Leaning Juniper Wind Power II is ranked #25 out of 274 power plants in Oregon in terms of total annual net electricity generation.

Leaning Juniper Wind Power II generated 68.8 GWh during the 3-month period between September 2024 to December 2024.

Plant NameLeaning Juniper Wind Power II
Utility NameAvangrid Power LLC
LocationGilliam County, OR
Initial Operation DateMarch 2011
Last Update Dec 2024
Annual Generation 416.6 GWh
Annual Consumption 1.5 M MMBtu
Ranked #1,530 out of 12,539 Power Plants Nationwide
Ranked #435 out of 1,362 Wind Power Plants Nationwide
Ranked #25 out of 274 Oregon Power Plants
Ranked #9 out of 50 Oregon Wind Power Plants
Fuel Types Wind
Previous Operators Iberdrola Renewables Inc (2013 to 2014)
Avangrid Renewables Inc (2015 to 2015)
Avangrid Renewables LLC (2016 to 2023)
Avangrid Power LLC (2024 to 2024)

Map of Leaning Juniper Wind Power II

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Leaning Juniper Wind Power II.

Create Your Account Today

Monthly Net Generation for Leaning Juniper Wind Power II

Leaning Juniper Wind Power II Details

Summary Information
Plant NameLeaning Juniper Wind Power II (57333)
Plant Address72766 Rattlesnake Road, Arlington, OR 97812
UtilityAvangrid Power LLC (15399)
Latitude, Longitude45.651, -120.2598
Generation Dates on FileDec 2010 to Dec 2024
Initial Operation DateMarch 2011
Annual Generation 416.6 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket NumberEG10-62-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityAvangrid Renewables LLC (AVRN)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerBonneville Power Administration (1738) OR
Grid Voltage 230.00 kV
Energy StorageNo

Generator 1 Details Operating March 2011

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity199.2 MW
Summer Capacity199.2 MW
Winter Capacity199.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2011
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys116
Planned New Prime MoverWT
Planned Energy SourceWND
Planned New Nameplate Capacity217.6 MW
Planned RepowerNovember 2026
Multiple FuelsNo
Turbine Details
Number Of Turbines116
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SLE
Design Wind Speed14 MPH
Wind Quality Class4 - Very Low Wind
Turbine Hub Height Feet259

Leaning Juniper Wind Power II Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#425NedPower Mount StormMount Storm, WV431.4 GWh
#426Cedar Creek Wind, LLCShelley, ID431.1 GWh
#427Fowler Ridge IV Wind Farm LLCFowler, IN430.4 GWh
#428Glen Ullin Energy CenterGlen Ullin, ND426.7 GWh
#429Sunflower Wind ProjectMandan, ND426.4 GWh
#430Whispering Willow Wind Farm - EastIowa Falls, IA425.2 GWh
#431Heartland Divide Wind Project, LLCMelville, IA424.1 GWh
#432Midway Wind, LLCTaft, TX418.5 GWh
#433Glass Sands Wind FacilitySulphur, OK418.4 GWh
#434Los Vientos Windpower IVRio Grande City, TX418.3 GWh
#436Prairie Rose Wind FarmHardwick, MN414.4 GWh
#437Callahan Divide Wind Energy CenterTusocola, TX414.3 GWh
#438Smoky Hills Wind Project Phase IILincoln, KS414.3 GWh
#439Senate Wind LLCBryson, TX413.7 GWh
#440Voyager Wind IMojave, CA413.4 GWh
#441Morning Light Wind FarmAdair, IA413.3 GWh
#442Los Vientos Wind 1ASebastian, TX408.3 GWh
#443Camp Grove Wind FarmWyoming, IL406.4 GWh
#444Rock Falls Wind Farm LLCBraman, OK406.2 GWh
#445Post Oak Wind LLCAbilene, TX405.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Leaning Juniper Wind Power II.

Plant NamePlant LocationAnnual GenerationDistance
Arlington Wind Power ProjectArlington, OR201.0 GWh5.4 mi
Big Horn Wind ProjectBickelton, WA443.5 GWh16.4 mi
Biglow Canyon Wind FarmWasco, OR898.1 GWh16.6 mi
Goodnoe HillsGoldendale, WA275.5 GWh15.5 mi
Harvest Wind ProjectRoosevelt, WA263.7 GWh12 mi
Horseshoe Bend Wind LLCArlington, OR558.5 GWh13 mi
Klondike Wind PowerWasco, OR17.8 GWh15.5 mi
Klondike Windpower IIIWasco, OR689.1 GWh12.7 mi
Leaning JuniperArlington, OR275.2 GWh2.4 mi
Montague SolarArlington, OR381.9 GWh8.6 mi
Montague Wind Power Facility LLCArlington, OR472.2 GWh9.3 mi
North Hurlburt Wind LLCArlington, OR506.4 GWh10.2 mi
Pebble Springs Wind LLCWasco, OR219.0 GWh7.7 mi
South Hurlburt Wind LLCArlington, OR552.1 GWh9.5 mi
Star Point Wind Project LLCWasco, OR217.8 GWh14.4 mi
Threemile CanyonBoardman, OR22.4 GWh15.7 mi
Waste Management Columbia Ridge LFGTEArlington, OR55.3 GWh5.6 mi
Wheat Field Wind Power ProjectArlington, OR198.0 GWh3.3 mi
White Creek Wind FarmRoosevelt, WA563.7 GWh12 mi
Willow Creek Energy CenterLone, OR168.7 GWh13 mi