Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Summit Associates | Public Service Elec & Gas Co | Edison, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Nov 2011 | Dec 2023 | Solar |
NJMC Landfill | Public Service Elec & Gas Co | Kearny, NJ | PJM Interconnection, LLC (PJM) | 3.8 GWh | Nov 2011 | Dec 2023 | Solar |
Johnson Matthey, Inc. Solar | Luminace Solar New Jersey II, LLC | Paulsboro, NJ | PJM Interconnection, LLC (PJM) | 4.9 GWh | Feb 2011 | Dec 2023 | Solar |
North Palm Springs 4A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 7.9 GWh | Sep 2012 | Dec 2023 | Solar |
Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2008 | Dec 2023 | Solar |
Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.7 GWh | Nov 2012 | Dec 2023 | Solar |
Mesquite Solar 1 | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 403.9 GWh | Oct 2011 | Dec 2023 | Solar |
Haleon York RDC Solar Facility | Haleon PLC | York, PA | PJM Interconnection, LLC (PJM) | 1.6 GWh | Nov 2010 | Dec 2023 | Solar |
Webberville Solar Project | FRV AE Solar LLC | Manor, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 56.4 GWh | Nov 2011 | Dec 2023 | Solar |
AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 569.0 GWh | Jul 2014 | Mar 2025 | Solar |
Aerojet I | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 5.9 GWh | Nov 2009 | Dec 2023 | Solar |
Matrix Stults Road Solar Facility | Public Service Elec & Gas Co | South Brunswick, NJ | PJM Interconnection, LLC (PJM) | 3.7 GWh | May 2011 | Dec 2023 | Solar |
Long Island Solar Farm LLC | Long Island Solar Farm LLC | Upton, NY | New York Independent System Operator (NYIS) | 48.1 GWh | Nov 2011 | Mar 2025 | Solar |
Hatch Solar Energy Center I, LLC | Hatch Solar Energy Center I, LLC | Hatch, NM | El Paso Electric Company (EPE) | 10.7 GWh | May 2011 | Mar 2025 | Solar |
Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 1.0 TWh | Mar 2013 | Mar 2025 | Solar |
Yolo County Solar Project | Yolo County of | Woodland, CA | California Independent System Operator (CISO) | 534.0 MWh | Nov 2010 | Dec 2023 | Solar |
CS Murphy Point, LLC | Duke Energy Renewables Services | Murphy, NC | Duke Energy Carolinas (DUK) | 1.2 GWh | Jul 2011 | Dec 2023 | Solar |
Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2009 | Dec 2023 | Solar |
City of Boulder WWTP | SunE NLB-2, LLC | Boulder, CO | Public Service Company of Colorado (PSCO) | 867.0 MWh | May 2010 | Dec 2023 | Solar |
Arlington Valley Solar Energy II | Arevon Energy, Inc. | Arlington, AZ | Arizona Public Service Company (AZPS) | 348.5 GWh | Mar 2013 | Dec 2023 | Solar |
UASTP I | Tucson Electric Power Co | Tucson, AZ | Tucson Electric Power (TEPC) | 403.0 MWh | Nov 2010 | Dec 2023 | Solar |
Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 24.5 GWh | Aug 2011 | Dec 2023 | Solar |
Roadrunner Solar | NRG Solar Roadrunner | Santa Teresa, NM | El Paso Electric Company (EPE) | 72.6 GWh | Jul 2011 | Dec 2023 | Solar |
Frenchtown II Solar | Consolidated Edison Development Inc. | Frenchtown, NJ | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2011 | Dec 2023 | Solar |
Lebanon Solar | Consolidated Edison Development Inc. | Glen Gardner, NJ | PJM Interconnection, LLC (PJM) | 2.5 GWh | Nov 2011 | Dec 2023 | Solar |
Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 860.0 MWh | Mar 2012 | Dec 2023 | Solar |
Moapa Southern Paiute | Arevon Energy, Inc. | Moapa, NV | Nevada Power Company (NEVP) | 623.1 GWh | Nov 2016 | Mar 2025 | Solar |
Panoche Valley Solar Farm | Consolidated Edison Development Inc. | Paicines, CA | California Independent System Operator (CISO) | 309.3 GWh | Dec 2017 | Mar 2025 | Solar |
Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2008 | Dec 2023 | Solar |
RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.7 GWh | Jan 2012 | Dec 2023 | Solar |
Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 388.3 GWh | Mar 2016 | Dec 2023 | Solar |
Masser Farms Realty Solar | Masser Farms Realty Ltd | Sacramento, PA | PJM Interconnection, LLC (PJM) | 754.0 MWh | Apr 2011 | Dec 2023 | Solar |
Silver Lake Solar Farm | Public Service Elec & Gas Co | Edison, NJ | PJM Interconnection, LLC (PJM) | 2.6 GWh | Sep 2010 | Dec 2023 | Solar |
McKee City Solar Phase 2 | MN8 Energy LLC | Egg Harbor Township, NJ | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2011 | Dec 2023 | Solar |
Five Points Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 18.9 GWh | Aug 2011 | Dec 2023 | Solar |
Green Acres Solar Facility 2 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Aug 2012 | Dec 2023 | Solar |
Westside Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 18.5 GWh | Jul 2011 | Dec 2023 | Solar |
Green Acres Solar Facility 1 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 4.8 GWh | Aug 2012 | Dec 2023 | Solar |
WC Landfill Energy LLC | MN8 Energy LLC | Oxford, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Oct 2006 | Dec 2023 | Solar |
Dartmouth II Solar | Consolidated Edison Development Inc. | Dartmouth, MA | ISO New England (ISNE) | 2.2 GWh | May 2012 | Dec 2023 | Solar |
FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.3 GWh | Jul 2010 | Dec 2023 | Solar |
L-8 Solar Project | L-8 Solar Project LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2012 | Dec 2023 | Solar |
Trenton Solar Farm | Public Service Elec & Gas Co | Trenton, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 2010 | Dec 2023 | Solar |
RV CSU Power II LLC | RV CSU Power II LLC | Fort Collins, CO | Public Service Company of Colorado (PSCO) | 2.7 GWh | Nov 2010 | Dec 2023 | Solar |
Dartmouth Solar | Consolidated Edison Development Inc. | Dartmouth, MA | ISO New England (ISNE) | 2.5 GWh | Feb 2011 | Dec 2023 | Solar |
Baldock Solar Highway | Portland General Electric Co | Aurora, OR | Portland General Electric Company (PGE) | 1.3 GWh | Dec 2011 | Dec 2023 | Solar |
Martins Creek Solar NC, LLC | Duke Energy Renewables Services | Murphy, NC | Duke Energy Carolinas (DUK) | 1.1 GWh | Feb 2011 | Dec 2023 | Solar |
Napoleon Solar I | Enfinity BNB Napoleon Solar LLC | Napoleon, OH | PJM Interconnection, LLC (PJM) | 9.4 GWh | Nov 2011 | Dec 2023 | Solar |
145 Talmadge Solar | Avidan Energy Solutions | Edison, NJ | PJM Interconnection, LLC (PJM) | 4.6 GWh | Mar 2011 | Dec 2023 | Solar |
Perdue Salisbury Photovoltaic | Terraform Arcadia | Salisbury, MD | PJM Interconnection, LLC (PJM) | 1.5 GWh | Aug 2011 | Dec 2023 | Solar |
Romark PA Solar | Romark Logistics of PA Inc. | Hazle Township, PA | PJM Interconnection, LLC (PJM) | 1.7 GWh | Oct 2011 | Dec 2023 | Solar |
DE Solar 10240 Old Dowd Rd | Duke Energy Carolinas, LLC | Charlotte, NC | Duke Energy Carolinas (DUK) | 1.4 GWh | Aug 2010 | Dec 2023 | Solar |
DE Solar 657 Brigham Rd | Duke Energy Carolinas, LLC | Greensboro, NC | Duke Energy Carolinas (DUK) | 810.0 MWh | Mar 2010 | Dec 2023 | Solar |
Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 64.6 GWh | Jan 2013 | Dec 2023 | Solar |
Murray Hill Solar | Consolidated Edison Development Inc. | New Providence, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Apr 2011 | Dec 2023 | Solar |
Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 277.2 GWh | Oct 2013 | Dec 2023 | Solar |
Chittenden County Solar Partners | Chittenden County Solar Partners LLC | South Burlington, VT | ISO New England (ISNE) | 2.8 GWh | Apr 2011 | Dec 2023 | Solar |
Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2010 | Dec 2023 | Solar |
Heller Industrial Parks | Marina Energy LLC | Dayton, NJ | PJM Interconnection, LLC (PJM) | 8.0 GWh | Nov 2011 | Dec 2023 | Solar |
L'Oreal Piscataway | MN8 Energy LLC | New Brunswick, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2011 | Dec 2023 | Solar |
DE Solar 1725 Drywall Dr | Duke Energy Carolinas, LLC | Mt. Holly, NC | Duke Energy Carolinas (DUK) | 796.0 MWh | Dec 2009 | Dec 2023 | Solar |
Dover Sun Park | Arevon Energy, Inc. | Dover, DE | PJM Interconnection, LLC (PJM) | 12.5 GWh | Jun 2011 | Mar 2025 | Solar |
Pilesgrove | Consolidated Edison Development Inc. | Pilesgrove, NJ | PJM Interconnection, LLC (PJM) | 26.1 GWh | Jul 2011 | Dec 2023 | Solar |
Flemington Solar | Consolidated Edison Development Inc. | Flemington, NJ | PJM Interconnection, LLC (PJM) | 11.5 GWh | Nov 2011 | Dec 2023 | Solar |
Frenchtown I Solar | Consolidated Edison Development Inc. | Frenchtown, NJ | PJM Interconnection, LLC (PJM) | 4.1 GWh | Dec 2011 | Dec 2023 | Solar |
Stockton Athletic Center | MN8 Energy LLC | Pomona, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Jan 2009 | Dec 2023 | Solar |
ISH Solar Central, LLC | SunEdison LLC | Bayville, NJ | PJM Interconnection, LLC (PJM) | 1.5 GWh | Sep 2011 | Dec 2023 | Solar |
RE McKenzie 3 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 2 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.5 GWh | Oct 2012 | Dec 2023 | Solar |
Roger Road WWTP | SunE M5C Holdings LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 1.1 GWh | Jul 2010 | Dec 2023 | Solar |
RE McKenzie 1 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2023 | Solar |
Titusville Solar | Janssen Pharmaceutical Co | Titusville, NJ | PJM Interconnection, LLC (PJM) | 4.1 GWh | Aug 2010 | Dec 2023 | Solar |
Kapaa Photovoltaic Project | Kapaa Solar LLC | Kapaa, HI | 1.6 GWh | Nov 2010 | Dec 2023 | Solar | |
Solar Photovoltaic Project #42 | Southern California Edison Co | Tulare, CA | California Independent System Operator (CISO) | 6.9 GWh | Oct 2012 | Dec 2023 | Solar |
William Paterson University | Nautilus Solar WPU LLC | Wayne, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 2010 | Dec 2023 | Solar |
Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 10.6 GWh | Jul 2011 | Dec 2023 | Solar |
Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 34.3 GWh | Jul 2011 | Dec 2023 | Solar |
Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.4 GWh | Jul 2011 | Dec 2023 | Solar |
California Valley Solar Ranch | Clearway Energy Operating LLC | California Valley, CA | California Independent System Operator (CISO) | 623.8 GWh | Aug 2012 | Dec 2023 | Solar |
Heliocentric | Heliocentric LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2012 | Dec 2023 | Solar |
Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.9 GWh | Feb 2012 | Dec 2023 | Solar |
Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2012 | Dec 2023 | Solar |
Solar Park Gainesville, LLC | Altus Power America Management, LLC | Gainesville, FL | Gainesville Regional Utilities (GVL) | 1.5 GWh | Jun 2011 | Dec 2023 | Solar |
RE Ajo 1 LLC | Duke Energy Renewables Services | Ajo, AZ | Arizona Public Service Company (AZPS) | 9.1 GWh | Jul 2011 | Dec 2023 | Solar |
Solar Star North Carolina II LLC | Duke Energy Renewables Services | Murfreesboro, NC | PJM Interconnection, LLC (PJM) | 8.7 GWh | Nov 2011 | Dec 2023 | Solar |
Morgantown Solar Park | The Hankin Group | Morgantown, PA | PJM Interconnection, LLC (PJM) | 1.3 GWh | Oct 2011 | Dec 2023 | Solar |
RE Bagdad Solar I LLC | Duke Energy Renewables Services | Bagdad, AZ | Arizona Public Service Company (AZPS) | 31.7 GWh | Nov 2011 | Dec 2023 | Solar |
