Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Absegami | Altus Power America Management, LLC | Galloway, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Apr 2021 | Dec 2024 | Solar |
| 456 Lower | Altus Power America Management, LLC | Minisink, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Sep 2020 | Dec 2024 | Solar |
| 100 Lower | Altus Power America Management, LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Apr 2020 | Dec 2024 | Solar |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 5.7 GWh | Dec 2013 | Dec 2024 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2013 | Dec 2024 | Solar |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2024 | Solar |
| Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.6 GWh | Jan 2014 | Dec 2024 | Solar |
| Solar Park Gainesville, LLC | Altus Power America Management, LLC | Gainesville, FL | Gainesville Regional Utilities (GVL) | 1.5 GWh | Jun 2011 | Dec 2024 | Solar |
| Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2013 | Dec 2024 | Solar |
| Aerojet II | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 3.8 GWh | May 2010 | Dec 2024 | Solar |
| Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 2013 | Dec 2024 | Solar |
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2013 | Dec 2024 | Solar |
| Aerojet I | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 5.1 GWh | Nov 2009 | Dec 2024 | Solar |
| Nickel 1 Solar Facility | Altus Power America Management, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2012 | Dec 2024 | Solar |
| Keystone Solar | Altus Power America Management, LLC | Quarryville, PA | PJM Interconnection, LLC (PJM) | 7.4 GWh | Aug 2012 | Dec 2025 | Solar |
| Green Meadows | Altus Power America Management, LLC | Sandwich, MA | ISO New England (ISNE) | 5.1 GWh | Apr 2014 | Dec 2024 | Solar |
| Kalaeloa Solar Two | Altus Power America Management, LLC | Honolulu, HI | 7.7 GWh | Nov 2012 | Dec 2024 | Solar | |
| FastSun 14 CSG | Altus Power America Management, LLC | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Podunk Road CSG | Altus Power America Management, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jan 2019 | Dec 2024 | Solar |
| FastSun 21 CSG | Altus Power America Management, LLC | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2021 | Dec 2024 | Solar |
| FastSun 19 CSG | Altus Power America Management, LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2020 | Dec 2024 | Solar |
| FastSun 18 CSG | Altus Power America Management, LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2019 | Dec 2024 | Solar |
| Augusta Solar Farm | Altus Power America Management, LLC | Newton, NJ | PJM Interconnection, LLC (PJM) | 3.8 GWh | Apr 2016 | Dec 2024 | Solar |
| FastSun 13 CSG | Altus Power America Management, LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Day Four Solar LLC | Altus Power America Management, LLC | Wrightstown, NJ | PJM Interconnection, LLC (PJM) | 7.6 GWh | Sep 2016 | Dec 2024 | Solar |
| Milhurst Solar | Altus Power America Management, LLC | Manalapan, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Nov 2015 | Dec 2024 | Solar |
| NorthPark Solar | Altus Power America Management, LLC | Millstone, NJ | PJM Interconnection, LLC (PJM) | 12.9 GWh | Jan 2016 | Dec 2024 | Solar |
| FastSun 4 CSG | Altus Power America Management, LLC | Hugo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2021 | Dec 2024 | Solar |
| Chambers Road Solar | Altus Power America Management, LLC | Big Flats, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2020 | Dec 2024 | Solar |
| FastSun 11 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2020 | Dec 2024 | Solar |
