Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| BRE | SRE Utility Solar 1, LLC | Oxford, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Franklinton Solar | Cypress Creek Renewables | Franklinton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Feb 2017 | Dec 2024 | Solar |
| St. Paul Intl Airport Red & Blue Parking | Metropolitan Airports Commission | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Nov 2015 | Nov 2025 | Solar |
| Adams Community Solar Garden LLC | Adams Community Solar Garden LLC | Watkins, CO | Public Service Company of Colorado (PSCO) | 3.9 GWh | Jun 2015 | Dec 2024 | Solar |
| Holdrege Solar Center | Adapture Renewables, Inc. | Lincoln, NE | Southwest Power Pool (SWPP) | 6.1 GWh | May 2016 | Nov 2025 | Solar |
| IKEA St. Louis 410 | IKEA Property Inc | St. Louis, MO | Midcontinent Independent System Operator, Inc. (MISO) | 328.0 MWh | Aug 2015 | Apr 2025 | Solar |
| OlivePV | Indiana Michigan Power Co | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 8.5 GWh | Jul 2016 | Nov 2025 | Solar |
| Cornwall Solar Center, LLC | SRE Utility Solar 1, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Sep 2016 | Dec 2024 | Solar |
| Innovative Solar 37 LLC | Dominion Renewable Energy | Morven, NC | Duke Energy Carolinas (DUK) | 137.7 GWh | Apr 2017 | Nov 2025 | Solar |
| Innovative Solar 47 | MN8 Energy LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 51.7 GWh | Mar 2017 | Nov 2025 | Solar |
| Valencia Solar | Big Sky Wind, LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 24.6 GWh | May 2013 | Dec 2024 | Solar |
| Deer Creek PV | Indiana Michigan Power Co | Marion, IN | PJM Interconnection, LLC (PJM) | 3.0 GWh | Dec 2015 | Nov 2025 | Solar |
| Innovative Solar 48 | Cypress Creek Renewables | Maxton, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Oct 2015 | Dec 2024 | Solar |
| Innovative Solar 54 | John Laing US Solar Corp. | Kinston, NC | Duke Energy Progress East (CPLE) | 99.0 GWh | Nov 2018 | Nov 2025 | Solar |
| Innovative Solar 23 | SRE Utility Solar 1, LLC | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | Nov 2015 | Dec 2024 | Solar |
| Clarkson Solar | AES Distributed Energy | Potsdam, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Oct 2014 | Dec 2024 | Solar |
| Innovative Solar 46 | Cypress Creek Renewables | Hope Mills, NC | Duke Energy Progress East (CPLE) | 128.9 GWh | Nov 2016 | Nov 2025 | Solar |
| Innovative Solar 44 | Cypress Creek Renewables | Shannon, NC | Duke Energy Carolinas (DUK) | 8.7 GWh | Oct 2015 | Dec 2024 | Solar |
| Innovative Solar 55 | Cypress Creek Renewables | Pembroke, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Innovative Solar 64 | Cypress Creek Renewables | Clinton, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Dec 2015 | Dec 2024 | Solar |
| Innovative Solar 67 | John Laing US Solar Corp. | Willard, NC | Duke Energy Progress East (CPLE) | 62.3 GWh | Nov 2018 | Nov 2025 | Solar |
| Watervliet PV | Indiana Michigan Power Co | Watervliet, MI | PJM Interconnection, LLC (PJM) | 6.6 GWh | Oct 2016 | Dec 2024 | Solar |
| Main Street Solar Project | Greenbacker Renewable Energy Corporation | Rutland, VT | ISO New England (ISNE) | 2.2 GWh | Nov 2014 | Dec 2024 | Solar |
| Foxconn Ohio | Foxconn | Warren, OH | PJM Interconnection, LLC (PJM) | 160.0 MWh | Dec 2014 | Oct 2025 | Solar |
| Brighton PV Solar Plant | Hangar 160 LLC | Brighton, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 3.3 GWh | Nov 2012 | Dec 2024 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2024 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2024 | Solar |
| Easton Landfill | CleanCapital Holdings | Easton, MA | ISO New England (ISNE) | 2.5 GWh | Sep 2013 | Dec 2024 | Solar |
