Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| 1008 Matthews Solar | 1008 Matthews Solar, LLC | East Bend, NC | Duke Energy Carolinas (DUK) | 8.2 GWh | Apr 2021 | Dec 2025 | Solar |
| 1073 Onslow Solar | 1073 Onslow Solar, LLC | Hubert, NC | Duke Energy Carolinas (DUK) | 7.2 GWh | Apr 2021 | Dec 2025 | Solar |
| 1009 Yadkin Solar | 1009 Yadkin Solar, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 7.4 GWh | Mar 2021 | Dec 2025 | Solar |
| 1001 Ebenezer Church Solar | 1001 Ebenezer Church Solar, LLC | StateRoad, NC | Duke Energy Carolinas (DUK) | 6.2 GWh | Mar 2021 | Dec 2025 | Solar |
| ATOOD Solar IV, LLC | Cardinal Renewables | Leland, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Nov 2019 | Dec 2025 | Solar |
| Railroad Solar Farm, LLC | Cardinal Renewables | Pembroke, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Nov 2016 | Dec 2025 | Solar |
| ESA Hamlet NC , LLC | SunStrong Management | Hamlet, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | May 2020 | Dec 2025 | Solar |
| Cubera Solar, LLC | SunStrong Management | Dunn, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | Dec 2019 | Dec 2025 | Solar |
| Scotch Bonnet Solar, LLC | SunStrong Management | St Helena, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Aulander Hwy 42 Solar, LLC | Cardinal Renewables | Aulander, NC | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2016 | Dec 2025 | Solar |
| Harvest Beulaville, LLC | Cardinal Renewables | Beulaville, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | Mar 2017 | Dec 2025 | Solar |
| 232 Long Branch 29 Solar I, LLC | Cardinal Renewables | Shelby, NC | Duke Energy Carolinas (DUK) | 2.2 GWh | Jul 2018 | Dec 2025 | Solar |
| Cottonwood Solar, LLC | Cardinal Renewables | Garysburg, NC | PJM Interconnection, LLC (PJM) | 4.3 GWh | Dec 2017 | Dec 2025 | Solar |
| Woodsdale Farm, LLC | Cardinal Renewables | Roxboro, NC | Duke Energy Carolinas (DUK) | 3.3 GWh | Oct 2018 | Dec 2025 | Solar |
| Strider Solar, LLC | Cardinal Renewables | Asheboro, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Mar 2018 | Dec 2025 | Solar |
| Meeks Solar, LLC | Cardinal Renewables | Robersonville, NC | PJM Interconnection, LLC (PJM) | 3.4 GWh | Jun 2017 | Dec 2025 | Solar |
| Penny Hill Solar | Cardinal Renewables | Greenville, NC | PJM Interconnection, LLC (PJM) | 3.6 GWh | Aug 2017 | Dec 2025 | Solar |
| AGA TAG Solar IV LLC | AGA TAG Solar IV LLC | Leland, NC | Duke Energy Progress East (CPLE) | 6.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Hertford Solar Power, LLC | Capital V LLC | Ahoskie, NC | PJM Interconnection, LLC (PJM) | 20.7 GWh | May 2022 | Dec 2025 | Solar |
| Ray Wilson Solar | Ray Wilson Solar, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Mar 2021 | Dec 2025 | Solar |
| Carolina Lily Solar | Carolina Lily Solar, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 6.5 GWh | Apr 2021 | Dec 2025 | Solar |
| Plott Hound Solar | Plott Hound Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Apr 2021 | Dec 2025 | Solar |
| Spring Hope Solar 3, LLC | SunStrong Management | Spring Hope, NC | Duke Energy Progress East (CPLE) | 6.3 GWh | Nov 2020 | Dec 2025 | Solar |
| ESA Four Oaks 2 NC LLC | SunStrong Management | Four Oaks, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Carolina Poultry Power Farmville | Carolina Poultry Power | Farmville, NC | Southeastern Power Administration (SEPA) | 3.3 GWh | Aug 2019 | Dec 2025 | Agricultural By-Products |
