Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2019 | Dec 2023 | Solar |
Eagle Valley (MI) | WM Renewable Energy LLC | Orion, MI | Midcontinent Independent System Operator, Inc. (MISO) | 21.6 GWh | Jun 2011 | Dec 2023 | Landfill Gas |
Edgewater | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 TWh | Jun 1951 | Mar 2025 | Subbituminous Coal : 99.9% |
Elm Road Generating Station | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 TWh | Jan 2010 | Mar 2025 | Subbituminous Coal : 72.3% Bituminous Coal : 17.5% Natural Gas : 10.2% |
Exira | Western Minnesota Mun Pwr Agny | Brayton, IA | Southwest Power Pool (SWPP) | 229.8 GWh | Mar 2004 | Dec 2023 | Natural Gas : 99.0% Distillate Fuel Oil : 1.0% |
El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 7.6 GWh | May 2010 | Dec 2023 | Natural Gas |
Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 23.3 GWh | Dec 2013 | Dec 2023 | Natural Gas |
Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 25.5 GWh | Sep 2010 | Dec 2023 | Landfill Gas |
Elizabeth River Power Station | Virginia Electric & Power Co | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 109.2 GWh | May 1992 | Dec 2023 | Natural Gas : 97.9% Distillate Fuel Oil : 2.1% |
Ellenburg | Valcour Operating Services, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 111.3 GWh | Apr 2008 | Dec 2023 | Wind |
Eagle Solar | USF Essex Lessor, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 7.0 GWh | Jul 2020 | Dec 2023 | Solar |
Eufaula Dam | USCE-Tulsa District | Porum, OK | Southwestern Power Administration (SPA) | 216.1 GWh | Jun 1964 | Dec 2023 | Water |
Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 4.7 GWh | Jan 2007 | Dec 2023 | Natural Gas |
East Campus Utility Plant | University of Cincinnati | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 129.4 MWh | Jun 2006 | Mar 2025 | Distillate Fuel Oil |
Emmitsburg Solar Arrays | UGI Energy Services, LLC | Emmitsburg, MD | PJM Interconnection, LLC (PJM) | 2.5 GWh | Mar 2014 | Mar 2025 | Solar |
Estes | U S Bureau of Reclamation | Estes Park, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 106.1 GWh | Aug 1950 | Dec 2023 | Water |
Eielson AFB Central Heat & Power Plant | U S Air Force-Eielson AFB | Eielson AFB, AK | 86.9 GWh | Sep 1952 | Dec 2023 | Subbituminous Coal : 99.5% | |
Electric Avenue Facility | Town of Culpeper- (VA) | Culpeper, VA | PJM Interconnection, LLC (PJM) | 480.0 MWh | Jan 1997 | Dec 2023 | Distillate Fuel Oil |
Equilon Los Angeles Refining | Tesoro Refining and Marketing Company | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 368.3 GWh | Nov 1982 | Mar 2025 | Other Gas : 97.2% Natural Gas : 2.8% |
Estrella Mountain PV | Tesla Inc. | Avondale, AZ | Arizona Public Service Company (AZPS) | 4.2 GWh | May 2019 | Dec 2023 | Solar |
Eichtens II CSG | Terraform Arcadia | Winstead, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2018 | Dec 2023 | Solar |
Eichtens Community Solar | Terraform Arcadia | Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Nov 2016 | Dec 2023 | Solar |
E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2023 | Solar |
East Winds Project | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 1983 | Dec 2023 | Wind |
Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 305.2 GWh | Nov 2022 | Mar 2025 | Solar |
Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 77.1 GWh | Oct 2022 | Mar 2025 | Solar |
Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 81.5 GWh | Feb 2022 | Mar 2025 | Solar |
Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 92.8 GWh | Feb 2022 | Mar 2025 | Solar |
Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 133.2 GWh | Nov 2022 | Mar 2025 | Solar |
Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 329.9 GWh | Jul 2022 | Mar 2025 | Solar |
Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 348.6 GWh | Oct 2022 | Mar 2025 | Solar |
Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 293.2 GWh | Nov 2021 | Mar 2025 | Solar |
Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 51.7 GWh | Nov 2021 | Mar 2025 | Solar |
Elkhorn Valley Wind Farm | Telocaset Wind Power Partners | Union, OR | Idaho Power Company (IPCO) | 312.3 GWh | Nov 2007 | Dec 2023 | Wind |
Engelhard Solar LLC | SunRay Power LLC | Monroe, NJ | PJM Interconnection, LLC (PJM) | 706.0 MWh | Nov 2012 | Dec 2023 | Solar |
Elkton Solar | SunE DB27, LLC | Elkton, MD | PJM Interconnection, LLC (PJM) | 1.5 GWh | Nov 2015 | Dec 2023 | Solar |
Edison Farm | Strata Manager, LLC | Eden, NC | Duke Energy Carolinas (DUK) | 4.1 GWh | Oct 2022 | Dec 2023 | Solar |
Erwin Farm | Strata Manager, LLC | Erwin, NC | Duke Energy Progress East (CPLE) | 7.2 GWh | Aug 2014 | Dec 2023 | Solar |
Eastover Farm | Strata Manager, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Aug 2014 | Dec 2023 | Solar |
East Wayne Solar LLC | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Feb 2014 | Dec 2023 | Solar |
ESA Smithfield | SRE Utility Solar 1, LLC | Smithfield, NC | Duke Energy Progress East (CPLE) | 3.0 GWh | Sep 2015 | Dec 2023 | Solar |
ESA Selma | SRE Utility Solar 1, LLC | Selma, NC | Duke Energy Progress East (CPLE) | 2.6 GWh | Aug 2015 | Dec 2023 | Solar |
Elm Solar, LLC | SRE Utility Solar 1, LLC | Sanford, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Nov 2015 | Dec 2023 | Solar |
Edward L. Addison Generating Plant | Southern Power Co | Thomaston, GA | Southern Company Services, Inc. - Trans (SOCO) | 200.2 GWh | May 2000 | Dec 2023 | Natural Gas : 99.7% |
E B Harris Electric Generating Plant | Southern Power Co | Autaugaville, AL | Southern Company Services, Inc. - Trans (SOCO) | 5.2 TWh | May 2003 | Mar 2025 | Natural Gas |
East Pecos Solar | Southern Power Co | McCamey, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 241.5 GWh | Mar 2017 | Mar 2025 | Solar |
Eros Solar, LLC | Sol Systems | Mt Olive, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Sep 2020 | Dec 2023 | Solar |
Eldorado Solar I | Sol Systems | Saline County, IL | 53.4 GWh | - | Mar 2025 | Solar | |
ESA Buies Creek, LLC | Sol Systems | Lillington, NC | Duke Energy Progress East (CPLE) | 5.6 GWh | Sep 2020 | Dec 2023 | Solar |
ESA Boston Solar, LLC | Sol Systems | Roxboro, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2020 | Dec 2023 | Solar |
EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2023 | Solar |
EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 9.5 GWh | Jun 2021 | Dec 2023 | Solar |
EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.2 GWh | Apr 2022 | Nov 2023 | Solar |
EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 8.0 GWh | Jun 2021 | Dec 2023 | Solar |
EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2021 | Dec 2023 | Solar |
El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2021 | Dec 2023 | Solar |
Eolos Wind Energy Research Field Station | Regents of the University of Minnesota | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Sep 2011 | Dec 2023 | Wind |
Encogen | Puget Sound Energy Inc | Bellingham, WA | Puget Sound Energy, Inc. (PSEI) | 528.9 GWh | Feb 1993 | Mar 2025 | Natural Gas |
Edison 0308 Solar | Prologis Logistics Services Incorporated | Edison, NJ | PJM Interconnection, LLC (PJM) | 464.0 MWh | Mar 2022 | Dec 2023 | Solar |
Edison 7205 Solar | Prologis Logistics Services Incorporated | Edison, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Oct 2022 | Dec 2023 | Solar |
Elizabeth Seaport Bldg A Solar | Prologis Logistics Services Incorporated | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Dec 2021 | Dec 2023 | Solar |
E. Porte Ct. | Power Depot Group A, LLC | Harlingen, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 599.0 MWh | Jul 2013 | Dec 2023 | Distillate Fuel Oil |