AFA Solar Farm | Solar Star Colorado II LLC | Colorado Springs, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 11.0 GWh | Feb 2011 | Dec 2023 | Solar |
RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.1 GWh | Jan 2012 | Dec 2023 | Solar |
Silver State Solar Power North | Silver State Solar Power North, LLC | Primm, NV | Nevada Power Company (NEVP) | 115.2 GWh | Apr 2012 | Mar 2025 | Solar |
Giffen | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 13.4 GWh | May 2012 | Dec 2023 | Solar |
RE McKenzie 4 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.5 GWh | Oct 2012 | Dec 2023 | Solar |
Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2011 | Dec 2023 | Solar |
RE McKenzie 5 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.4 GWh | Oct 2012 | Dec 2023 | Solar |
Carson Solar I | Carson Solar 1 LLC | Colorado Springs, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 3.0 GWh | Nov 2007 | Dec 2023 | Solar |
Cantua Solar Station | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 33.9 GWh | May 2012 | Dec 2023 | Solar |
Huron Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 31.3 GWh | May 2012 | Dec 2023 | Solar |
RE McKenzie 6 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.4 GWh | Oct 2012 | Dec 2023 | Solar |
Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 354.0 MWh | Oct 2023 | Dec 2023 | Solar |
Cedar Trail | Florida Power & Light Co | Glen St Mary, FL | Florida Power & Light Co. (FPL) | 55.8 GWh | - | Mar 2025 | Solar |
Summary of Power Plants By State
Figures are based on March 2025 generation numbers.State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,399.45 GWh |
Alaska | # 48 | 137 | 460.30 GWh |
Arizona | # 16 | 167 | 7,756.35 GWh |
Arkansas | # 29 | 79 | 4,503.48 GWh |
California | # 5 | 1,565 | 15,306.94 GWh |
Colorado | # 30 | 257 | 4,337.74 GWh |
Connecticut | # 31 | 152 | 3,831.37 GWh |
Delaware | # 50 | 30 | 183.34 GWh |
District of Columbia | # 51 | 12 | 15.27 GWh |
Florida | # 3 | 305 | 18,686.61 GWh |
Georgia | # 9 | 239 | 9,979.52 GWh |
Hawaii | # 46 | 67 | 749.10 GWh |
Idaho | # 43 | 126 | 1,488.21 GWh |
Illinois | # 4 | 332 | 15,592.21 GWh |
Indiana | # 12 | 201 | 8,849.97 GWh |
Iowa | # 20 | 279 | 6,323.45 GWh |
Kansas | # 25 | 157 | 5,176.23 GWh |
Kentucky | # 24 | 56 | 5,180.56 GWh |
Louisiana | # 18 | 81 | 6,708.43 GWh |
Maine | # 45 | 157 | 1,313.29 GWh |
Maryland | # 39 | 179 | 2,427.73 GWh |
Massachusetts | # 42 | 597 | 1,608.56 GWh |
Michigan | # 10 | 263 | 9,898.87 GWh |
Minnesota | # 26 | 736 | 5,082.27 GWh |
Mississippi | # 19 | 53 | 6,374.07 GWh |
Missouri | # 21 | 116 | 5,776.95 GWh |
State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Montana | # 40 | 67 | 2,309.70 GWh |
Nebraska | # 37 | 117 | 3,008.88 GWh |
Nevada | # 34 | 109 | 3,381.98 GWh |
New Hampshire | # 44 | 56 | 1,374.49 GWh |
New Jersey | # 28 | 371 | 4,514.07 GWh |
New Mexico | # 35 | 138 | 3,378.20 GWh |
New York | # 8 | 818 | 10,278.94 GWh |
North Carolina | # 11 | 877 | 9,080.20 GWh |
North Dakota | # 33 | 57 | 3,690.67 GWh |
Ohio | # 6 | 190 | 11,252.37 GWh |
Oklahoma | # 17 | 129 | 6,972.70 GWh |
Oregon | # 22 | 254 | 5,543.74 GWh |
Pennsylvania | # 2 | 237 | 19,658.43 GWh |
Rhode Island | # 47 | 94 | 622.24 GWh |
South Carolina | # 14 | 194 | 8,606.12 GWh |
South Dakota | # 41 | 52 | 1,945.10 GWh |
Tennessee | # 23 | 85 | 5,241.09 GWh |
Texas | # 1 | 818 | 43,194.33 GWh |
Utah | # 36 | 114 | 3,056.84 GWh |
Vermont | # 49 | 112 | 230.44 GWh |
Virginia | # 15 | 214 | 8,465.83 GWh |
Washington | # 13 | 127 | 8,662.62 GWh |
West Virginia | # 38 | 36 | 2,977.95 GWh |
Wisconsin | # 27 | 222 | 4,571.79 GWh |
Wyoming | # 32 | 69 | 3,817.24 GWh |