Gutenberg Solar
1701 Cornwallis Road, Garysburg, NC 27831Plant Summary Information
Gutenberg Solar is ranked #49 out of 873 power plants in North Carolina in terms of total annual net electricity generation.
Gutenberg Solar generated 48.6 GWh during the 3-month period between May 2025 to August 2025.
| Plant Name | Gutenberg Solar |
|---|---|
| Utility Name | Dominion Energy Inc. |
| Location | Northampton County, NC |
| Initial Operation Date | September 2019 |
| Last Update | Aug 2025 |
| Annual Generation | 154.6 GWh |
| Annual Consumption | 580.5 k MMBtu |
| Ranked #2,801 out of 12,529 Power Plants Nationwide | |
| Ranked #537 out of 6,390 Solar Power Plants Nationwide | |
| Ranked #49 out of 873 North Carolina Power Plants | |
| Ranked #11 out of 759 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Dominion Energy Inc (2019 to 2021) Dominion Energy Inc. (2022 to 2024) |
Map of Gutenberg Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gutenberg Solar.
Monthly Net Generation for Gutenberg Solar
Gutenberg Solar Details
| Summary Information | |
|---|---|
| Plant Name | Gutenberg Solar (63076) |
| Plant Address | 1701 Cornwallis Road, Garysburg, NC 27831 |
| Utility | Dominion Energy Inc. (5248) |
| Latitude, Longitude | 36.48643, -77.53483 |
| Generation Dates on File | Nov 2019 to Aug 2025 |
| Initial Operation Date | September 2019 |
| Annual Generation | 154.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) NC |
| Grid Voltage | 115.00 kV / 34.50 kV |
| Energy Storage | No |
Generator GUTN Details Operating September 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 79.9 MW |
| Summer Capacity | 79.9 MW |
| Winter Capacity | 79.9 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2019 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 119 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Gutenberg Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #527 | Silver Palm | TBD, FL | 155.9 GWh |
| #528 | Dileo Solar | Clifton, TX | 155.9 GWh |
| #529 | Bluegrass Solar | Church Hill, MD | 155.7 GWh |
| #530 | Mulligan Solar, LLC | Broadwell, IL | 155.6 GWh |
| #531 | Edwards Sanborn E5 | Mojave, CA | 155.0 GWh |
| #532 | Willow Solar Energy Center | Myakka City, FL | 154.9 GWh |
| #533 | Sabal Palm Solar Center | Loxahatchee, FL | 154.8 GWh |
| #534 | Blackwater Solar | Bickley, GA | 154.7 GWh |
| #535 | SR Ailey | Ailey, GA | 154.7 GWh |
| #536 | Eastern Shore Solar, LLC | Oak Hall, VA | 154.6 GWh |
| #538 | Santa Fe Solar Power Plant | Fort White, FL | 154.5 GWh |
| #539 | Immokalee | Immokalee, FL | 153.7 GWh |
| #540 | Stuttgart Solar | Stuttgart, AR | 153.6 GWh |
| #541 | Pecan Tree | Defuniak Springs, FL | 153.6 GWh |
| #542 | Regulus Solar Project | Bakersfield, CA | 153.6 GWh |
| #543 | Pecan Solar | Pleasant Hill, NC | 153.5 GWh |
| #544 | Columbia Solar Power Plant | Fort White, FL | 153.3 GWh |
| #545 | Caloosahatchee | Clewiston, FL | 152.7 GWh |
| #546 | Hardeetown Solar Power Plant | Chiefland, FL | 152.4 GWh |
| #547 | Big Juniper Solar | TBD, FL | 152.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gutenberg Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| American Legion PV 1 | Roanoke Rapids, NC | 23.2 GWh | 8.2 mi |
| Cork Oak Solar | Halifax, NC | 38.3 GWh | 8.2 mi |
| Cottonwood Solar, LLC | Garysburg, NC | 4.6 GWh | 4.7 mi |
| Floyd Road Solar Farm | Gaston, NC | 9.2 GWh | 8 mi |
| Fountain Creek Solar | Skippers, VA | 97.7 GWh | 10.4 mi |
| Garysburg Solar | Garysburg, NC | 7.0 GWh | 3.4 mi |
| Gaston Solar | Gaston, NC | 9.1 GWh | 7 mi |
| Greensville County Solar Project, LLC | Skippers, VA | 137.9 GWh | 10.8 mi |
| Halifax (NC) | Roanoke Rapids, NC | 24.2 GWh | 10.3 mi |
| Hemlock Solar | Garysburg, NC | 9.3 GWh | 3.7 mi |
| KapStone Kraft Paper Corp | Roanoke Rapids, NC | 179.8 GWh | 6 mi |
| Long Farm 46 Solar, LLC | Garysburg, NC | 8.2 GWh | 4.8 mi |
| Meherrin Solar | Skippers, VA | 118.7 GWh | 9.6 mi |
| Pecan Solar | Pleasant Hill, NC | 153.5 GWh | 3 mi |
| Pleasant Hill PV1 | Pleasant Hill, NC | 22.9 GWh | 3.2 mi |
| Roanoke Rapids | Roanoke Rapids, NC | 271.7 GWh | 7.6 mi |
| Rosemary Power Station | Roanoke Rapids, NC | 15.5 GWh | 7.3 mi |
| Schell Solar Farm | Garysburg, NC | 7.6 GWh | 3.9 mi |
| Seaboard Solar LLC | Seaboard, NC | 7.5 GWh | 3.8 mi |
| Sunflower Solar | Halifax, NC | 28.5 GWh | 7.1 mi |