Butler-Warner Generation Plant
2274 Custer Ave, Fayetteville, NC 28312Plant Summary Information
Butler-Warner Generation Plant is ranked #17 out of 27 natural gas power plants in North Carolina in terms of total annual net electricity generation.
Butler-Warner Generation Plant generated 43.3 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Butler-Warner Generation Plant |
|---|---|
| Utility Name | Fayetteville Public Works Commission |
| Location | Cumberland County, NC |
| Initial Operation Date | July 1976 |
| Last Update | Aug 2026 |
| Annual Generation | 88.7 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #3,696 out of 13,301 Power Plants Nationwide | |
| Ranked #998 out of 2,218 Natural Gas Power Plants Nationwide | |
| Ranked #88 out of 877 North Carolina Power Plants | |
| Ranked #17 out of 27 North Carolina Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 82.7% Distillate Fuel Oil : 15.6% Solar : 1.7% |
| Previous Operator |
Public Works Comm-City of Fayetteville (2013 to 2016) Fayetteville Public Works Commission (2017 to 2025) |
Map of Butler-Warner Generation Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Butler-Warner Generation Plant.
Monthly Net Generation for Butler-Warner Generation Plant
Monthly Plant Fuel Consumption for Butler-Warner Generation Plant
Butler-Warner Generation Plant Details
| Summary Information | |
|---|---|
| Plant Name | Butler-Warner Generation Plant (1016) |
| Plant Address | 2274 Custer Ave, Fayetteville, NC 28312 |
| Utility | Fayetteville Public Works Commission (6235) |
| Latitude, Longitude | 35.0986, -78.8294 |
| Generation Dates on File | Jan 2001 to Aug 2026 |
| Initial Operation Date | July 1976 |
| Annual Generation | 88.7 GWh |
| Fuel Types | Natural Gas : 82.7% Distillate Fuel Oil : 15.6% Solar : 1.7% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Works Comm-City of Fayetteville (6235) NC |
| Grid Voltage | 66.00 kV |
| Energy Storage | Yes |
| Natural Gas Information | |
| Local Distribution Company (LDC) | PIEDMONT NATURAL GAS |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator 1 Details Operating December 1976
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 28.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 1976 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 25 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 2 Details Operating December 1976
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 28.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 1976 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 25 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 3 Details Operating July 1976
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 28.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1976 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 25 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 4 Details Operating July 1976
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 28.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1976 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 25 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 5 Details Operating July 1977
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 28.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1977 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 25 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 6 Details Operating June 1978
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 28.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1978 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 25 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 7 Details Operating June 1979
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 28.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1979 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 25 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 8 Details Operating May 1980
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 28.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 20 MW |
| Winter Capacity | 25 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 1980 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 25 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 25 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 9 Details Operating December 1988
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 73 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 65 MW |
| Winter Capacity | 65 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 1988 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | No |
Generator 10 Details Operating June 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 1.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator 11 Details Operating September 2019
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 0.5 |
|---|---|
| Maximum Charge Rate | 0.3 MW |
| Maximum Discharge Rate | 0.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.6 |
| Storage Enclosure Type | CS |
| Transmission And Distribution Deferral | Yes |
| Load Management | P |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Butler-Warner Generation Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #988 | Boise Cascade International Falls | International Falls, MN | 335.1 GWh |
| #989 | Pfizer Groton Plant | Groton, CT | 82.3 GWh |
| #990 | Hargis-Hebert Electric Generating | Lafayette, LA | 75.7 GWh |
| #991 | Berry NMW Cogens | Bakersfield, CA | 75.7 GWh |
| #992 | Carson Power Plant | Sacramento, CA | 77.1 GWh |
| #993 | CP Kelco San Diego Plant | San Diego, CA | 74.8 GWh |
| #994 | Centrahoma East | Centrahoma, OK | 74.3 GWh |
| #995 | SJRR (LIG) | Houston, TX | 74.1 GWh |
| #996 | S A Carlson | Jamestown, NY | 73.5 GWh |
| #997 | Somerset Plant | Skowhegan, ME | 576.9 GWh |
| #999 | Archer Daniels Midland Peoria | Peoria, IL | 72.9 GWh |
| #1000 | WE Soda Alkalai LLC | Green River, WY | 268.9 GWh |
| #1001 | Generate Colchester Fuel Cells, LLC | Colchester, CT | 72.4 GWh |
| #1002 | MMSD Jones Island Wastewater | Milwaukee, WI | 82.3 GWh |
| #1003 | Iowa State University | Ames, IA | 73.4 GWh |
| #1004 | DeRidder Mill | DeRidder, LA | 404.5 GWh |
| #1005 | Exelon LaPorte Generating Station | LaPorte, TX | 70.7 GWh |
| #1006 | Clayville | Vineland, NJ | 70.2 GWh |
| #1007 | Anheuser-Busch Jacksonville | Jacksonville, FL | 69.2 GWh |
| #1008 | NCSU Cates Cogeneration Plant | Raleigh, NC | 72.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Butler-Warner Generation Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boykin PV1 | Wade, NC | 32.7 GWh | 4.6 mi |
| Bunn Level Farm, LLC | Bunnlevel, NC | 9.2 GWh | 14.8 mi |
| Carter PV1 | Fayetteville, NC | 8.8 GWh | 5.9 mi |
| DD Fayetteville Solar NC LLC | Fayetteville, NC | 39.4 GWh | 18.3 mi |
| Gillespie Street Solar | Fayetteville, NC | 2.6 GWh | 9.7 mi |
| Innovative Solar 42 | Fayetteville, NC | 81.4 GWh | 17.6 mi |
| Innovative Solar 46 | Hope Mills, NC | 126.1 GWh | 14 mi |
| Lillington Solar | Lillington, NC | 8.8 GWh | 18.7 mi |
| Panda Solar NC 10, LLC | Hope Mills, NC | 4.2 GWh | 13.9 mi |
| Panda Solar NC 11, LLC | Hope Mills, NC | 3.3 GWh | 13.9 mi |
| Panda Solar NC 5, LLC | Fayetteville, NC | 1.5 GWh | 3.7 mi |
| Panda Solar NC 9, LLC | Hope Mills, NC | 3.8 GWh | 13.8 mi |
| Quincy Solar (NC) | Fayetteville, NC | 7.2 GWh | 2.2 mi |
| Rockfish Solar | Fayetteville, NC | 1.3 GWh | 9.4 mi |
| Royal Solar | Godwin, NC | 9.0 GWh | 11.3 mi |
| Soluga Farms III | Godwin, NC | 9.4 GWh | 12.1 mi |
| Soluga Farms IV | Godwin, NC | 5.3 GWh | 12.3 mi |
| South River H4 Solar Energy Storage | Autryville, NC | 834.0 MWh | 14.2 mi |
| Tart Farm | Godwin, NC | 8.7 GWh | 11.1 mi |
| Viper Solar | Rockfish, NC | 3.6 GWh | 13.6 mi |