| Speedway Solar NC, LLC | Deriva Energy | Midland, NC | Duke Energy Carolinas (DUK) | 39.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Stony Knoll Solar, LLC | Deriva Energy | Rockford, NC | Duke Energy Carolinas (DUK) | 44.0 GWh | Feb 2022 | Dec 2025 | Solar |
| Spencer Meadow Solar Energy Storage | North Carolina El Member Corp | Asheboro, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Dec 2021 | Dec 2025 | Solar |
| Thanksgiving Fire Solar Farm, LLC | Sol Systems | Zebulon, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Chowan Jehu Solar | SunStrong Management | Tyner, NC | PJM Interconnection, LLC (PJM) | 7.6 GWh | Jan 2018 | Dec 2025 | Solar |
| Shiloh Hwy Solar | SunStrong Management | Shiloh, NC | PJM Interconnection, LLC (PJM) | 8.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Old Cedar Solar Energy Storage | North Carolina El Member Corp | Asheboro, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Jul 2021 | Dec 2025 | Solar : 99.8% |
| Flatwood Farm | Strata Manager, LLC | Moncure, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Ennis Solar, LLC | CI-II Mitchell Holding LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 5.4 GWh | Oct 2019 | Dec 2025 | Solar |
| 1047 Little Mountain Solar, LLC | CI-II Mitchell Holding LLC | Jonesville, NC | Duke Energy Carolinas (DUK) | 3.7 GWh | Oct 2019 | Dec 2025 | Solar |
| 1025 Traveller Solar, LLC | CI-II Mitchell Holding LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Oct 2019 | Dec 2025 | Solar |
| Pecan Grove Solar, LLC | CI-II Mitchell Holding LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Oct 2019 | Dec 2025 | Solar |
| Wadesboro 4 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Jan 2019 | Dec 2025 | Solar |
| Arborgate Solar | Strata Manager, LLC | Pittsboro, NC | Duke Energy Progress West (CPLW) | 9.4 GWh | Jan 2019 | Dec 2025 | Solar |
| Hopewell Friends | Cypress Creek Renewables | Asheboro, NC | Duke Energy Progress East (CPLE) | 1.8 GWh | Nov 2018 | Dec 2025 | Solar |
| Innovative Solar 35 | CD Global Solar Holdings, LLC | Albertson, NC | Duke Energy Progress East (CPLE) | 2.8 GWh | Jan 2017 | Dec 2025 | Solar |
| Innovative Solar 59 | CD Global Solar Holdings, LLC | Nashville, NC | Duke Energy Progress East (CPLE) | 1.8 GWh | Jan 2017 | Dec 2025 | Solar |
| Innovative Solar 60 | CD Global Solar Holdings, LLC | Nashville, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | Jan 2017 | Dec 2025 | Solar |
| Wilson Solar Farm 1 | Headwater Energy, LLC | Wilson, NC | Duke Energy Progress East (CPLE) | 5.0 GWh | Mar 2017 | Dec 2025 | Solar |
| Wilson Solar Farm 2 | Headwater Energy, LLC | Lucama, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Jan 2017 | Dec 2025 | Solar |
| Wilson Solar Farm 3 | Headwater Energy, LLC | Wilson, NC | Duke Energy Progress East (CPLE) | 14.1 GWh | Mar 2017 | Dec 2025 | Solar |
| Wilson Solar Farm 4 | Headwater Energy, LLC | Wilson, NC | Duke Energy Progress East (CPLE) | 14.4 GWh | Mar 2017 | Dec 2025 | Solar |
| Wilson Solar Farm 5 | Headwater Energy, LLC | Wilson, NC | Duke Energy Progress East (CPLE) | 15.2 GWh | Apr 2017 | Dec 2025 | Solar |
| Wilson Solar Farm 6 | Headwater Energy, LLC | Wilson, NC | Duke Energy Progress East (CPLE) | 16.5 GWh | Apr 2017 | Dec 2025 | Solar |
| Arba Solar Energy Storage | North Carolina El Member Corp | Hamlet, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Feb 2023 | Dec 2025 | Solar |