| FastSun 10 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| FastSun 8 CSG | Altus Power America Management, LLC | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 9 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| FastSun 1 CSG | Altus Power America Management, LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 3 CSG | Altus Power America Management, LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 7 CSG | Altus Power America Management, LLC | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 5 CSG | Altus Power America Management, LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2019 | Dec 2024 | Solar |
| Hickory Grove #2 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2020 | Dec 2024 | Solar |
| AC Power | Altus Power America Management, LLC | Delanco Township, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Jun 2019 | Dec 2024 | Solar |
| Hickory Grove #1 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Dynamic - Enfield Hammett Road CSG | Altus Power America Management, LLC | Enfield, ME | ISO New England (ISNE) | 984.0 MWh | Aug 2024 | Dec 2024 | Solar |
| Dynamic - Exeter Solar CSG | Altus Power America Management, LLC | Exeter, ME | ISO New England (ISNE) | 524.0 MWh | Aug 2024 | Dec 2024 | Solar |
| Caribou | Altus Power America Management, LLC | Caribou, ME | ISO New England (ISNE) | 6.3 GWh | Jul 2023 | Dec 2024 | Solar |
| Loring | Altus Power America Management, LLC | Limestone, ME | ISO New England (ISNE) | 6.1 GWh | Apr 2023 | Dec 2024 | Solar |
| Ramapo | Altus Power America Management, LLC | Mahwah, NJ | PJM Interconnection, LLC (PJM) | 4.0 GWh | Jun 2019 | Dec 2024 | Solar |
| Stanford | Altus Power America Management, LLC | Stanfordville, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Jul 2021 | Dec 2024 | Solar |
| Ghent (NY) | Altus Power America Management, LLC | Ghent, NY | New York Independent System Operator (NYIS) | 5.7 GWh | May 2021 | Dec 2024 | Solar |
| Union Vale | Altus Power America Management, LLC | Lagrangeville, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Jul 2021 | Dec 2024 | Solar |
| Gloucester | Altus Power America Management, LLC | Gloucester City, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Rantoul Solar | Altorfer Inc. | Rantoul, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Altavista Solar | Altavista Solar, LLC | Lynch Station, VA | PJM Interconnection, LLC (PJM) | 159.4 GWh | May 2021 | Dec 2025 | Solar |
| Altamonte Mall | Altamonte Mall | Altamonte Springs, FL | Duke Energy Florida, Inc. (FPC) | 1.3 GWh | Apr 2016 | Dec 2024 | Solar |
| AltaGas Ripon Energy Inc. | AltaGas Ripon Energy Inc. | Ripon, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 1988 | Sep 2025 | Natural Gas |
| Blythe Energy Inc | AltaGas Blythe Operations Inc | Blythe, CA | California Independent System Operator (CISO) | 315.2 GWh | Nov 2003 | Dec 2025 | Natural Gas |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 269.5 GWh | Dec 2013 | Dec 2024 | Wind |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 379.0 GWh | Dec 2013 | Dec 2024 | Wind |
| Alta Wind Energy Center V | Alta Wind V, LLC | Mojave, CA | California Independent System Operator (CISO) | 288.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center IV | Alta Wind IV, LLC | Mojave, CA | California Independent System Operator (CISO) | 193.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center III | Alta Wind III, LLC | Mojave, CA | California Independent System Operator (CISO) | 363.2 GWh | Jan 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center II | Alta Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 364.6 GWh | Dec 2010 | Dec 2024 | Wind |
| Alta Wind Energy Center I | Alta Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 434.7 GWh | Dec 2010 | Dec 2024 | Wind |
