Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Siphon Drop Power Plant | Yuma County Water User's Association | Winterhaven, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 11.6 GWh | Aug 1987 | Dec 2024 | Water |
San Manuel Central Plant Cogens | Yuhaaviatam of San Manuel Nation | Highland, CA | California Independent System Operator (CISO) | 26.5 GWh | May 2021 | Dec 2023 | Natural Gas |
SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2011 | Apr 2025 | Distillate Fuel Oil |
Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 666.5 GWh | Nov 2023 | Apr 2025 | Solar : 95.8% |
Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 727.0 MWh | Jun 2020 | Apr 2025 | Natural Gas |
Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
Stampede | U S Bureau of Reclamation | Truckee, CA | Nevada Power Company (NEVP) | 13.4 GWh | Dec 1987 | Apr 2025 | Water |
Shasta | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 2.3 TWh | May 1944 | Apr 2025 | Water |
Spring Creek | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 318.6 GWh | Dec 1963 | Apr 2025 | Water |
Sand Bar Power Plant | Tri-Dam Power Authority | Stanislaus Ntl. Fores, CA | California Independent System Operator (CISO) | 85.5 GWh | Apr 1986 | Dec 2024 | Water |
Sacramento Regional County Sanitation PV | Tesla Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 7.3 GWh | Nov 2017 | Dec 2024 | Solar |
Sacramento Fairbain Water Treatment Plan | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 961.0 MWh | Jan 2013 | Dec 2024 | Solar |
Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.0 GWh | Jul 2014 | Dec 2024 | Solar |
San Gorgonio Westwinds II LLC | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 124.4 GWh | May 1999 | Dec 2024 | Wind |
SEGS IX | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 112.0 GWh | Aug 1990 | Sep 2024 | Solar |
Sycamore Energy LLC | Sycamore Energy LLC | Santee, CA | California Independent System Operator (CISO) | 23.1 GWh | Mar 2004 | Dec 2024 | Landfill Gas |
Sycamore Cogeneration | Sycamore Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 273.5 GWh | Nov 1987 | Apr 2025 | Natural Gas |
Sutter Santa Rosa Solar | Sutter Santa Rosa Solar LLC | Santa Rosa, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2019 | Dec 2024 | Solar |
Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 123.2 GWh | Jul 2014 | Apr 2025 | Landfill Gas |
Sunrise Power LLC | Sunrise Power Co LLC | Fellows, CA | California Independent System Operator (CISO) | 2.0 TWh | May 2001 | Apr 2025 | Natural Gas |
Sunray 3 | Sunray Energy 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 37.1 GWh | Nov 1985 | Dec 2024 | Solar |
Sunray 2 | Sunray Energy 2, LLC | Daggett, CA | California Independent System Operator (CISO) | 57.7 GWh | Nov 1984 | Dec 2024 | Solar |
Sunnyvale City of WPCP | Sunnyvale City of WPCP | Sunnyvale, CA | California Independent System Operator (CISO) | 9.5 GWh | Oct 1997 | Dec 2024 | Natural Gas : 48.8% Other Biomass Gas : 28.3% Landfill Gas : 22.9% |
Sunny Cow Solar, LLC | Sunny Cow Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 847.0 MWh | Sep 2023 | Dec 2023 | Solar |
SunE- E Philadelphia Ontario | SunEdison LLC | Ontario, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2016 | Dec 2024 | Solar |
SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.8 GWh | Oct 2014 | Nov 2024 | Solar |
SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 2014 | Dec 2024 | Solar |
SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2014 | Dec 2024 | Solar |
SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2014 | Dec 2024 | Solar |
SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 900.0 MWh | Aug 2007 | Dec 2024 | Solar |
Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 871.0 MWh | Feb 2009 | Dec 2024 | Solar |
SunEdison Procter & Gamble Oxnard | SunE U6 Holdings LLC | Oxnard, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2009 | Dec 2024 | Solar |
SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 991.0 MWh | Jul 2016 | Jul 2024 | Solar |
SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2008 | Dec 2024 | Solar |
SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 716.0 MWh | Feb 2009 | Dec 2024 | Solar |
SunEdison Ironwood State Prison | SunE CPA CDC2 LLC | Blythe, CA | California Independent System Operator (CISO) | 996.0 MWh | Apr 2008 | Dec 2024 | Solar |
Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 224.3 GWh | Nov 2023 | Apr 2025 | Wind |