| Bladenboro Solar, LLC | Cypress Creek Renewables | Bladenboro, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Nov 2015 | Dec 2025 | Solar |
| Lux Solar, LLC | Cypress Creek Renewables | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 4.0 GWh | Oct 2016 | Dec 2025 | Solar |
| Sun Farm V, LLC | Greenbacker Renewable Energy Corporation | Hertford, NC | PJM Interconnection, LLC (PJM) | 8.9 GWh | Oct 2018 | Dec 2025 | Solar |
| Roxboro Solar Farm, LLC | Cypress Creek Renewables | Oxford, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Nov 2015 | Dec 2025 | Solar |
| Jackson Solar Farm | Headwater Energy, LLC | Wilson, NC | Duke Energy Progress East (CPLE) | 13.1 GWh | Feb 2017 | Dec 2025 | Solar |
| Long Henry Solar | Cypress Creek Renewables | Seven Springs, NC | Duke Energy Progress East (CPLE) | 1.8 GWh | Aug 2017 | Dec 2025 | Solar |
| Bear Creek Solar (NC) | Cypress Creek Renewables | Bear Creek, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Oct 2017 | Dec 2025 | Solar |
| Bondi Solar | Cypress Creek Renewables | Kinston, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Nov 2017 | Dec 2025 | Solar |
| Deep Branch Farm | Strata Manager, LLC | Pembroke, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Dec 2016 | Dec 2025 | Solar |
| Pikeville Farm | Dominion Renewable Energy | Pikeville, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Oct 2017 | Dec 2025 | Solar |
| Moorings Farm 2, LLC | Dominion Renewable Energy | LaGrange, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Aug 2017 | Dec 2025 | Solar |
| Broadway Road Solar, LLC | SunStrong Management | Sanford, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Rosewood Solar | Cypress Creek Renewables | Goldsboro, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Sep 2016 | Dec 2025 | Solar |
| ABD Farms | Cypress Creek Renewables | Asheboro, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2017 | Dec 2025 | Solar |
| Bakatsias Solar | Cypress Creek Renewables | Haw River, NC | Duke Energy Carolinas (DUK) | 7.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Bayboro Solar Farm | Cypress Creek Renewables | Alliance, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | Nov 2017 | Dec 2025 | Solar |
| Mustang Solar | Dominion Renewable Energy | Robbins, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Jun 2018 | Dec 2025 | Solar |
| Old Caroleen Solar Farm | Cypress Creek Renewables | Forest City, NC | Duke Energy Carolinas (DUK) | 2.6 GWh | Jun 2018 | Dec 2025 | Solar |
| Statesville Solar | Cypress Creek Renewables | Cleveland, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Nov 2017 | Dec 2025 | Solar |
| Wakefield Solar | Cypress Creek Renewables | Nebulon, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Davis Lane Solar, LLC | Heelstone Energy Holdings, LLC | Edenton, NC | PJM Interconnection, LLC (PJM) | 9.1 GWh | Nov 2017 | Dec 2025 | Solar |
| Cougar Solar, LLC | Cougar Solar, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Nov 2017 | Dec 2025 | Solar |
| NCSU CCUP Cogeneration Plant | NC State University, Energy Systems | Raleigh, NC | Duke Energy Progress East (CPLE) | 28.7 GWh | Jan 2019 | Dec 2025 | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
| NCSU Cates Cogeneration Plant | NC State University, Energy Systems | Raleigh, NC | Duke Energy Progress East (CPLE) | 72.6 GWh | Jul 2012 | Dec 2025 | Natural Gas : 95.0% Distillate Fuel Oil : 5.0% |
| Windsor Hwy 17 Solar | Altus Power America Management, LLC | Windsor, NC | PJM Interconnection, LLC (PJM) | 10.9 GWh | Oct 2021 | Dec 2025 | Solar |
