Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| MM Albany Energy | MM Albany Energy LLC | Albany, NY | New York Independent System Operator (NYIS) | 10.1 GWh | Feb 1998 | Dec 2024 | Landfill Gas |
| MM Lopez Energy | MM Lopez Energy LLC | Lake View Terrace, CA | California Independent System Operator (CISO) | 25.5 GWh | Nov 1998 | Dec 2024 | Landfill Gas |
| MM Prince William Energy | MM Prince William Energy LLC | Manassas, VA | PJM Interconnection, LLC (PJM) | 43.1 GWh | Oct 1998 | Dec 2023 | Landfill Gas |
| MM San Diego-Miramar | MM San Diego Energy-Miramar | San Diego, CA | California Independent System Operator (CISO) | 46.1 GWh | Jun 1997 | Dec 2024 | Landfill Gas : 91.9% Other Biomass Gas : 8.1% |
| MM Taunton Energy | MM Taunton Energy LLC | Taunton, MA | ISO New England (ISNE) | 5.8 GWh | Aug 1997 | Dec 2024 | Landfill Gas |
| MM Tulare Energy | MM Tulare Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 9.7 GWh | Apr 1998 | Dec 2023 | Landfill Gas |
| MM West Covina | MM West Covina Energy LLC | West Covina, CA | California Independent System Operator (CISO) | 31.0 GWh | May 1993 | Dec 2024 | Landfill Gas : 99.8% |
| Denver Int Airport | MMA DAS Power | Denver, CO | Public Service Company of Colorado (PSCO) | 1.5 GWh | Aug 2008 | Dec 2024 | Solar |
| CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2007 | Dec 2024 | Solar |
| Bolthouse S&P and Rowen Farms Solar | MMA WBF Power LP | Palmdale, CA | California Independent System Operator (CISO) | 67.0 MWh | Oct 2008 | Apr 2024 | Solar |
| Woodbury Solar | MN CSG 2, LLC | Woodbury, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Jun 2020 | Dec 2024 | Solar |
| MN CSG 2019-16 LLC | MN CSG 2019-16 LLC | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | May 2022 | Dec 2024 | Solar |
| MN CSG 2019-38 DE LLC | MN CSG 2019-38 DE LLC | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Sherburne North Project CSG | MN Solar Community, LLC | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Jun 2018 | Dec 2024 | Solar |
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Westminster | MN8 Energy LLC | Westminster, VT | ISO New England (ISNE) | 2.8 GWh | Nov 2016 | Dec 2024 | Solar |
| County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Arthur Solar, LLC | MN8 Energy LLC | Tabor City, NC | Duke Energy Carolinas (DUK) | 10.1 GWh | Jun 2018 | Dec 2024 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Lakewood Cheddar School | MN8 Energy LLC | Lakewood, NJ | PJM Interconnection, LLC (PJM) | 676.0 MWh | Dec 2012 | Dec 2024 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Feb 2017 | Dec 2024 | Solar |
| Dignity - San Martin | MN8 Energy LLC | Las Vegas, NV | Nevada Power Company (NEVP) | 3.4 GWh | Apr 2018 | Dec 2024 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2024 | Solar |
| NorWest Energy 9 LLC | MN8 Energy LLC | Pendleton, OR | PacifiCorp West (PACW) | 10.7 GWh | Aug 2018 | Dec 2024 | Solar |
| Dry Bridge Solar (Brown University) | MN8 Energy LLC | North Kingstown, RI | ISO New England (ISNE) | 64.8 GWh | Oct 2023 | Feb 2026 | Solar |
| NorWest Energy 4, LLC | MN8 Energy LLC | Bonanza, OR | PacifiCorp West (PACW) | 9.5 GWh | Dec 2018 | Dec 2024 | Solar |
| Hanover Solar, LLC | MN8 Energy LLC | Maysville, NC | Duke Energy Carolinas (DUK) | 10.2 GWh | Mar 2018 | Dec 2024 | Solar |
| Toyota HQ Plan | MN8 Energy LLC | Plano, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| Redstone Arsenal Hybrid | MN8 Energy LLC | Huntsville, AL | Tennessee Valley Authority (TVA) | 16.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Owens Corning | MN8 Energy LLC | Gloucester Township, NJ | PJM Interconnection, LLC (PJM) | 4.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2024 | Solar |
| Church Road Solar LLC | MN8 Energy LLC | Angier, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Jul 2018 | Dec 2024 | Solar |
| County Home Solar LLC | MN8 Energy LLC | Rockingham, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Aug 2018 | Dec 2024 | Solar |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Dignity - Siena Campus | MN8 Energy LLC | Henderson, NV | Nevada Power Company (NEVP) | 2.7 GWh | Apr 2018 | Dec 2024 | Solar |
| NY8 - Branscomb Solar | MN8 Energy LLC | Schaghticoke, NY | New York Independent System Operator (NYIS) | 31.8 GWh | Nov 2021 | Dec 2024 | Solar |