East Nash PV2 | Pine Gate Renewables | Spring Hope, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Nov 2023 | Dec 2023 | Solar |
East Campus Steam Plant | Penn State University | University Park, PA | PJM Interconnection, LLC (PJM) | 45.2 GWh | May 2011 | Mar 2025 | Natural Gas : 99.9% |
Eiffel Solar Project | Paris Farm Solar, LLC | Paris, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 562.4 GWh | Oct 2023 | Mar 2025 | Solar |
Ekola Flats | PacifiCorp | Hanna, WY | PacifiCorp East (PACE) | 776.6 GWh | Nov 2020 | Mar 2025 | Wind |
Eagle Point | PacifiCorp | Eagle Point, OR | PacifiCorp West (PACW) | 14.7 GWh | Oct 1957 | Dec 2023 | Water |
Electra | Pacific Gas & Electric Co. | Jackson, CA | California Independent System Operator (CISO) | 252.1 GWh | May 1948 | Mar 2025 | Water |
Engineered Carbons Borger Cogen | Orion Engineered Carbons | Borger, TX | Southwest Power Pool (SWPP) | 40.5 GWh | Sep 1982 | Dec 2023 | Other Gas : 99.5% |
Elk City Station | Omaha Public Power District | Bennington, NE | Southwest Power Pool (SWPP) | 48.7 GWh | Mar 2002 | Dec 2023 | Landfill Gas |
Effingham Energy Facility | Oglethorpe Power Corporation | Rincon, GA | Southern Company Services, Inc. - Trans (SOCO) | 2.0 TWh | Jul 2003 | Mar 2025 | Natural Gas |
East Acres Solar NG, LLC | NuGen Capital Management | Pittsfield, MA | ISO New England (ISNE) | 4.8 GWh | Mar 2017 | Dec 2023 | Solar |
East Springfield Solar PV | NSTAR Electric Company | Springfield, MA | ISO New England (ISNE) | 1.9 GWh | Sep 2018 | Dec 2023 | Solar |
East Longmeadow Solar PV | NSTAR Electric Company | East Longmeadow, MA | ISO New England (ISNE) | 5.7 GWh | Sep 2019 | Dec 2023 | Solar |
Eagle Point Solar | Norwest Energy 7, LLC | Central Point, OR | PacifiCorp West (PACW) | 18.1 GWh | Nov 2017 | Dec 2023 | Solar |
Encino Solar Energy Center | NMRD Data Center, LLC | Rio Rancho Estates, NM | Public Service Company of New Mexico (PNM) | 144.8 GWh | Jun 2020 | Mar 2025 | Solar |
East Amwell | NJR Clean Energy Ventures Corporation | East Amwell Twp, NJ | PJM Interconnection, LLC (PJM) | 2.7 GWh | Apr 2016 | Dec 2023 | Solar |
Ensign Wind LLC | NextEra Energy Resources Ensign Wind | Montezuma, KS | Southwest Power Pool (SWPP) | 483.0 GWh | Oct 2012 | Dec 2023 | Wind |
Ellsworth I CSG | Nautilus Solar Solutions | Mechanicville, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Aug 2019 | Dec 2023 | Solar |
East Hampton | National Grid Generation LLC | East Hampton, NY | New York Independent System Operator (NYIS) | 12.2 GWh | Nov 1962 | Dec 2023 | Distillate Fuel Oil |
E F Barrett | National Grid Generation LLC | Island Park, NY | New York Independent System Operator (NYIS) | 1.3 TWh | Oct 1956 | Mar 2025 | Natural Gas : 98.8% Residual Fuel Oil : 0.9% |
EDF Ph1 Toms River | MN8 Energy LLC | Tom's River, NJ | PJM Interconnection, LLC (PJM) | 34.8 GWh | May 2021 | Dec 2023 | Solar |
East Orange Solar | MN8 Energy LLC | Millburn Township, NJ | PJM Interconnection, LLC (PJM) | 5.8 GWh | Feb 2015 | Dec 2023 | Solar |
ETS Ewing Solar Facility | MN8 Energy LLC | Ewing, NJ | PJM Interconnection, LLC (PJM) | 809.0 MWh | May 2010 | Dec 2023 | Solar |
Equuleus Community Solar Gardens | MN8 Energy LLC | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Jul 2017 | Dec 2023 | Solar |
El Dorado Springs Solar Farm | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | El Dorado Springs, MO | Southwest Power Pool (SWPP) | 4.4 GWh | May 2018 | Dec 2023 | Solar |
Eclipse Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 867.9 GWh | Aug 2012 | Mar 2025 | Wind |
Electrifarm | MidAmerican Energy Co | Waterloo, IA | Midcontinent Independent System Operator, Inc. (MISO) | 11.6 GWh | Apr 1975 | Dec 2023 | Natural Gas : 97.2% Distillate Fuel Oil : 2.8% |