| Ludlow Landfill | CleanCapital Holdings | Ludlow, MA | ISO New England (ISNE) | 3.4 GWh | Jul 2013 | Dec 2024 | Solar |
| Methuen Landfill | CleanCapital Holdings | Methuen, MA | ISO New England (ISNE) | 1.6 GWh | Jun 2013 | Dec 2024 | Solar |
| Plymouth Site 1 | CleanCapital Holdings | Plympton, MA | ISO New England (ISNE) | 7.2 GWh | Sep 2013 | Dec 2024 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2011 | Dec 2024 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2011 | Dec 2024 | Solar |
| EDF Lancaster | CleanCapital Holdings | Lancaster, MA | ISO New England (ISNE) | 5.7 GWh | Jun 2014 | Dec 2024 | Solar |
| Dartmouth Landfill | CleanCapital Holdings | Dartmouth, MA | ISO New England (ISNE) | 1.7 GWh | Jan 2013 | Dec 2024 | Solar |
| XPF Solar Field | United Therapeutics Corporation | Durham, NC | Duke Energy Carolinas (DUK) | 4.3 GWh | Nov 2014 | Dec 2024 | Solar |
| Green Farm | Cypress Creek Renewables | Robersonville, NC | PJM Interconnection, LLC (PJM) | 9.3 GWh | Dec 2015 | Dec 2024 | Solar |
| Simons Farm | Cypress Creek Renewables | Ahoskie, NC | PJM Interconnection, LLC (PJM) | 9.7 GWh | Dec 2015 | Dec 2024 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.6 GWh | Jul 2016 | Dec 2024 | Solar |
| Thornton PV1 | Ecoplexus, Inc | Snow Hill, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Nov 2015 | Dec 2024 | Solar |
| Watson Seed Farm PV1 | Ecoplexus, Inc | Whitakers, NC | PJM Interconnection, LLC (PJM) | 31.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Bradley PV1 | Ecoplexus, Inc | Aulander, NC | PJM Interconnection, LLC (PJM) | 7.7 GWh | Nov 2015 | Dec 2024 | Solar |
| Shawboro PV1 | Duke Energy Renewables Services | Shawboro, NC | PJM Interconnection, LLC (PJM) | 36.9 GWh | Sep 2015 | Dec 2024 | Solar |
| Carter PV1 | Ecoplexus, Inc | Fayetteville, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Enerparc CA1 LLC | Enerparc CA 1, LLC | Hollister, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2023 | Solar |
| West Salisbury Farm LLC | Strata Manager, LLC | Salisbury, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Aug 2015 | Dec 2024 | Solar |
| West Siler | Strata Manager, LLC | Siler City, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Dec 2016 | Dec 2024 | Solar |
| Yanceyville Farm 2 LLC | Strata Manager, LLC | Blanch, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Mar 2015 | Dec 2024 | Solar |
| Redmon Solar Farm LLC | Strata Manager, LLC | Cleveland, NC | Duke Energy Carolinas (DUK) | 4.0 GWh | Feb 2015 | Dec 2024 | Solar |
| Anderson Farm LLC | Strata Manager, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Sep 2014 | Dec 2024 | Solar |
| DD Fayetteville Solar NC LLC | Duke Energy Progress - (NC) | Fayetteville, NC | Duke Energy Carolinas (DUK) | 37.9 GWh | Oct 2015 | Dec 2024 | Solar |
| Warsaw I | AES Distributed Energy | Warsaw, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Nov 2013 | Dec 2024 | Solar |
| Warsaw II | AES Distributed Energy | Warsaw, NC | Duke Energy Carolinas (DUK) | 3.6 GWh | Nov 2013 | Dec 2024 | Solar |
| Acushnet-Braley Road 1 | CleanCapital Holdings | Freetown, MA | ISO New England (ISNE) | 2.3 GWh | Dec 2012 | Dec 2024 | Solar |
| Pecan PV1 | Ecoplexus, Inc | Cordova, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Nov 2014 | Dec 2024 | Solar |
| Moncure Farm LLC | Strata Manager, LLC | Moncure, NC | Duke Energy Progress East (CPLE) | 6.1 GWh | Mar 2014 | Dec 2024 | Solar |
| Martin Creek Farm LLC | Strata Manager, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 5.6 GWh | Feb 2014 | Dec 2024 | Solar |
| Kinston | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Mar 2014 | Dec 2024 | Solar |