Strata Roof 1 | Strata Manager, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Apr 2013 | Dec 2024 | Solar |
Still Water Power | Still Water Power LLC | Hanford, CA | California Independent System Operator (CISO) | 674.0 MWh | Apr 2020 | Dec 2024 | Other Biomass Gas |
Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.5 GWh | Apr 2018 | Dec 2024 | Solar |
SSI West Riverside Landfill LLC | Standard Solar | Riverside, CA | Los Angeles Department of Water and Power (LDWP) | 4.3 GWh | Oct 2020 | Dec 2024 | Solar |
Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
San Antonio West Solar Rooftop | SS San Antonio West LLC | Chino, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2012 | Dec 2024 | Solar |
Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 11.1 GWh | Nov 2016 | Dec 2023 | Natural Gas |
Spreckels Sugar Company | Spreckels Sugar Company | Brawley, CA | Imperial Irrigation District (IID) | 19.9 GWh | Mar 1948 | Dec 2024 | Natural Gas |
Solar Gen 2 Solar Facility | Southern Power Co | Calipatria, CA | California Independent System Operator (CISO) | 364.2 GWh | Oct 2014 | Dec 2024 | Solar |
Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 619.9 GWh | Nov 2015 | Dec 2024 | Solar |
Solar Photovoltaic Project #42 | Southern California Edison Co | Tulare, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2012 | Dec 2024 | Solar |
Sacramento Municipal Util Dist | South Sutter Water District | Sacramento, CA | California Independent System Operator (CISO) | 15.9 GWh | Jan 1985 | Mar 2024 | Water |
Sly Creek | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 30.9 GWh | Jun 1983 | Dec 2024 | Water |
Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.8 GWh | Nov 2020 | Dec 2024 | Solar |
Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 1.8 GWh | Jun 2018 | Dec 2023 | Solar |
Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 724.3 GWh | Feb 2014 | Apr 2025 | Solar |
Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 891.8 GWh | Feb 2014 | Apr 2025 | Solar |
Solar Star California II LLC | Solar Star California II LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.5 GWh | Jul 2012 | Dec 2024 | Solar |
Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 51.3 GWh | Dec 2015 | Dec 2024 | Solar |
Solano County Cogen Plant | Solano County | Fairfield, CA | California Independent System Operator (CISO) | 7.6 GWh | May 1989 | Dec 2023 | Natural Gas |
Sol Orchard El Centro PV | Sol Orchard Imperial 1, LLC | El Centro, CA | Imperial Irrigation District (IID) | 47.1 GWh | Sep 2013 | Dec 2024 | Solar |
South County Detention Center Solar | SoCore Energy LLC | Porterville, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2019 | Dec 2024 | Solar |
Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2016 | Dec 2024 | Solar |
Sky River Wind Energy Center | Sky River Wind LLC | Tehachapi, CA | California Independent System Operator (CISO) | 245.0 GWh | Jan 1991 | Dec 2024 | Wind |
Silveira Ranch Road Solar | Silveira Ranch Road Solar | Novato, CA | California Independent System Operator (CISO) | 4.1 GWh | Feb 2021 | Dec 2024 | Solar |
Silicon Valley Clean Water | Silicon Valley Clean Water | Redwood City, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2015 | Dec 2024 | Other Biomass Gas : 71.4% Natural Gas : 28.6% |
Signal Hill West Unit | Signal Hill Petroleum, Inc | Signal Hill, CA | California Independent System Operator (CISO) | 38.4 GWh | Jun 2004 | Apr 2025 | Other Gas |
Sierra Pacific Lincoln Facility | Sierra Pacific Industries | Lincoln, CA | California Independent System Operator (CISO) | 94.1 GWh | Feb 2004 | Dec 2024 | Wood/Wood Waste Solids |
Sierra Pacific Chinese Camp | Sierra Pacific Industries | Chinese Camp, CA | California Independent System Operator (CISO) | 4.6 GWh | Feb 2022 | Dec 2024 | Solar |
Sierra Pacific Industries (2042-RD) | Sierra Pacific Industries | Red Bluff, CA | California Independent System Operator (CISO) | 16.3 GWh | Apr 2020 | Dec 2024 | Solar |
Sierra Pacific Sonora | Sierra Pacific Industries | Standard, CA | California Independent System Operator (CISO) | 34.9 GWh | Jan 2001 | Dec 2024 | Wood/Wood Waste Solids |
SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 141.6 GWh | Jul 2015 | Dec 2023 | Wood/Wood Waste Solids : 99.8% |
Sierra Pacific Burney Facility | Sierra Pacific Industries | Burney, CA | California Independent System Operator (CISO) | 96.3 GWh | Sep 1986 | Dec 2024 | Wood/Wood Waste Solids |
