.4 mi |
Fern Solar LLC | Battleboro, NC | 194.6 GWh | 12.2 mi |
Grissom Solar, LLC | Enfield, NC | 10.6 GWh | 11.1 mi |
HXNAir Solar One | Halifax, NC | 7.7 GWh | 12.5 mi |
Innovative Solar 59, LLC | Nashville, NC | 1.5 GWh | 16 mi |
Innovative Solar 60, LLC | Castalia, NC | 3.1 GWh | 16.8 mi |
Leggett Solar, LLC | Leggett, NC | 8.3 GWh | 9.8 mi |
North 301 Solar | Enfield, NC | 29.7 GWh | 5.4 mi |
SoINCPower5, LLC | Battleboro, NC | 8.3 GWh | 9.2 mi |
Sun Farm VIII, LLC | Battleboro, NC | 7.7 GWh | 8.6 mi |
Sunflower Solar | Halifax, NC | 28.5 GWh | 16.3 mi |
Watson Seed Farm PV1 | Whitakers, NC | 31.0 GWh | 3.5 mi |
Whitakers | Whitakers, NC | 21.8 GWh | 3.9 mi |
Whitakers Farm (Fisher Rd) | Whitakers, NC | 6.1 GWh | 4.5 mi |