Craven County Wood Energy LP
201 Executive Parkway, New Bern, NC 28562Plant Summary Information
Craven County Wood Energy LP is ranked #23 out of 156 wood/wood waste solids power plants nationwide in terms of total annual net electricity generation.
Craven County Wood Energy LP is comprised of 1 generator and generated 77.2 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Craven County Wood Energy LP |
|---|---|
| Utility Name | CMS Generation Operating Co II |
| Location | Craven County, NC |
| Initial Operation Date | November 1990 |
| Last Update | Sep 2025 |
| Annual Generation | 287.0 GWh |
| Annual Consumption | 4.8 M MMBtu |
| Ranked #2,007 out of 12,539 Power Plants Nationwide | |
| Ranked #23 out of 156 Wood/Wood Waste Solids Power Plants Nationwide | |
| Ranked #26 out of 873 North Carolina Power Plants | |
| Ranked #1 out of 4 North Carolina Wood/Wood Waste Solids Power Plants | |
| Fuel Types | Wood/Wood Waste Solids : 66.3% Other Biomass Solids : 33.7% |
Map of Craven County Wood Energy LP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Craven County Wood Energy LP.
Monthly Net Generation for Craven County Wood Energy LP
Craven County Wood Energy LP Details
| Summary Information | |
|---|---|
| Plant Name | Craven County Wood Energy LP (10525) |
| Plant Address | 201 Executive Parkway, New Bern, NC 28562 |
| Utility | CMS Generation Operating Co II (3837) |
| Latitude, Longitude | 35.13019, -77.16788 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | November 1990 |
| Annual Generation | 287.0 GWh |
| Fuel Types | Wood/Wood Waste Solids : 66.3% Other Biomass Solids : 33.7% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Wells and Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 1UNI Details Operating November 1990
| Technology | Wood/Wood Waste Biomass |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 47 MW |
| Winter Capacity | 47 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1990 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
|---|---|
| Energy Source | Wood/Wood Waste Solids / Other Biomass Solids / Waste/Other Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | WDS / OBS / WO |
|---|---|
Craven County Wood Energy LP Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| CMS Generation MI Power LLC | 2400 Miller Road, Dearborn, MI 48121 | 50.00% |
| Atlantic Power Corporation | 3 Allied Drive, Suite 220, Dedham, MA 2026 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wood/Wood Waste Solids.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #13 | ReEnergy Livermore Falls | Livermore Falls, ME | 266.8 GWh |
| #14 | Plainfield Renewable Energy LLC | Plainfield, CT | 247.0 GWh |
| #15 | Mead Coated Board | Mahrt, AL | 715.8 GWh |
| #16 | J C McNeil | Burlington, VT | 228.2 GWh |
| #17 | Somerset Plant | Skowhegan, ME | 573.0 GWh |
| #18 | Biomass One LP | White City, OR | 213.7 GWh |
| #19 | HL Power | Wendel, CA | 204.8 GWh |
| #20 | ReEnergy Stratton LLC | Stratton, ME | 203.1 GWh |
| #21 | Nacogdoches Power | Cushing, TX | 195.4 GWh |
| #22 | Sierra Pacific Quincy Facility | Quincy, CA | 192.5 GWh |
| #24 | Albany Green Energy | Albany, GA | 188.9 GWh |
| #25 | Burney Forest Products | Burney, CA | 193.3 GWh |
| #26 | Mt Poso Cogeneration | Bakersfield, CA | 179.7 GWh |
| #27 | Woodland Biomass Power Ltd | Woodland, CA | 170.9 GWh |
| #28 | Novo BioPower Plant | Snowflake, AZ | 168.1 GWh |
| #29 | Riverwood International Macon Mill | Macon, GA | 382.2 GWh |
| #30 | Desert View Power | Mecca, CA | 166.6 GWh |
| #31 | Gaylord Container Bogalusa | Bogalusa, LA | 439.1 GWh |
| #32 | Grayling Generating Station | Grayling, MI | 164.6 GWh |
| #33 | Manitowoc | Manitowoc, WI | 179.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Craven County Wood Energy LP.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Andrew Solar | New Bern, NC | 8.2 GWh | 3.9 mi |
| Badger | Maysville, NC | 10.6 GWh | 20.4 mi |
| Bayboro Solar Farm | Alliance, NC | 8.6 GWh | 20.2 mi |
| Coogee Solar | Grantsboro, NC | 11.4 GWh | 19.5 mi |
| Daystar Solar | Pollocksville, NC | 9.6 GWh | 6.8 mi |
| Grove Solar | New Bern, NC | 12.0 GWh | 3.9 mi |
| Hood Farm Solar, LLC | Trenton, NC | 9.4 GWh | 19.3 mi |
| International Paper Co. - New Bern Mill | New Bern, NC | 193.1 GWh | 6.4 mi |
| Lang Solar Farm | La Grange, NC | 9.1 GWh | 19.5 mi |
| New Bern | New Bern, NC | 20.2 GWh | 4.2 mi |
| New Bern Farm | Ernul, NC | 8.4 GWh | 8.3 mi |
| Pecan Grove Solar, LLC | New Bern, NC | 7.7 GWh | 4.4 mi |
| Plott Hound Solar | New Bern, NC | 6.9 GWh | 4.3 mi |
| Pollocksville Solar | Pollocksville, NC | 8.6 GWh | 9.6 mi |
| Porter Solar | New Bern, NC | 7.4 GWh | 8 mi |
| Sweet Tea Solar, LLC | New Bern, NC | 5.8 GWh | 2.9 mi |
| Trent River Farm | New Bern, NC | 7.8 GWh | 5 mi |
| Trent River Solar, LLC | Pollocksville, NC | 138.2 GWh | 10.7 mi |
| TWE New Bern Solar Project, LLC | New Bern, NC | 6.3 GWh | 2.5 mi |
| Wyse Fork Solar Farm, LLC | Dover, NC | 3.4 GWh | 19.8 mi |