Elk Mound (PV)
2920 County Rd M, Elk Mound, WI 54739Plant Summary Information
Elk Mound (PV) is ranked #98 out of 112 solar farms in Wisconsin in terms of total annual net electricity generation.
Elk Mound (PV) generated 643.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Elk Mound (PV) |
|---|---|
| Utility Name | OneEnergy, Inc. |
| Location | Chippewa County, WI |
| Initial Operation Date | September 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 653.0 MWh |
| Annual Consumption | 2.2 k MMBtu |
| Ranked #12,157 out of 13,081 Power Plants Nationwide | |
| Ranked #6,817 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #229 out of 260 Wisconsin Power Plants | |
| Ranked #98 out of 112 Wisconsin Solar Power Plants | |
| Fuel Types | Solar |
Map of Elk Mound (PV)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Elk Mound (PV).
Monthly Net Generation for Elk Mound (PV)
Monthly Plant Fuel Consumption for Elk Mound (PV)
Elk Mound (PV) Details
| Summary Information | |
|---|---|
| Plant Name | Elk Mound (PV) (69488) |
| Plant Address | 2920 County Rd M, Elk Mound, WI 54739 |
| Utility | OneEnergy, Inc. (66783) |
| Latitude, Longitude | 44.90157, -91.61363 |
| Generation Dates on File | Sep 2025 to Dec 2025 |
| Initial Operation Date | September 2025 |
| Annual Generation | 653.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 25-744-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Dunn County Electric Coop (5417) WI |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator ELKMO Details Operating September 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Elk Mound (PV) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6807 | Brentwood Solar | Brentwood, NY | 687.0 MWh |
| #6808 | Washington Solar II (SC) | Mullins, SC | 685.0 MWh |
| #6809 | MLH 3 | Gainesville, FL | 683.0 MWh |
| #6810 | WC Landfill Energy LLC | Oxford, NJ | 683.0 MWh |
| #6811 | Renewable Energy Center at BJH | St Louis, MO | 677.0 MWh |
| #6812 | Johnson Co. Solar RES | Trafalgar, IN | 674.0 MWh |
| #6813 | Daytona International Speedway Solar | Daytona Beach, FL | 672.0 MWh |
| #6814 | City of Clarksville | Clarksville, AR | 663.0 MWh |
| #6815 | CCMUA | Camden, NJ | 658.0 MWh |
| #6816 | Wild Horse | Ellensburg, WA | 603.3 GWh |
| #6818 | Arlington Microgrid | Arlington, WA | 601.0 MWh |
| #6819 | FIU Solar | Miami, FL | 648.0 MWh |
| #6820 | MLH 2 | Gainesville, FL | 644.0 MWh |
| #6821 | Fort Polk (fka Johnson) - Chaffee East | Fort Polk North, LA | 644.0 MWh |
| #6822 | Spring Brook Solar WI, LLC | Whitewater, WI | 630.0 MWh |
| #6823 | Lakewood Cheddar School | Lakewood, NJ | 629.0 MWh |
| #6824 | Boyd Soccerplex | Boyds, MD | 627.0 MWh |
| #6825 | 1 Commercial | Sharon, MA | 622.0 MWh |
| #6826 | Highland Park Borough Solar | Highland Park, NJ | 550.0 MWh |
| #6827 | Community Foodbank of NJ | Hillside, NJ | 621.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Elk Mound (PV).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barron Solar Array | Barron, WI | 5.8 GWh | 35.7 mi |
| Bridge Creek | Augusta, WI | 258.0 MWh | 25.5 mi |
| Cedar Falls (WI) | Menomonie, WI | 30.9 GWh | 13.7 mi |
| Chippewa Falls | Chippewa Falls, WI | 56.1 GWh | 11.2 mi |
| Cornell | Chippewa Falls, WI | 69.9 GWh | 28.7 mi |
| Dells | Eau Claire, WI | 36.9 GWh | 7.1 mi |
| Downsville DPC Solar | Menomonee, WI | 1.7 GWh | 14.6 mi |
| Elk Mound | Elk Mound, WI | 466.0 MWh | 2.2 mi |
| Hay River (Dunn 1) | Boyceville, WI | 2.7 GWh | 20.3 mi |
| Holcombe | Holcombe, WI | 81.0 GWh | 32.5 mi |
| Jim Falls | Jim Falls, WI | 105.3 GWh | 19.5 mi |
| Lafayette DPC Solar | Chippewa Falls, WI | 1.6 GWh | 12.8 mi |
| Lake Hallie | Chippewa Falls, WI | 1.0 MWh | 11.3 mi |
| Menomonie | Menomonie, WI | 22.7 GWh | 15.5 mi |
| New Auburn DPC Solar | New Auburn, WI | 4.5 GWh | 23 mi |
| Next Generation | Woodville, WI | 331.0 MWh | 34.3 mi |
| Walleye (Dunn 2) | Colefax, WI | 2.8 GWh | 10.5 mi |
| Wheaton | Eau Claire, WI | 17.0 GWh | 4.9 mi |
| Wissota | Chippewa Falls, WI | 118.3 GWh | 13.6 mi |
| Wolf River (Chipewa 1) | Stanley, WI | 2.6 GWh | 31.9 mi |