| Daniel Farm LLC | Strata Manager, LLC | Mocksville, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Feb 2014 | Dec 2024 | Solar |
| Bailey Farm LLC | Strata Manager, LLC | Bailey, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Oct 2013 | Dec 2024 | Solar |
| Acushnet- High Hill | CleanCapital Holdings | Dartmouth, MA | ISO New England (ISNE) | 3.5 GWh | Feb 2013 | Dec 2024 | Solar |
| CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2024 | Solar |
| CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2024 | Solar |
| Soluga Farms 2 LLC | Strata Manager, LLC | Clarkton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Aug 2014 | Dec 2024 | Solar |
| Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.2 GWh | Jul 2014 | Dec 2024 | Solar |
| CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 45.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Mulberry Farm LLC | Onward Energy | Selmer, TN | Tennessee Valley Authority (TVA) | 25.1 GWh | Nov 2014 | Nov 2025 | Solar |
| Jacobstown | NJR Clean Energy Ventures Corporation | North Hanover, NJ | PJM Interconnection, LLC (PJM) | 7.7 GWh | Aug 2014 | Dec 2024 | Solar |
| West Pemberton | NJR Clean Energy Ventures Corporation | Pemberton Twp, NJ | PJM Interconnection, LLC (PJM) | 11.5 GWh | Jun 2014 | Dec 2024 | Solar |
| Selmer Farm LLC | Onward Energy | Selmer, TN | Tennessee Valley Authority (TVA) | 25.7 GWh | Sep 2014 | Nov 2025 | Solar |
| East Wayne Solar LLC | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Feb 2014 | Dec 2024 | Solar |
| Vickers | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Jul 2014 | Dec 2024 | Solar |
| Soluga Farms 1 | Strata Manager, LLC | Newton Grove, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | May 2014 | Dec 2024 | Solar |
| Marion Solar LNG | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2015 | Dec 2024 | Solar |
| Sterling PV 3 | Greenbacker Renewable Energy Corporation | Sterling, CO | Public Service Company of Colorado (PSCO) | 3.8 GWh | Nov 2014 | Dec 2024 | Solar |
| Mesa PV1 | Greenbacker Renewable Energy Corporation | Grand Junction, CO | Public Service Company of Colorado (PSCO) | 3.4 GWh | Nov 2014 | Dec 2024 | Solar |
| Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 6.5 GWh | Jun 2014 | Dec 2024 | Solar |
| OCI Alamo 3 LLC | Consolidated Edison Development Inc. | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 9.9 GWh | Nov 2014 | Dec 2024 | Solar |
| OCI Alamo 5 LLC | Consolidated Edison Development Inc. | Uvalde, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 186.4 GWh | Nov 2015 | Dec 2024 | Solar |
| Alamo 6 | BHE Renewables, LLC | Fort Stockton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 226.1 GWh | Feb 2017 | Nov 2025 | Solar |
| OCI Alamo 7 LLC | Consolidated Edison Development Inc. | Haskell, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 245.3 GWh | Jul 2016 | Dec 2024 | Solar |
| Clipperton Holdings LLC | Dominion Renewable Energy | Clinton, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Tiburon Holdings | Heelstone Energy Holdings, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Windsor Solar | Strata Manager, LLC | Windsor, NC | PJM Interconnection, LLC (PJM) | 9.8 GWh | Nov 2014 | Dec 2024 | Solar |
| Langley PV1 | Ecoplexus, Inc | Elm City, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2014 | Dec 2024 | Solar |
| Mariposa Solar Center LLC | Heelstone Energy Holdings, LLC | Stanley, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Aug 2016 | Dec 2024 | Solar |
| Highland Solar Center LLC | SRE Utility Solar 1, LLC | Grifton, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Nov 2015 | Dec 2024 | Solar |
| Elm City Solar Facility | Duke Energy Progress - (NC) | Elm City, NC | Duke Energy Progress East (CPLE) | 73.6 GWh | Feb 2016 | Dec 2024 | Solar |
