E B Harris Electric Generating Plant
600 County Road 41, Autaugaville, AL 36067Plant Summary Information
E B Harris Electric Generating Plant is ranked #7 out of 76 power plants in Alabama in terms of total annual net electricity generation.
E B Harris Electric Generating Plant is comprised of 6 generators and generated 734.2 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | E B Harris Electric Generating Plant |
|---|---|
| Utility Name | Southern Power Co |
| Location | Autauga County, AL |
| Initial Operation Date | June 2003 |
| Last Update | Mar 2026 |
| Annual Generation | 4.7 TWh |
| Annual Consumption | 35.3 M MMBtu |
| Ranked #237 out of 12,332 Power Plants Nationwide | |
| Ranked #114 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #7 out of 76 Alabama Power Plants | |
| Ranked #4 out of 36 Alabama Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of E B Harris Electric Generating Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for E B Harris Electric Generating Plant.
Monthly Net Generation for E B Harris Electric Generating Plant
Monthly Plant Fuel Consumption for E B Harris Electric Generating Plant
E B Harris Electric Generating Plant Details
| Summary Information | |
|---|---|
| Plant Name | E B Harris Electric Generating Plant (7897) |
| Plant Address | 600 County Road 41, Autaugaville, AL 36067 |
| Utility | Southern Power Co (17650) |
| Latitude, Longitude | 32.38135, -86.57437 |
| Generation Dates on File | Jun 2003 to Mar 2026 |
| Initial Operation Date | June 2003 |
| Annual Generation | 4.7 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Alabama River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Alabama Power Co (195) AL |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | SOUTHERN NATURAL GAS COMPANY |
| Natural Gas Storage | No |
Generator CT1A Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G103 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 182.6 MW |
| Winter Capacity | 194.9 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CT1B Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G103 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 182.6 MW |
| Winter Capacity | 194.9 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CT2A Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G104 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178.3 MW |
| Winter Capacity | 192.5 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CT2B Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | G104 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178.3 MW |
| Winter Capacity | 192.5 MW |
| Minimum Load | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G103 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 282 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 293 MW |
| Winter Capacity | 293 MW |
| Minimum Load | 130 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G104 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 282 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 300 MW |
| Winter Capacity | 300 MW |
| Minimum Load | 130 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
E B Harris Electric Generating Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #104 | Fayette Energy Facility | Masontown, PA | 5.0 TWh |
| #105 | Pasadena Cogeneration | Pasadena, TX | 5.0 TWh |
| #106 | Santan | Gilbert, AZ | 4.9 TWh |
| #107 | Caledonia | Steens, MS | 4.9 TWh |
| #108 | Formosa Utility Venture Ltd | Point Comfort, TX | 5.0 TWh |
| #109 | CPV Towantic Energy Center | Oxford, CT | 4.9 TWh |
| #110 | Rio Nogales Power Project | Seguin, TX | 4.8 TWh |
| #111 | John S Rainey | Starr, SC | 4.8 TWh |
| #112 | Rowan | Salisbury, NC | 4.8 TWh |
| #113 | Port Everglades | Ft. Lauderdale, FL | 4.8 TWh |
| #115 | CPV Valley Energy Center | Wawayanda, NY | 4.7 TWh |
| #116 | Oneta Energy Center | Broken Arrow, OK | 4.7 TWh |
| #117 | PSEG Linden Generating Station | Linden, NJ | 4.7 TWh |
| #118 | St. Charles Power Station (LA) | La Place, LA | 4.6 TWh |
| #119 | Potomac Energy Center, LLC | Leesburg, VA | 4.6 TWh |
| #120 | Morgan Energy Center | Decatur, AL | 4.5 TWh |
| #121 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 4.5 TWh |
| #122 | CPV St Charles Energy Center | Waldorf, MD | 4.5 TWh |
| #123 | Lower Mount Bethel Energy | Bangor, PA | 4.5 TWh |
| #124 | Keys Energy Center | Brandywine, MD | 4.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding E B Harris Electric Generating Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AMEA Peaking | Sylacauga, AL | 35.2 GWh | 56.8 mi |
| Black Bear Solar 1 | Montgomery, AL | 213.5 GWh | 19.2 mi |
| Central Alabama Generating Station | Billingsley, AL | 5.1 TWh | 20.9 mi |
| E C Gaston | Wilsonville, AL | 3.6 TWh | 60 mi |
| General Electric Plastic | Burkeville, AL | 602.0 GWh | 5.7 mi |
| Hillabee Energy Center | Alexander City, AL | 2.9 TWh | 57.9 mi |
| International Paper Pine Hill Mill | Pine Hill, AL | 475.7 GWh | 60.1 mi |
| International Paper Prattville Mill | Prattville, AL | 555.3 GWh | 6.5 mi |
| International Paper Riverdale Mill | Selma, AL | 562.2 GWh | 17.6 mi |
| Jones Bluff | Selma, AL | 243.7 GWh | 12.9 mi |
| Jordan Dam | Wetumpka, AL | 270.7 GWh | 24.8 mi |
| Lay Dam | Clanton, AL | 454.4 GWh | 40.3 mi |
| Martin Dam | Dadeville, AL | 305.9 GWh | 43.8 mi |
| Millers Ferry | Camden, AL | 272.7 GWh | 52 mi |
| Mitchell Dam | Verbena, AL | 355.5 GWh | 30.3 mi |
| Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.4 TWh | 21 mi |
| Thurlow Dam | Tallassee, AL | 211.8 GWh | 41.4 mi |
| U S Alliance Coosa Pines | Coosa Pines, AL | 141.9 GWh | 66.6 mi |
| Walter Bouldin Dam | Wetumpka, AL | 450.3 GWh | 22 mi |
| Yates Dam | Tallassee, AL | 96.5 GWh | 42.1 mi |