E B Harris Electric Generating Plant
600 County Road 41, Autaugaville, AL 36067Plant Summary Information
E B Harris Electric Generating Plant is ranked #7 out of 77 power plants in Alabama in terms of total annual net electricity generation.
E B Harris Electric Generating Plant is comprised of 6 generators and generated 1.0 TWh during the 3-month period between February 2026 to May 2026.
| Plant Name | E B Harris Electric Generating Plant |
|---|---|
| Utility Name | Southern Power Co |
| Location | Autauga County, AL |
| Initial Operation Date | June 2003 |
| Last Update | May 2026 |
| Annual Generation | 4.9 TWh |
| Annual Consumption | 37.6 M MMBtu |
| Ranked #225 out of 13,081 Power Plants Nationwide | |
| Ranked #106 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #7 out of 77 Alabama Power Plants | |
| Ranked #4 out of 36 Alabama Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of E B Harris Electric Generating Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for E B Harris Electric Generating Plant.
Monthly Net Generation for E B Harris Electric Generating Plant
Monthly Plant Fuel Consumption for E B Harris Electric Generating Plant
E B Harris Electric Generating Plant Details
| Summary Information | |
|---|---|
| Plant Name | E B Harris Electric Generating Plant (7897) |
| Plant Address | 600 County Road 41, Autaugaville, AL 36067 |
| Utility | Southern Power Co (17650) |
| Latitude, Longitude | 32.38135, -86.57437 |
| Generation Dates on File | Jun 2003 to May 2026 |
| Initial Operation Date | June 2003 |
| Annual Generation | 4.9 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Alabama River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Alabama Power Co (195) AL |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | SOUTHERN NATURAL GAS COMPANY |
| Natural Gas Storage | No |
Generator CT1A Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G103 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 182.6 MW |
| Winter Capacity | 194.9 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CT1B Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G103 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 182.6 MW |
| Winter Capacity | 194.9 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CT2A Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G104 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178.3 MW |
| Winter Capacity | 192.5 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CT2B Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G104 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178.3 MW |
| Winter Capacity | 192.5 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G103 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 282 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 293 MW |
| Winter Capacity | 293 MW |
| Minimum Load | 130 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G104 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 282 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 300 MW |
| Winter Capacity | 300 MW |
| Minimum Load | 130 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
E B Harris Electric Generating Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #96 | Fayette Energy Facility | Masontown, PA | 5.2 TWh |
| #97 | John S Rainey | Starr, SC | 5.1 TWh |
| #98 | Cane Run | Louisville, KY | 5.0 TWh |
| #99 | Red Hawk | Arlington, AZ | 5.0 TWh |
| #100 | Hamilton Liberty | Towanda, PA | 5.0 TWh |
| #101 | Pasadena Cogeneration | Pasadena, TX | 5.0 TWh |
| #102 | Rowan | Salisbury, NC | 5.0 TWh |
| #103 | Brandy Branch | Baldwin, FL | 5.0 TWh |
| #104 | Port Everglades | Ft. Lauderdale, FL | 5.0 TWh |
| #105 | Santan | Gilbert, AZ | 4.9 TWh |
| #107 | Formosa Utility Venture Ltd | Point Comfort, TX | 5.0 TWh |
| #108 | Wolf Hollow II | Granbury, TX | 4.9 TWh |
| #109 | Morgan Energy Center | Decatur, AL | 4.8 TWh |
| #110 | Potomac Energy Center, LLC | Leesburg, VA | 4.8 TWh |
| #111 | Cottonwood Energy Company LP | Deweyville, TX | 4.8 TWh |
| #112 | Dearborn Industrial Generation | Dearborn, MI | 4.9 TWh |
| #113 | Caledonia | Steens, MS | 4.7 TWh |
| #114 | CPV Valley Energy Center | Wawayanda, NY | 4.7 TWh |
| #115 | Choctaw County | French Camp, MS | 4.7 TWh |
| #116 | TalenEnergy Montour | Washingtonville, PA | 4.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding E B Harris Electric Generating Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AMEA Peaking | Sylacauga, AL | 48.5 GWh | 56.8 mi |
| Black Bear Solar 1 | Montgomery, AL | 212.1 GWh | 19.2 mi |
| Central Alabama Generating Station | Billingsley, AL | 5.3 TWh | 20.9 mi |
| E C Gaston | Wilsonville, AL | 3.5 TWh | 60 mi |
| General Electric Plastic | Burkeville, AL | 521.7 GWh | 5.7 mi |
| Hillabee Energy Center | Alexander City, AL | 2.8 TWh | 57.9 mi |
| International Paper Pine Hill Mill | Pine Hill, AL | 424.5 GWh | 60.1 mi |
| International Paper Prattville Mill | Prattville, AL | 544.3 GWh | 6.5 mi |
| International Paper Riverdale Mill | Selma, AL | 552.2 GWh | 17.6 mi |
| Jones Bluff | Selma, AL | 250.8 GWh | 12.9 mi |
| Jordan Dam | Wetumpka, AL | 313.8 GWh | 24.8 mi |
| Lay Dam | Clanton, AL | 482.4 GWh | 40.3 mi |
| Martin Dam | Dadeville, AL | 287.2 GWh | 43.8 mi |
| Millers Ferry | Camden, AL | 250.2 GWh | 52 mi |
| Mitchell Dam | Verbena, AL | 391.0 GWh | 30.3 mi |
| Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.4 TWh | 21 mi |
| Thurlow Dam | Tallassee, AL | 191.0 GWh | 41.4 mi |
| U S Alliance Coosa Pines | Coosa Pines, AL | 119.7 GWh | 66.6 mi |
| Walter Bouldin Dam | Wetumpka, AL | 398.5 GWh | 22 mi |
| Yates Dam | Tallassee, AL | 114.2 GWh | 42.1 mi |