Etiwanda | Metropolitan Water District of S CA | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 16.7 GWh | Nov 1994 | Dec 2023 | Water |
Elkton | Merck & Co Inc | Elkton, VA | PJM Interconnection, LLC (PJM) | 13.0 GWh | May 1982 | Dec 2023 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
Exchequer | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 250.6 GWh | Jun 1967 | Dec 2023 | Water |
Eagle Pass | Maverick Cty Water Control & Improvement | Eagle Pass, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 33.2 GWh | Jul 1932 | Mar 2025 | Water |
Eklutna Generation Station | Matanuska Electric Assn Inc | Chugiak, AK | 717.0 GWh | Jan 2015 | Dec 2023 | Natural Gas | |
Eastern Correctional Institute | Maryland Environmental Service | Westover, MD | PJM Interconnection, LLC (PJM) | 3.8 GWh | Jul 1987 | Mar 2025 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.6 GWh | Aug 2021 | Dec 2023 | Solar |
ESIL-PFCHICAGO 3, LLC | Madison Energy Holdings LLC | Chicago, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Jul 2020 | Dec 2023 | Solar |
ESIL-PFCHICAGO 2, LLC | Madison Energy Holdings LLC | Chicago, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Oct 2020 | Dec 2023 | Solar |
Emerald Grove | Luminant Generation Company LLC | Crane, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 277.8 GWh | Feb 2023 | Mar 2025 | Solar |
Exelon Solar Chicago | Luminace Solar Chicago, LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 12.0 GWh | Nov 2009 | Mar 2025 | Solar |
Elgin Energy Center LLC | Lincoln Operating Services, LLC | Elgin, IL | PJM Interconnection, LLC (PJM) | 216.5 GWh | Aug 2002 | Nov 2023 | Natural Gas |
Summary of Power Plants By State
Figures are based on March 2025 generation numbers.State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,399.45 GWh |
Alaska | # 48 | 137 | 460.30 GWh |
Arizona | # 16 | 167 | 7,756.35 GWh |
Arkansas | # 29 | 79 | 4,503.48 GWh |
California | # 5 | 1,565 | 15,306.94 GWh |
Colorado | # 30 | 257 | 4,337.74 GWh |
Connecticut | # 31 | 152 | 3,831.37 GWh |
Delaware | # 50 | 30 | 183.34 GWh |
District of Columbia | # 51 | 12 | 15.27 GWh |
Florida | # 3 | 305 | 18,686.61 GWh |
Georgia | # 9 | 239 | 9,979.52 GWh |
Hawaii | # 46 | 67 | 749.10 GWh |
Idaho | # 43 | 126 | 1,488.21 GWh |
Illinois | # 4 | 332 | 15,592.21 GWh |
Indiana | # 12 | 201 | 8,849.97 GWh |
Iowa | # 20 | 279 | 6,323.45 GWh |
Kansas | # 25 | 157 | 5,176.23 GWh |
Kentucky | # 24 | 56 | 5,180.56 GWh |
Louisiana | # 18 | 81 | 6,708.43 GWh |
Maine | # 45 | 157 | 1,313.29 GWh |
Maryland | # 39 | 179 | 2,427.73 GWh |
Massachusetts | # 42 | 597 | 1,608.56 GWh |
Michigan | # 10 | 263 | 9,898.87 GWh |
Minnesota | # 26 | 736 | 5,082.27 GWh |
Mississippi | # 19 | 53 | 6,374.07 GWh |
Missouri | # 21 | 116 | 5,776.95 GWh |
State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Montana | # 40 | 67 | 2,309.70 GWh |
Nebraska | # 37 | 117 | 3,008.88 GWh |
Nevada | # 34 | 109 | 3,381.98 GWh |
New Hampshire | # 44 | 56 | 1,374.49 GWh |
New Jersey | # 28 | 371 | 4,514.07 GWh |
New Mexico | # 35 | 138 | 3,378.20 GWh |
New York | # 8 | 818 | 10,278.94 GWh |
North Carolina | # 11 | 877 | 9,080.20 GWh |
North Dakota | # 33 | 57 | 3,690.67 GWh |
Ohio | # 6 | 190 | 11,252.37 GWh |
Oklahoma | # 17 | 129 | 6,972.70 GWh |
Oregon | # 22 | 254 | 5,543.74 GWh |
Pennsylvania | # 2 | 237 | 19,658.43 GWh |
Rhode Island | # 47 | 94 | 622.24 GWh |
South Carolina | # 14 | 194 | 8,606.12 GWh |
South Dakota | # 41 | 52 | 1,945.10 GWh |
Tennessee | # 23 | 85 | 5,241.09 GWh |
Texas | # 1 | 818 | 43,194.33 GWh |
Utah | # 36 | 114 | 3,056.84 GWh |
Vermont | # 49 | 112 | 230.44 GWh |
Virginia | # 15 | 214 | 8,465.83 GWh |
Washington | # 13 | 127 | 8,662.62 GWh |
West Virginia | # 38 | 36 | 2,977.95 GWh |
Wisconsin | # 27 | 222 | 4,571.79 GWh |
Wyoming | # 32 | 69 | 3,817.24 GWh |