| Alta Farms II Wind Project, LLC | Alta Farms II Wind Project, LLC | Clinton, IL | PJM Interconnection, LLC (PJM) | 545.8 GWh | Apr 2023 | Dec 2025 | Wind |
| Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 901.6 MWh | Sep 2016 | Dec 2024 | Other Biomass Gas |
| Alpine Solar | Alpine BESS LLC | Lancaster, CA | California Independent System Operator (CISO) | 118.8 GWh | Jan 2013 | Dec 2024 | Solar |
| Brookville Smart Bus Depot Microgrid | AlphaStruxure Service Co LP | Silver Spring, MD | PJM Interconnection, LLC (PJM) | 2.1 GWh | Sep 2022 | Dec 2024 | Solar : 98.6% Natural Gas : 1.4% |
| Alpha Value Solar | Alpha Value Solar, LLC | Hertford, NC | PJM Interconnection, LLC (PJM) | 8.9 GWh | Nov 2019 | Dec 2024 | Solar |
| Alpaca | Alpaca Energy LLC | Canton Township, PA | PJM Interconnection, LLC (PJM) | 32.1 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| Allora Solar, LLC | Allora Solar, LLC | Gilbert, SC | South Carolina Public Service Authority (SC) | 154.0 GWh | Dec 2022 | Dec 2025 | Solar |
| Allie L.L.C. (CSG) | Allie L.L.C. | Renville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2022 | Dec 2024 | Solar |
| Hillburn | Alliance NYGT, LLC | Hillburn, NY | New York Independent System Operator (NYIS) | 527.0 MWh | Jun 1972 | Dec 2024 | Natural Gas |
| Shoemaker | Alliance NYGT, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 336.0 MWh | Jun 1972 | Nov 2024 | Natural Gas |
| 500 Virginia Solar | Alliance HP Virginia Drive LLC | Ft. Washington, PA | PJM Interconnection, LLC (PJM) | 1.1 GWh | Jun 2011 | Dec 2024 | Solar |
| Bison 2 Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 218.7 GWh | Nov 2012 | Dec 2024 | Wind |
| Bison 3 Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 223.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Jean Duluth Solar | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2022 | Dec 2024 | Solar |
| Laskin Solar | ALLETE, Inc. | Hoyt Lakes, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Nov 2022 | Dec 2024 | Solar |
| Sylvan Solar | ALLETE, Inc. | Pillager, MN | Midcontinent Independent System Operator, Inc. (MISO) | 25.0 GWh | Jun 2023 | Dec 2024 | Solar |
| Taconite Ridge 1 Wind Energy Center | ALLETE, Inc. | Mountain Iron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 47.4 GWh | Apr 2008 | Dec 2024 | Wind |
| Bison I Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 165.9 GWh | Nov 2010 | Dec 2024 | Wind |
| Bison 4 Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 624.2 GWh | Dec 2014 | Dec 2024 | Wind |
| Rapids Energy Center | ALLETE, Inc. | Grand Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 40.2 GWh | Dec 1942 | Dec 2024 | Natural Gas : 77.3% Water : 22.7% |
| Syl Laskin | ALLETE, Inc. | Hoyt Lakes, MN | Midcontinent Independent System Operator, Inc. (MISO) | 172.0 GWh | May 1953 | Dec 2024 | Natural Gas |
| Prairie River | ALLETE, Inc. | Grand Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Mar 1920 | Dec 2024 | Water |
| Winton | ALLETE, Inc. | Winton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.3 GWh | Jul 1923 | Dec 2024 | Water |
| Sylvan | ALLETE, Inc. | Pillager, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.5 GWh | Dec 1912 | Dec 2024 | Water |
| Blanchard | ALLETE, Inc. | Royalton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 81.8 GWh | Jan 1925 | Dec 2024 | Water |
| Clay Boswell | ALLETE, Inc. | Cohasset, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 TWh | Jun 1958 | Dec 2025 | Subbituminous Coal : 99.8% |
| Fond Du Lac | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 54.3 GWh | Dec 1923 | Dec 2024 | Water |
| Knife Falls | ALLETE, Inc. | Cloquet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 GWh | Dec 1921 | Dec 2024 | Water |
