Farmers City Wind LLC
13987 U.S. Highway 59, Tarkio, MO 64491Plant Summary Information
Farmers City Wind LLC is ranked #28 out of 122 power plants in Missouri in terms of total annual net electricity generation.
Farmers City Wind LLC generated 69.3 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Farmers City Wind LLC |
|---|---|
| Utility Name | Avangrid Power LLC |
| Location | Atchison County, MO |
| Initial Operation Date | April 2009 |
| Last Update | Dec 2024 |
| Annual Generation | 246.4 GWh |
| Annual Consumption | 919.1 k MMBtu |
| Ranked #2,219 out of 12,539 Power Plants Nationwide | |
| Ranked #675 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #28 out of 122 Missouri Power Plants | |
| Ranked #10 out of 14 Missouri Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) Avangrid Power LLC (2024 to 2024) |
Map of Farmers City Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Farmers City Wind LLC.
Monthly Net Generation for Farmers City Wind LLC
Farmers City Wind LLC Details
| Summary Information | |
|---|---|
| Plant Name | Farmers City Wind LLC (56767) |
| Plant Address | 13987 U.S. Highway 59, Tarkio, MO 64491 |
| Utility | Avangrid Power LLC (15399) |
| Latitude, Longitude | 40.575, -95.5228 |
| Generation Dates on File | Apr 2009 to Dec 2024 |
| Initial Operation Date | April 2009 |
| Annual Generation | 246.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG09-8-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | MidAmerican Energy Co (12341) IA |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 1 Details Operating April 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 146 MW |
| Summer Capacity | 146 MW |
| Winter Capacity | 146 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2009 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 73 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 73 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G87-2.0 |
| Design Wind Speed | 15.1 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 256 |
Farmers City Wind LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #665 | Hancock County Wind Energy Center | Garner, IA | 251.5 GWh |
| #666 | Minco Wind II, LLC | Minco, OK | 251.0 GWh |
| #667 | Smoky Hills Wind Project Phase I | Lincoln, KS | 250.8 GWh |
| #668 | San Roman Wind I, LLC | Los Fresnos, TX | 250.7 GWh |
| #669 | Rockland Wind Farm | American Falls, ID | 250.6 GWh |
| #670 | Laurel Mountain Hybrid | Belington, WV | 247.4 GWh |
| #671 | Blackstone Wind Farm LLC | Ransom, IL | 250.1 GWh |
| #672 | Wheatridge 1 | Lexington, OR | 249.3 GWh |
| #673 | Rising Tree Wind Farm | Mojave, CA | 249.0 GWh |
| #674 | Golden Hills Wind | Livermore, CA | 247.4 GWh |
| #676 | Klondike Windpower II | Wasco, OR | 245.8 GWh |
| #677 | Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh |
| #678 | Rolling Hills | Glenrock, WY | 244.8 GWh |
| #679 | Cassadaga Wind Farm | Cherry Creek, NY | 244.5 GWh |
| #680 | Lake Benton I | Lake Benton, MN | 243.8 GWh |
| #681 | Lost Lakes Wind Farm LLC | Lake Park, IA | 243.7 GWh |
| #682 | Sandy Ridge Wind 2, LLC | Tyrone, PA | 243.7 GWh |
| #683 | South Peak Wind | Geyser, MT | 240.9 GWh |
| #684 | NaturEner Glacier Wind Energy 2 | Ethridge, MT | 239.9 GWh |
| #685 | Oasis Wind | Mojave, CA | 238.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Farmers City Wind LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Atchison County Wind | Westboro, MO | 878.6 GWh | 9.3 mi |
| Auburn | Auburn, NE | 135.0 MWh | 21.3 mi |
| Cass County | Plattsmouth, NE | 202.4 GWh | 34.6 mi |
| Clear Creek Wind | Maryville, MO | 437.6 GWh | 36.1 mi |
| Contrail Wind Farm | Bedford, IA | 309.8 GWh | 36.8 mi |
| Cooper Nuclear Station | Brownville, NE | 6.2 TWh | 15.9 mi |
| Cow Branch | Tarkio, MO | 97.4 GWh | 8.9 mi |
| Falls City | Falls City, NE | 456.0 MWh | 36.2 mi |
| Flat Water Wind Farm LLC | Du Bois, NE | 215.6 GWh | 45.1 mi |
| Loess Hills | Rock Port, MO | 6.6 GWh | 11.1 mi |
| Nebraska City | Nebraska City, NE | 6.6 TWh | 13.7 mi |
| Nodaway | Conception Junction, MO | 27.4 GWh | 43.3 mi |
| Papillion Creek Wastewater | Bellevue, NE | 3.5 GWh | 39.2 mi |
| POET Biorefining LLC - Corning | Corning, IA | 14.0 GWh | 46.7 mi |
| Rock Creek Wind Project | Tarkio, MO | 1.0 TWh | 20.8 mi |
| Sarpy County | Bellevue, NE | 191.6 GWh | 47.3 mi |
| Shenandoah | Shenandoah, IA | 44.0 MWh | 15.5 mi |
| Villisca Municipal Power Plant | Villisca, IA | 7.0 MWh | 37.4 mi |
| Walter Scott Jr Energy Center | Council Bluffs, IA | 5.8 TWh | 45 mi |
| White Cloud Wind Project, LLC | Tarkio, MO | 832.2 GWh | 36.4 mi |