| Bridgeport Disposal Solar Farm | Bridgeport Disposal LLC | Gloucester, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Mar 2011 | Dec 2024 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Avalon Solar | Arevon Energy, Inc. | Pima, AZ | Tucson Electric Power (TEPC) | 64.6 GWh | Nov 2014 | Dec 2024 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
| Jakana Solar | Strata Manager, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 9.9 GWh | Oct 2014 | Dec 2024 | Solar |
| Springfield Solar 1 LLC | Strata Manager, LLC | Strafford, MO | Southwest Power Pool (SWPP) | 6.8 GWh | May 2014 | Nov 2025 | Solar |
| Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Oct 2015 | Dec 2024 | Solar |
| Bethel Solar | Strata Manager, LLC | Bethel, NC | PJM Interconnection, LLC (PJM) | 6.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Lewiston Solar | Strata Manager, LLC | Lewiston, NC | PJM Interconnection, LLC (PJM) | 9.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Woodland Solar | Duke Energy Renewables Services | Woodland, NC | PJM Interconnection, LLC (PJM) | 9.1 GWh | Mar 2016 | Dec 2024 | Solar |
| Williamston Solar | Strata Manager, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 10.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Winton Solar | Duke Energy Renewables Services | Winton, NC | PJM Interconnection, LLC (PJM) | 9.2 GWh | Jan 2016 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on November 2025 generation numbers.| State | Rank | Active Plants | Nov 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 11,511.20 GWh |
| Alaska | # 48 | 144 | 528.08 GWh |
| Arizona | # 13 | 184 | 8,245.57 GWh |
| Arkansas | # 24 | 116 | 5,216.59 GWh |
| California | # 4 | 1,736 | 15,288.71 GWh |
| Colorado | # 29 | 302 | 4,252.83 GWh |
| Connecticut | # 34 | 166 | 3,697.17 GWh |
| Delaware | # 49 | 33 | 425.33 GWh |
| District of Columbia | # 51 | 16 | 14.43 GWh |
| Florida | # 2 | 323 | 18,667.27 GWh |
| Georgia | # 8 | 262 | 11,183.00 GWh |
| Hawaii | # 47 | 73 | 801.36 GWh |
| Idaho | # 43 | 146 | 1,663.41 GWh |
| Illinois | # 5 | 384 | 14,942.91 GWh |
| Indiana | # 15 | 211 | 7,722.21 GWh |
| Iowa | # 19 | 293 | 6,283.14 GWh |
| Kansas | # 32 | 187 | 4,136.03 GWh |
| Kentucky | # 21 | 60 | 5,370.35 GWh |
| Louisiana | # 12 | 86 | 8,259.66 GWh |
| Maine | # 45 | 216 | 1,300.62 GWh |
| Maryland | # 40 | 203 | 2,568.19 GWh |
| Massachusetts | # 41 | 648 | 1,975.71 GWh |
| Michigan | # 9 | 273 | 10,785.64 GWh |
| Minnesota | # 28 | 765 | 4,723.22 GWh |
| Mississippi | # 23 | 57 | 5,274.88 GWh |
| Missouri | # 22 | 128 | 5,368.91 GWh |
| State | Rank | Active Plants | Nov 2025 Generation |
|---|---|---|---|
| Montana | # 39 | 71 | 2,609.34 GWh |
| Nebraska | # 35 | 129 | 3,447.15 GWh |
| Nevada | # 38 | 114 | 3,066.88 GWh |
| New Hampshire | # 44 | 60 | 1,466.90 GWh |
| New Jersey | # 27 | 393 | 4,952.95 GWh |
| New Mexico | # 36 | 144 | 3,313.38 GWh |
| New York | # 10 | 956 | 10,414.21 GWh |
| North Carolina | # 11 | 909 | 9,927.17 GWh |
| North Dakota | # 33 | 61 | 3,714.56 GWh |
| Ohio | # 6 | 198 | 11,688.48 GWh |
| Oklahoma | # 18 | 143 | 6,525.64 GWh |
| Oregon | # 20 | 275 | 5,407.05 GWh |
| Pennsylvania | # 3 | 256 | 17,277.29 GWh |
| Rhode Island | # 46 | 100 | 833.56 GWh |
| South Carolina | # 16 | 208 | 7,560.03 GWh |
| South Dakota | # 42 | 52 | 1,785.37 GWh |
| Tennessee | # 26 | 88 | 5,030.87 GWh |
| Texas | # 1 | 955 | 43,514.30 GWh |
| Utah | # 37 | 125 | 3,174.08 GWh |
| Vermont | # 50 | 117 | 164.43 GWh |
| Virginia | # 17 | 239 | 7,087.47 GWh |
| Washington | # 14 | 137 | 7,966.23 GWh |
| West Virginia | # 31 | 39 | 4,211.99 GWh |
| Wisconsin | # 25 | 250 | 5,195.24 GWh |
| Wyoming | # 30 | 71 | 4,237.64 GWh |