Twin Buttes Wind Project

31965 county Road, Lamar, CO 81052

Plant Summary Information

Twin Buttes Wind Project is ranked #49 out of 286 power plants in Colorado in terms of total annual net electricity generation.

Twin Buttes Wind Project generated 56.2 GWh during the 3-month period between September 2024 to December 2024.

Plant NameTwin Buttes Wind Project
Utility NameAvangrid Power LLC
LocationBent County, CO
Initial Operation DateJuly 2007
Last Update Dec 2024
Annual Generation 233.0 GWh
Annual Consumption 864.1 k MMBtu
Ranked #2,303 out of 12,613 Power Plants Nationwide
Ranked #702 out of 1,374 Wind Power Plants Nationwide
Ranked #49 out of 286 Colorado Power Plants
Ranked #23 out of 34 Colorado Wind Power Plants
Fuel Types Wind
Previous Operators Iberdrola Renewables Inc (2013 to 2014)
Avangrid Renewables Inc (2015 to 2015)
Avangrid Renewables LLC (2016 to 2023)
Avangrid Power LLC (2024 to 2024)

Map of Twin Buttes Wind Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Twin Buttes Wind Project.

Create Your Account Today

Monthly Net Generation for Twin Buttes Wind Project

Monthly Plant Fuel Consumption for Twin Buttes Wind Project

Twin Buttes Wind Project Details

Summary Information
Plant NameTwin Buttes Wind Project (56460)
Plant Address31965 county Road, Lamar, CO 81052
UtilityAvangrid Power LLC (15399)
Latitude, Longitude37.6735, -102.8622
Generation Dates on FileJul 2007 to Dec 2024
Initial Operation DateJuly 2007
Annual Generation 233.0 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number07-15-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityPublic Service Company of Colorado (PSCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPublic Service Co of Colorado (15466) CO
Grid Voltage 230.00 kV
Energy StorageNo

Generator WT1 Details Operating July 2007

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity75 MW
Summer Capacity75 MW
Winter Capacity75 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2007
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys50
Multiple FuelsNo
Turbine Details
Number Of Turbines50
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SLE
Design Wind Speed18.3 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet262

Twin Buttes Wind Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#692Notrees Windpower HybridGoldsmith, TX237.1 GWh
#693Oasis WindMojave, CA238.4 GWh
#694Meadow Lake Wind Farm II LLCLafayette, IN237.4 GWh
#695Crystal Lake 3 LLCBritt, IA236.6 GWh
#696Armenia Mountain Wind FarmMainesburg, PA235.4 GWh
#697Gratiot Wind ParkBreckenridge, MI234.9 GWh
#698Point WindTehachapi, CA234.1 GWh
#699Los Vientos V Wind PowerRio Grande City, TX233.6 GWh
#700High Winds LLCBirds Landing, CA233.3 GWh
#701Pinyon Pine IIMojave, CA233.1 GWh
#703Stony Creek Wind Farm NYStrykersville, NY232.9 GWh
#704Wessington SpringsWessington Springs, SD231.2 GWh
#705Weaver WindTownship 16, ME228.7 GWh
#706Gratiot County Wind LLCBreckenridge, MI228.4 GWh
#707Strauss Wind FarmLompoc, CA224.3 GWh
#708Bison 3 Wind Energy CenterNew Salem, ND223.3 GWh
#709Vasco WindsLivermore, CA223.0 GWh
#710Goat Wind LPSterling City, TX222.5 GWh
#711Alta Wind VIIIMojave, CA222.0 GWh
#712Coachella Hills WindPalm Springs, CA219.3 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Twin Buttes Wind Project.

Plant NamePlant LocationAnnual GenerationDistance
BH CSG 3La Junta, CO4.1 GWh44.5 mi
Busch Ranch II Wind FarmWalsenburg, CO139.0 GWh85.9 mi
Busch Ranch Wind EnergyWalsenburg, CO83.7 GWh89.5 mi
Colorado Green Holdings LLCLamar, CO594.9 GWh13.2 mi
Crossing Trails Wind Power Project LLC.Seibert, CO394.2 GWh94.9 mi
HollyHolly, CO3.0 MWh49.7 mi
Hugoton 2Hugoton, KS13.7 MWh90.6 mi
JohnsonJohnson, KS31.0 MWh61.3 mi
Johnson Corner Solar 1Johnson City, KS38.4 GWh58.8 mi
Lamar PlantLamar, CO12.6 GWh30.5 mi
Neptune Energy Center HybridBoone, CO679.3 GWh95.9 mi
NSE Camber BH CSG 2, LLCOrdway, CO3.9 GWh60.8 mi
Peak View Wind FarmWalsenburg, CO190.1 GWh89.9 mi
Spanish Peaks SolarTrinidad, CO344.2 GWh90.7 mi
Springfield WindSpringfield, CO5.3 GWh40.8 mi
Thunder Wolf Energy Center HybridAvondale, CO543.7 GWh91 mi
Trinidad (CO)Trinidad, CO5.0 MWh95.5 mi
Twin Buttes II WindLamar, CO298.0 GWh18.6 mi
USS Giveback Solar LLC (CSG)Pueblo, CO5.0 GWh82.5 mi
Vilas Solar ArraySpringfield, CO224.0 MWh29.5 mi