| Little Falls (MN) | ALLETE, Inc. | Little Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 31.6 GWh | Dec 1905 | Dec 2024 | Water |
| M L Hibbard | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 98.3 GWh | May 1949 | Dec 2025 | Wood/Wood Waste Solids : 91.0% Subbituminous Coal : 6.9% Natural Gas : 2.1% |
| Pillager | ALLETE, Inc. | Pillager, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Dec 1916 | Dec 2024 | Water |
| Scanlon | ALLETE, Inc. | Scanlon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Dec 1922 | Dec 2024 | Water |
| Thomson | ALLETE, Inc. | Carlton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 290.5 GWh | Dec 1906 | Dec 2024 | Water |
| Armenia Mountain Wind Farm | ALLETE Clean Energy | Mainesburg, PA | PJM Interconnection, LLC (PJM) | 235.4 GWh | Nov 2009 | Dec 2024 | Wind |
| Caddo Wind | ALLETE Clean Energy | Apache, OK | Southwest Power Pool (SWPP) | 983.7 GWh | Dec 2021 | Dec 2025 | Wind |
| Diamond Spring, LLC | ALLETE Clean Energy | Sulphur, OK | Southwest Power Pool (SWPP) | 733.1 GWh | Nov 2020 | Dec 2025 | Wind |
| Lincoln Heights II | ALLETE Clean Energy | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 GWh | Apr 2006 | Dec 2024 | Wind |
| Lincoln Heights I | ALLETE Clean Energy | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 GWh | Apr 2006 | Dec 2024 | Wind |
| Cisco | ALLETE Clean Energy | Brewster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Jan 2008 | Dec 2024 | Wind |
Summary of Power Plants By State
Figures are based on December 2025 generation numbers.| State | Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,766.12 GWh |
| Alaska | # 48 | 139 | 625.46 GWh |
| Arizona | # 16 | 183 | 8,962.31 GWh |
| Arkansas | # 29 | 114 | 5,525.50 GWh |
| California | # 5 | 1,683 | 14,393.99 GWh |
| Colorado | # 31 | 297 | 4,649.38 GWh |
| Connecticut | # 34 | 162 | 4,087.83 GWh |
| Delaware | # 49 | 33 | 469.96 GWh |
| District of Columbia | # 51 | 16 | 14.80 GWh |
| Florida | # 3 | 333 | 19,379.32 GWh |
| Georgia | # 8 | 248 | 12,492.24 GWh |
| Hawaii | # 46 | 70 | 814.97 GWh |
| Idaho | # 41 | 146 | 2,123.12 GWh |
| Illinois | # 4 | 379 | 17,546.79 GWh |
| Indiana | # 13 | 214 | 9,789.95 GWh |
| Iowa | # 20 | 293 | 7,310.28 GWh |
| Kansas | # 28 | 183 | 5,586.75 GWh |
| Kentucky | # 22 | 60 | 6,716.43 GWh |
| Louisiana | # 17 | 84 | 8,587.03 GWh |
| Maine | # 45 | 215 | 1,484.81 GWh |
| Maryland | # 37 | 203 | 3,225.85 GWh |
| Massachusetts | # 43 | 640 | 2,073.13 GWh |
| Michigan | # 11 | 269 | 11,734.82 GWh |
| Minnesota | # 27 | 764 | 5,712.30 GWh |
| Mississippi | # 24 | 56 | 6,090.79 GWh |
| Missouri | # 23 | 125 | 6,623.76 GWh |
| State | Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,639.28 GWh |
| Nebraska | # 36 | 125 | 3,667.32 GWh |
| Nevada | # 38 | 114 | 3,217.22 GWh |
| New Hampshire | # 44 | 56 | 1,878.83 GWh |
| New Jersey | # 30 | 387 | 5,182.27 GWh |
| New Mexico | # 35 | 142 | 3,818.41 GWh |
| New York | # 10 | 950 | 11,800.05 GWh |
| North Carolina | # 9 | 904 | 12,153.04 GWh |
| North Dakota | # 33 | 58 | 4,218.72 GWh |
| Ohio | # 6 | 198 | 13,425.53 GWh |
| Oklahoma | # 18 | 141 | 7,637.23 GWh |
| Oregon | # 21 | 272 | 6,788.64 GWh |
| Pennsylvania | # 2 | 252 | 22,539.49 GWh |
| Rhode Island | # 47 | 100 | 775.70 GWh |
| South Carolina | # 15 | 207 | 8,967.44 GWh |
| South Dakota | # 42 | 52 | 2,122.20 GWh |
| Tennessee | # 19 | 88 | 7,328.17 GWh |
| Texas | # 1 | 947 | 46,150.81 GWh |
| Utah | # 39 | 125 | 2,845.12 GWh |
| Vermont | # 50 | 116 | 189.85 GWh |
| Virginia | # 14 | 237 | 9,421.16 GWh |
| Washington | # 12 | 135 | 10,635.09 GWh |
| West Virginia | # 26 | 39 | 5,763.55 GWh |
| Wisconsin | # 25 | 243 | 5,804.32 GWh |
| Wyoming | # 32 | 70 | 4,436.68 GWh |