Metropolitan Sewerage District
2028 Riverside Dr, Asheville, NC 28804Plant Summary Information
Metropolitan Sewerage District is ranked #27 out of 32 hydroelectric power plants in North Carolina in terms of total annual net electricity generation.
Metropolitan Sewerage District is comprised of 3 generators and generated 971.0 MWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Metropolitan Sewerage District |
|---|---|
| Utility Name | Metropolitan Sewerage District |
| Location | Buncombe County, NC |
| Initial Operation Date | September 1988 |
| Last Update | Mar 2026 |
| Annual Generation | 4.5 GWh |
| Annual Consumption | 15.2 k MMBtu |
| Ranked #8,227 out of 12,332 Power Plants Nationwide | |
| Ranked #1,109 out of 1,256 Water Power Plants Nationwide | |
| Ranked #663 out of 855 North Carolina Power Plants | |
| Ranked #27 out of 32 North Carolina Water Power Plants | |
| Fuel Types | Water |
Map of Metropolitan Sewerage District
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Metropolitan Sewerage District.
Monthly Net Generation for Metropolitan Sewerage District
Monthly Plant Fuel Consumption for Metropolitan Sewerage District
Metropolitan Sewerage District Details
| Summary Information | |
|---|---|
| Plant Name | Metropolitan Sewerage District (10181) |
| Plant Address | 2028 Riverside Dr, Asheville, NC 28804 |
| Utility | Metropolitan Sewerage District (12374) |
| Latitude, Longitude | 35.6497, -82.5992 |
| Generation Dates on File | Jan 2001 to Mar 2026 |
| Initial Operation Date | September 1988 |
| Annual Generation | 4.5 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Sewage Treatment Facilities (22132) |
| Sector | Commercial Non-CHP (4) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
| Grid Voltage | 2.30 kV |
| Energy Storage | No |
Generator GEN1 Details Standby September 1988
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | September 1988 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator GEN2 Details Operating September 1988
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 1988 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator GEN3 Details Operating September 1988
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 1988 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Metropolitan Sewerage District Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1099 | Upper Barker | Auburn, ME | 4.7 GWh |
| #1100 | Hydro Plant No 3 | east of Ephraim, UT | 4.6 GWh |
| #1101 | Radford | Radford, VA | 4.6 GWh |
| #1102 | Silver Lake (VT) | Salisbury, VT | 4.6 GWh |
| #1103 | North Gooding Main Hydro | Gooding, ID | 4.6 GWh |
| #1104 | Marys Lake | Estes Park, CO | 4.5 GWh |
| #1105 | Head of U Canal Hydro Project | Jerome, ID | 4.5 GWh |
| #1106 | Franklin (NC) | Franklin, NC | 4.5 GWh |
| #1107 | Piedmont Hydro Power Project | Piedmont, SC | 4.5 GWh |
| #1108 | Last Chance | Grace, ID | 4.5 GWh |
| #1110 | Chasm Hydro Partnership | Chateaugay, NY | 4.4 GWh |
| #1111 | Blind Canyon Hydro | Wendell, ID | 4.4 GWh |
| #1112 | Dunlap TP 1 | New Brannfels, TX | 4.4 GWh |
| #1113 | Cabot Holyoke | Holyoke, MA | 4.4 GWh |
| #1114 | Theresa Plant | Theresa, NY | 4.4 GWh |
| #1115 | Hiilangaay Hydro | Hydaburg, AK | 4.4 GWh |
| #1116 | Scott Flat | Nevada City, CA | 4.4 GWh |
| #1117 | La Grange | La Grange, CA | 4.4 GWh |
| #1118 | Merrill | Merrill, WI | 4.3 GWh |
| #1119 | Tacoma | Durango, CO | 4.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Metropolitan Sewerage District.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amethyst Solar | Forest City, NC | 5.4 GWh | 44.3 mi |
| Asheville | Arden, NC | 3.7 TWh | 12.6 mi |
| Bridgewater | Morganton, NC | 39.9 GWh | 43.2 mi |
| Cedar Cliff | Tuckasegee, NC | 11.7 GWh | 39.2 mi |
| Clear Solar I, LLC | Forest City, NC | 6.0 GWh | 48.7 mi |
| Gamble Solar | Bostic, NC | 5.8 GWh | 48.7 mi |
| Hot Springs Energy Storage & Microgrid | Hot Springs, NC | 2.5 GWh | 20.9 mi |
| Innovative Solar 10 | Canton, NC | 2.4 GWh | 20.4 mi |
| Innovative Solar 14, LLC | Hendersonville, NC | 3.2 GWh | 23.7 mi |
| Innovative Solar 16 | Hendersonville, NC | 3.1 GWh | 24.2 mi |
| Innovative Solar 6 | Leicester, NC | 4.6 GWh | 6.3 mi |
| Lincoln Solar, LLC (NC) | Bostic, NC | 9.0 GWh | 47.8 mi |
| SR Greenville I | Limestone, TN | 10.0 GWh | 44.9 mi |
| SR Greenville II | Greeneville, TN | 9.4 GWh | 38.2 mi |
| SR Jonesborough | Jonesborough, TN | 7.2 GWh | 41.8 mi |
| SR Washington I, LLC | Jonesborough, TN | 19.7 GWh | 48.2 mi |
| Tennessee Creek | Tuckasegee, NC | 36.8 GWh | 37.7 mi |
| Thorpe | Tuckasegee, NC | 56.7 GWh | 41.3 mi |
| Tuckasegee | Tuckasegee, NC | 4.2 GWh | 40.7 mi |
| Walters | Waterville, NC | 275.3 GWh | 25.5 mi |