Locust Ridge II LLC
711 Raven Run Road, Shenandoah, PA 17976Plant Summary Information
Locust Ridge II LLC is ranked #8 out of 27 wind farms in Pennsylvania in terms of total annual net electricity generation.
Locust Ridge II LLC generated 55.3 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Locust Ridge II LLC |
|---|---|
| Utility Name | Avangrid Power LLC |
| Location | Schuylkill County, PA |
| Initial Operation Date | May 2009 |
| Last Update | Dec 2024 |
| Annual Generation | 184.1 GWh |
| Annual Consumption | 694.4 k MMBtu |
| Ranked #2,567 out of 12,539 Power Plants Nationwide | |
| Ranked #762 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #63 out of 243 Pennsylvania Power Plants | |
| Ranked #8 out of 27 Pennsylvania Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) Avangrid Power LLC (2024 to 2024) |
Map of Locust Ridge II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Locust Ridge II LLC.
Monthly Net Generation for Locust Ridge II LLC
Locust Ridge II LLC Details
| Summary Information | |
|---|---|
| Plant Name | Locust Ridge II LLC (56770) |
| Plant Address | 711 Raven Run Road, Shenandoah, PA 17976 |
| Utility | Avangrid Power LLC (15399) |
| Latitude, Longitude | 40.8411, -76.1547 |
| Generation Dates on File | May 2009 to Dec 2024 |
| Initial Operation Date | May 2009 |
| Annual Generation | 184.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG08-72-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PPL Electric Utilities Corp (14715) PA |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator 1 Details Operating May 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 102 MW |
| Summer Capacity | 102 MW |
| Winter Capacity | 102 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2009 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 51 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 51 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G87-2.0 |
| Design Wind Speed | 15.5 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 256 |
Locust Ridge II LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #752 | Franklin County Wind Farm | Iowa Falls, IA | 190.7 GWh |
| #753 | Peak View Wind Farm | Walsenburg, CO | 190.1 GWh |
| #754 | FPL Energy Burleigh County Wind | Wilton, ND | 189.7 GWh |
| #755 | Taloga Wind LLC | Putnam, OK | 189.1 GWh |
| #756 | Alexander Wind Farm LLC | Alexander, KS | 188.8 GWh |
| #757 | Pinnacle Wind Force LLC | Keyser, WV | 188.3 GWh |
| #758 | Shooting Star | Mullinville, KS | 187.2 GWh |
| #759 | Beebe 1A | Ithaca, MI | 187.0 GWh |
| #760 | Mountain View IV | North Palm Springs, CA | 186.8 GWh |
| #761 | Cotton Plains Wind Farm | Floydada, TX | 186.6 GWh |
| #763 | Conception | Stanberry, MO | 182.7 GWh |
| #764 | Golden Spread Panhandle Wnd Rch | Wilderado, TX | 181.7 GWh |
| #765 | Forest Creek Wind Farm LLC | Big Springs, TX | 180.9 GWh |
| #766 | FPL Energy Oliver Wind II LLC | Center, ND | 180.9 GWh |
| #767 | Bluegrass Ridge | King City, MO | 179.8 GWh |
| #768 | Hay Canyon Wind Power LLC | Wasco, OR | 179.8 GWh |
| #769 | Kingdom Community Wind | Lowell, VT | 179.6 GWh |
| #770 | Casa Mesa Wind Energy Center Hybrid | House, NM | 179.3 GWh |
| #771 | Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh |
| #772 | Perrin Ranch Wind LLC | Williams, AZ | 178.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Locust Ridge II LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Foster Wheeler Mt Carmel Cogen | Marion Heights, PA | 74.3 GWh | 15.7 mi |
| Hazelton | Hazelton, PA | 5.6 GWh | 8.5 mi |
| Hunlock Power Station | Hunlock Creek, PA | 630.9 GWh | 25.2 mi |
| Hunlock Unit 4 | Hunlock Creek, PA | 26.2 GWh | 25.4 mi |
| John B Rich Memorial Power Station | Frackville, PA | 616.9 GWh | 4.2 mi |
| Locust Ridge | Mahanoy City, PA | 50.4 GWh | 1.6 mi |
| Masser Farms Realty Solar | Sacramento, PA | 1.2 GWh | 27.4 mi |
| Moxie Freedom Generation Plant | Salem Township, PA | 7.5 TWh | 18.8 mi |
| Ontelaunee Energy Center | Reading, PA | 4.1 TWh | 31.2 mi |
| PA Solar Park | Nesquehoning, PA | 12.8 GWh | 15.9 mi |
| PA Solar Park II | Nesquehoning, PA | 15.5 GWh | 16.2 mi |
| Panther Creek Energy Facility | Nesquehoning, PA | 446.7 GWh | 14.5 mi |
| Pine Grove | Pine Grove, PA | 73.0 MWh | 23.2 mi |
| Romark PA Solar | Hazle Township, PA | 1.6 GWh | 8.9 mi |
| Schuylkill Haven PA BTM | Schuylkill Haven, PA | 322.0 MWh | 14.6 mi |
| St Nicholas Cogen Project | Shenandoah, PA | 670.2 GWh | 1.6 mi |
| TalenEnergy Montour | Washingtonville, PA | 4.3 TWh | 31.1 mi |
| TalenEnergy Susquehanna | Berwick, PA | 18.8 TWh | 17.3 mi |
| Weatherly(PA) RTO BTM | Weatherly, PA | 114.0 MWh | 18.6 mi |
| Westwood Generation LLC | Tremont, PA | 147.0 GWh | 21.8 mi |