Sierra Pacific Quincy Facility | Sierra Pacific Industries | Quincy, CA | California Independent System Operator (CISO) | 192.5 GWh | Nov 1986 | Dec 2024 | Wood/Wood Waste Solids |
Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 9.6 GWh | Apr 2005 | Dec 2024 | Natural Gas : 76.8% Solar : 21.6% Other Biomass Gas : 1.6% |
Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 46.3 GWh | Apr 2015 | Dec 2024 | Solar |
Southeast Resource Recovery | SERRF Joint Powers Authority | Long Beach, CA | California Independent System Operator (CISO) | 89.9 GWh | Jun 1988 | Mar 2024 | Non-biogenic Municipal Solid Waste : 51.7% Biogenic Municipal Solid Waste : 42.3% Natural Gas : 6.1% |
SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2020 | Dec 2024 | Solar |
SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2023 | Dec 2024 | Solar |
Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 311.2 GWh | Apr 2013 | Apr 2025 | Natural Gas |
Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2022 | Dec 2024 | Solar |
SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 549.7 GWh | Nov 2021 | Apr 2025 | Solar |
SCV Water - Gladbach Water Treatment Plant Phases I and II | SCV Water | Santa Clara, CA | California Independent System Operator (CISO) | 5.0 GWh | Nov 2014 | Dec 2024 | Solar |
SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 13.4 GWh | Sep 2017 | Dec 2024 | Solar |
Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 4.6 GWh | Oct 2009 | Dec 2024 | Landfill Gas |
SJ/SC WPCP | San Jose/Santa Clara Water P C | San Jose, CA | California Independent System Operator (CISO) | 83.7 GWh | Jan 1953 | Apr 2025 | Other Biomass Gas : 50.1% Natural Gas : 49.8% |
San Jose Cogeneration | San Jose State University Fclts Dev &Ops | San Jose, CA | California Independent System Operator (CISO) | 33.4 GWh | Nov 1984 | Apr 2025 | Natural Gas |
San Gorgonio Farms Wind Farm | San Gorgonio Farms Inc | Whitewater, CA | California Independent System Operator (CISO) | 61.3 GWh | Feb 1983 | Dec 2024 | Wind |
San Dimas Wash Generating Station | San Gabriel Valley Mun Wtr Dt | San Dimas, CA | California Independent System Operator (CISO) | 4.8 GWh | Feb 1986 | Jun 2024 | Water |
San Diego State University | San Diego State University | San Diego, CA | California Independent System Operator (CISO) | 49.5 GWh | Aug 2002 | Apr 2025 | Natural Gas : 97.9% Solar : 2.1% |
SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2021 | Dec 2023 | Other Biomass Gas : 96.8% Natural Gas : 3.2% |
San Antonio Regional Hospital | San Antonio Regional Hospital | Upland, CA | California Independent System Operator (CISO) | 10.2 GWh | Dec 1984 | Dec 2024 | Natural Gas |
Salka Cabazon Wind | Salka Cabazon Wind LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 7.9 GWh | Dec 1998 | Dec 2024 | Wind |
Salinas River Cogeneration | Salinas River Cogeneration Co | San Ardo, CA | California Independent System Operator (CISO) | 255.3 GWh | Oct 1991 | Apr 2025 | Natural Gas |
Saint Agnes Medical Center | Saint Agnes Medical Center | Fresno, CA | California Independent System Operator (CISO) | 26.9 GWh | Apr 2001 | Apr 2025 | Natural Gas |
SMUD at Lawrence | Sacramento PV Energy, LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.6 GWh | Nov 2011 | Dec 2024 | Solar |
SMUD at Fleshman | Sacramento PV Energy, LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 5.0 GWh | Nov 2011 | Dec 2024 | Solar |
SMUD at Van Conett | Sacramento PV Energy, LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 1.3 GWh | Nov 2011 | Dec 2023 | Solar |
SMUD at Grundman | Sacramento PV Energy, LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 29.4 GWh | Nov 2011 | Dec 2024 | Solar |
Solano Wind | Sacramento Municipal Util Dist | Rio Vista, CA | California Independent System Operator (CISO) | 725.4 GWh | May 1994 | Apr 2025 | Wind |
SCA Cogen 2 | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 617.6 GWh | Feb 1997 | Apr 2025 | Natural Gas |
SPA Cogen 3 | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 563.4 GWh | Nov 1997 | Apr 2025 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on December 2024 generation numbers.County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 5 | 12.3 GWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Yuba County, CA | # 27 | 5 | 1.7 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
Alameda County, CA | # 22 | 46 | 2.4 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
Kern County, CA | # 1 | 311 | 34.0 TWh |