| Gaston County Renewable Energy Center | Gaston County Solid Waste and Recycling Division | Dallas, NC | Duke Energy Carolinas (DUK) | 23.1 GWh | May 2011 | Dec 2025 | Landfill Gas |
| Ryland Road Solar | Altus Power America Management, LLC | Tyner, NC | PJM Interconnection, LLC (PJM) | 10.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Edenton Solar | Edenton Solar | Edenton, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Van Buren | Van Buren Solar, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Feb 2021 | Dec 2025 | Solar |
| Sun Farm VI, LLC | Greenbacker Renewable Energy Corporation | Hertford, NC | PJM Interconnection, LLC (PJM) | 9.2 GWh | Oct 2018 | Dec 2025 | Solar |
| Hanover Solar, LLC | MN8 Energy LLC | Maysville, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Mar 2018 | Dec 2025 | Solar |
| Morning View | Cypress Creek Renewables | Seagrove, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Copperfield | Cypress Creek Renewables | Troy, NC | Duke Energy Progress East (CPLE) | 3.5 GWh | Nov 2018 | Dec 2025 | Solar |
| Arthur Solar, LLC | MN8 Energy LLC | Tabor City, NC | Duke Energy Carolinas (DUK) | 7.1 GWh | Jun 2018 | Dec 2025 | Solar |
| Badger | Strata Manager, LLC | Maysville, NC | Duke Energy Progress West (CPLW) | 10.0 GWh | Feb 2019 | Dec 2025 | Solar |
| Starr | Strata Manager, LLC | Clinton, NC | Duke Energy Progress West (CPLW) | 10.2 GWh | Feb 2019 | Dec 2025 | Solar |
| Changeup | Strata Manager, LLC | Asheboro, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Feb 2019 | Dec 2025 | Solar |
| Cookstown | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress West (CPLW) | 9.8 GWh | Jan 2019 | Dec 2025 | Solar |
| Sabattus Solar LLC | Sol Systems | Bailey, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Oct 2019 | Dec 2025 | Solar |
| Wendell Solar Farm LLC | Sol Systems | Wendell, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Aug 2019 | Dec 2025 | Solar |
| Ruff Solar LLC | Sol Systems | Ellenboro, NC | Duke Energy Carolinas (DUK) | 39.5 GWh | Jun 2020 | Dec 2025 | Solar |
| Camden Solar LLC | Camden Solar LLC | South Camden, NC | PJM Interconnection, LLC (PJM) | 45.1 GWh | Oct 2021 | Dec 2025 | Solar |
| HCE Moore I | SunStrong Management | Aberdeen, NC | Duke Energy Progress East (CPLE) | 886.0 MWh | Nov 2018 | Dec 2025 | Solar |
| Flowers Solar LLC | Altus Power America Management, LLC | Benson, NC | Duke Energy Progress East (CPLE) | 7.0 GWh | Jan 2019 | Dec 2025 | Solar |
| Camden Dam Solar, LLC | Altus Power America Management, LLC | Camden, NC | PJM Interconnection, LLC (PJM) | 8.6 GWh | Jul 2019 | Dec 2025 | Solar |
| Jamesville Road Solar, LLC | Altus Power America Management, LLC | Jamesville, NC | PJM Interconnection, LLC (PJM) | 9.9 GWh | Oct 2019 | Dec 2025 | Solar |
| Mill Pond Solar, LLC | Altus Power America Management, LLC | Jamesville, NC | PJM Interconnection, LLC (PJM) | 5.8 GWh | Jul 2019 | Dec 2025 | Solar |
| Hot Springs Energy Storage & Microgrid | Duke Energy Progress - (NC) | Hot Springs, NC | Duke Energy Progress West (CPLW) | 2.1 GWh | Jun 2022 | Dec 2025 | Solar |
| Woodleaf Solar Facility | Duke Energy Carolinas, LLC | Salisbury, NC | Duke Energy Progress East (CPLE) | 12.6 GWh | Nov 2018 | Dec 2025 | Solar |
| Burgaw Solar, LLC | CI-II Mitchell Holding LLC | Burgaw, NC | Duke Energy Progress East (CPLE) | 5.1 GWh | Oct 2019 | Dec 2025 | Solar |