Sauk Solar Park
344 W Hayner Rd, Union City, MI 49094Plant Summary Information
Sauk Solar Park is ranked #4 out of 75 solar farms in Michigan in terms of total annual net electricity generation.
Sauk Solar Park generated 76.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Sauk Solar Park |
|---|---|
| Utility Name | DTE Electric Company |
| Location | Branch County, MI |
| Initial Operation Date | January 2025 |
| Last Update | May 2026 |
| Annual Generation | 228.5 GWh |
| Annual Consumption | 887.5 k MMBtu |
| Ranked #2,377 out of 13,081 Power Plants Nationwide | |
| Ranked #410 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #53 out of 269 Michigan Power Plants | |
| Ranked #4 out of 75 Michigan Solar Power Plants | |
| Fuel Types | Solar |
Map of Sauk Solar Park
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sauk Solar Park.
Monthly Net Generation for Sauk Solar Park
Monthly Plant Fuel Consumption for Sauk Solar Park
Sauk Solar Park Details
| Summary Information | |
|---|---|
| Plant Name | Sauk Solar Park (67942) |
| Plant Address | 344 W Hayner Rd, Union City, MI 49094 |
| Utility | DTE Electric Company (5109) |
| Latitude, Longitude | 42.06202, -85.10297 |
| Generation Dates on File | Jan 2025 to May 2026 |
| Initial Operation Date | January 2025 |
| Annual Generation | 228.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Michigan Electric Transmission Company, (56163) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator SAUSP Details Operating January 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 189 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sauk Solar Park Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #400 | Galloway 2 Solar Farm | Paint Rock, TX | 231.9 GWh |
| #401 | Oak Trail Solar, LLC | Moyock, NC | 231.7 GWh |
| #402 | OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh |
| #403 | Enterprise Solar, LLC | Newcastle, UT | 231.2 GWh |
| #404 | SR Clay, LLC | Fort Gaines, GA | 230.9 GWh |
| #405 | Dodson Creek Solar, LLC | Hillsboro, OH | 230.5 GWh |
| #406 | New Madrid Solar, LLC | Marston, MO | 229.7 GWh |
| #407 | Dressor Plains Solar, LLC | Herrick, IL | 228.9 GWh |
| #408 | Three Peaks Power | Cedar City, UT | 228.7 GWh |
| #409 | Ivanpah 2 | Nipton, CA | 236.1 GWh |
| #411 | Felina | Fabens, TX | 228.2 GWh |
| #412 | Prairie Mist Solar | Montrose, AR | 228.2 GWh |
| #413 | Roadrunner Solar and BESS | Cochise, AZ | 219.3 GWh |
| #414 | Assembly Solar II LLC | Lennon, MI | 226.3 GWh |
| #415 | Albemarle Beach Solar | Roper, NC | 225.7 GWh |
| #416 | East Pecos Solar | McCamey, TX | 225.1 GWh |
| #417 | Prairie State Solar Project | Swanwick Township, IL | 224.3 GWh |
| #418 | West of the Pecos Solar | TBD, TX | 224.0 GWh |
| #419 | Ross County Solar, LLC | Greenfield, OH | 223.2 GWh |
| #420 | Martin County Solar Project, LLC | Pilgrim, KY | 223.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sauk Solar Park.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 13 Mile Solar, LLC | Battle Creek, MI | 4.0 GWh | 18.5 mi |
| Angola Solar, LLC | Coldwater, MI | 4.0 GWh | 16.4 mi |
| Battle Creek Mill | Battle Creek, MI | 4.2 GWh | 18.7 mi |
| Branch Solar Project | Coldwater, MI | 12.3 GWh | 12.4 mi |
| Bullhead Solar, LLC | Fayette, MI | 4.0 GWh | 23.1 mi |
| Calhoun County Solar Project | Sheridan Township, MI | 249.8 GWh | 19.9 mi |
| Calhoun Solar | Battle Creek, MI | 368.8 GWh | 19.3 mi |
| Cereal City Solar, LLC | Battle Creek, MI | 198.6 GWh | 17.2 mi |
| Coldwater Peaking Plant | Coldwater, MI | 1.7 GWh | 10.6 mi |
| Coldwater River Solar | Coldwater, MI | 166.9 GWh | 12.3 mi |
| DG AMP Solar Coldwater | Coldwater, MI | 1.9 GWh | 10.4 mi |
| Greenstone Solar, LLC | Coldwater, MI | 35.4 GWh | 8.3 mi |
| GRS C&C | Marshall, MI | 21.0 GWh | 20.9 mi |
| Heartwood Solar | Allen, MI | 21.6 GWh | 20.9 mi |
| Hydro Plant | Three Rivers, MI | 6.7 GWh | 23.2 mi |
| Marshall (MI) | Marshall, MI | 638.0 MWh | 16.7 mi |
| River Fork Solar, LLC | Albion, MI | 291.0 GWh | 23.4 mi |
| Shipsterns Solar, LLC | Albion, MI | 40.8 GWh | 24.1 mi |
| Sturgis City Diesel Plant | Sturgis, MI | 1.3 GWh | 24.6 mi |
| The Andersons Albion Ethanol LLC | Albion, MI | 62.0 GWh | 21 mi |