Electric Avenue Facility
500 Electric Avenue, Culpeper, VA 22701Plant Summary Information
Electric Avenue Facility is ranked #34 out of 58 distillate fuel oil power plants in Virginia in terms of total annual net electricity generation.
Electric Avenue Facility is comprised of 4 generators and generated 48.7 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Electric Avenue Facility |
|---|---|
| Utility Name | Town of Culpeper- (VA) |
| Location | Culpeper County, VA |
| Initial Operation Date | February 1997 |
| Last Update | Dec 2024 |
| Annual Generation | 443.0 MWh |
| Annual Consumption | 5.7 k MMBtu |
| Ranked #11,532 out of 12,332 Power Plants Nationwide | |
| Ranked #554 out of 1,206 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #204 out of 227 Virginia Power Plants | |
| Ranked #34 out of 58 Virginia Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Electric Avenue Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Electric Avenue Facility.
Monthly Net Generation for Electric Avenue Facility
Monthly Plant Fuel Consumption for Electric Avenue Facility
Electric Avenue Facility Details
| Summary Information | |
|---|---|
| Plant Name | Electric Avenue Facility (56367) |
| Plant Address | 500 Electric Avenue, Culpeper, VA 22701 |
| Utility | Town of Culpeper- (VA) (4619) |
| Latitude, Longitude | 38.28, -77.59 |
| Generation Dates on File | Jan 2007 to Dec 2024 |
| Initial Operation Date | February 1997 |
| Annual Generation | 443.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Town of Culpeper- (VA) (4619) VA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 4 Details Operating February 1997
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1997 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 1 Details Operating December 2004
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating December 2004
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating December 2004
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Minimum Load | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2004 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Electric Avenue Facility Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #544 | Central Power Plant | Cranston, RI | 18.6 GWh |
| #545 | Forked River | Forked River, NJ | 3.8 GWh |
| #546 | Bridge Street 1 & 2 | Groton, CT | 458.0 MWh |
| #547 | Univ of Massachusetts Medical Center | Worcester, MA | 68.7 GWh |
| #548 | Marshall (NC) | Terrell, NC | 7.1 TWh |
| #549 | Petersburg | Petersburg, AK | 13.0 GWh |
| #550 | Pretlow | Franklin, VA | 448.0 MWh |
| #551 | Indianola | Indianola, IA | 446.0 MWh |
| #552 | Water Treatment 1 & 2 | Groton, CT | 445.0 MWh |
| #553 | Colstrip Energy LP | Colstrip, MT | 287.5 GWh |
| #555 | Bridgewater Power LP | Bridgewater, NH | 93.0 GWh |
| #556 | Lost Nation | Groveton, NH | 422.0 MWh |
| #557 | Gary Court 1 & 2 | Groton, CT | 422.0 MWh |
| #558 | Falls City | Falls City, NE | 456.0 MWh |
| #559 | Ames GT | Ames, IA | 420.0 MWh |
| #560 | Dominion/Lo Mar | Manassas, VA | 418.0 MWh |
| #561 | New Hampton | New Hampton, IA | 676.0 MWh |
| #562 | Godwin Drive Plant | Manassas, VA | 416.0 MWh |
| #563 | Sam Rayburn | Nursery, TX | 194.0 GWh |
| #564 | Bluegrass Generating Station | LaGrange, KY | 112.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Electric Avenue Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Stafford | Stafford, VA | 1.7 GWh | 12 mi |
| Apple Grove Solar, LLC | Mineral, VA | 30.1 GWh | 29 mi |
| Desper Solar | Louisa, VA | 129.6 GWh | 30.7 mi |
| Energix Aditya, LLC | Mineral, VA | 20.4 GWh | 26.8 mi |
| Energix Nokesville, LLC | Nokesville, VA | 39.6 GWh | 27.1 mi |
| Gateway Gen | Manassas, VA | 251.0 MWh | 31.1 mi |
| Highlander Solar Energy Station 1 | Spotsylvania, VA | 284.8 GWh | 10.9 mi |
| Ladysmith | Woodford, VA | 988.9 GWh | 14.9 mi |
| Madison Solar (VA) | Locust Grove, VA | 119.7 GWh | 13.6 mi |
| Marsh Run Generation Facility | Remington, VA | 390.8 GWh | 19.7 mi |
| North Anna | Mineral, VA | 15.7 TWh | 18.7 mi |
| North Stafford HS | Stafford, VA | 412.0 MWh | 14.9 mi |
| Pleinmont Solar 1 | Spotsylvania, VA | 139.6 GWh | 10.9 mi |
| Pleinmont Solar 2 | Spotsylvania, VA | 432.3 GWh | 10.9 mi |
| Possum Point | Dumfries, VA | 2.5 TWh | 24.4 mi |
| Remington | Remington, VA | 862.4 GWh | 20.7 mi |
| Remington Solar Facility | Remington, VA | 32.8 GWh | 21.1 mi |
| Richmond Spider Solar | Spotsylvania, VA | 37.3 GWh | 10.9 mi |
| Waste Management King George LFGTE | King George, VA | 75.4 GWh | 15.3 mi |
| Whitehouse Solar Farm | Louisa, VA | 34.3 GWh | 27.3 mi |