| NY8 - Darby Solar | MN8 Energy LLC | Schaghticoke, NY | New York Independent System Operator (NYIS) | 32.4 GWh | May 2023 | Dec 2024 | Solar |
| NY8 - Teichos Pattersonville | MN8 Energy LLC | Pattersonville, NY | New York Independent System Operator (NYIS) | 33.7 GWh | Jan 2024 | Dec 2024 | Solar |
| NY8 - Grissom Solar | MN8 Energy LLC | Mohawk, NY | New York Independent System Operator (NYIS) | 24.4 GWh | Feb 2023 | Dec 2024 | Solar |
| NY8 - ELP Stillwater Solar | MN8 Energy LLC | Mechanicville, NY | New York Independent System Operator (NYIS) | 34.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Ripley | MN8 Energy LLC | La Plata, MD | PJM Interconnection, LLC (PJM) | 44.1 GWh | Mar 2023 | Feb 2026 | Solar |
| WMATA - S. Ave. Carport (East) (CSG) | MN8 Energy LLC | Hillcrest Heights, MD | PJM Interconnection, LLC (PJM) | 1.9 GWh | Jun 2023 | Dec 2024 | Solar |
| Dynamic Corinth (CSG) | MN8 Energy LLC | Corinth, ME | ISO New England (ISNE) | 9.3 GWh | Sep 2022 | Dec 2024 | Solar |
| Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 595.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Dynamic Madison (CSG) | MN8 Energy LLC | Madison, ME | ISO New England (ISNE) | 9.9 GWh | Jul 2022 | Dec 2024 | Solar |
| Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Aug 2018 | Dec 2024 | Solar |
| WMATA - Naylor Rd. Metro | MN8 Energy LLC | Temple Hills, MD | PJM Interconnection, LLC (PJM) | 2.7 GWh | Oct 2023 | Dec 2024 | Solar |
| Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Chambers 4 - Redland LGB4 | MN8 Energy LLC | Redlands, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2019 | Dec 2024 | Solar |
| WMATA - Anacostia CSG | MN8 Energy LLC | Washington, DC | PJM Interconnection, LLC (PJM) | 1.6 GWh | Aug 2023 | Dec 2024 | Solar |
| NY8 - Janis Solar | MN8 Energy LLC | Willet, NY | New York Independent System Operator (NYIS) | 32.2 GWh | Feb 2023 | Dec 2024 | Solar |
| NY8 - Regan Solar | MN8 Energy LLC | Mohawk, NY | New York Independent System Operator (NYIS) | 31.3 GWh | Nov 2022 | Dec 2024 | Solar |
| NY8 - Puckett Solar | MN8 Energy LLC | Chenango Forks, NY | New York Independent System Operator (NYIS) | 31.5 GWh | Sep 2022 | Dec 2024 | Solar |
| Broadway 3 - Tucson Phase I | MN8 Energy LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 1.6 GWh | Feb 2011 | Dec 2024 | Solar |
| Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 901.0 MWh | Sep 2009 | Dec 2024 | Solar |
| Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2018 | Dec 2024 | Solar |
| Chambers 3 - Lewis County | MN8 Energy LLC | Lowville, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Apr 2018 | Dec 2024 | Solar |
| Chambers 3 - Erie County Alden | MN8 Energy LLC | Alden, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Apr 2018 | Dec 2024 | Solar |
| Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2019 | Dec 2024 | Solar |
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
| LTMUA | MN8 Energy LLC | Villas, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Feb 2012 | Dec 2024 | Solar |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Thermo Fisher | MN8 Energy LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jan 2013 | Dec 2024 | Solar |
| Bluebird Solar LLC | MN8 Energy LLC | Leesburg, KY | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) | 78.3 GWh | - | Feb 2026 | Solar |
| Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 713.1 GWh | Oct 2021 | Feb 2026 | Solar |
| Ben Moreell Solar Farm | MN8 Energy LLC | Tinton Falls, NJ | PJM Interconnection, LLC (PJM) | 36.2 GWh | Dec 2019 | Dec 2024 | Solar |
| Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2020 | Dec 2024 | Solar |
| California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 4.6 GWh | Jun 2018 | Dec 2024 | Solar |
| Spruce - WCMD - Rubble II | MN8 Energy LLC | Williamsport, MD | PJM Interconnection, LLC (PJM) | 2.7 GWh | Oct 2015 | Dec 2024 | Solar |
| Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 64.4 GWh | Mar 2020 | Feb 2026 | Solar |
| Spruce - WCMD - Rubble I | MN8 Energy LLC | Williamsport, MD | PJM Interconnection, LLC (PJM) | 2.9 GWh | Aug 2015 | Dec 2024 | Solar |
| Spruce - WCMD - Creek | MN8 Energy LLC | Hagerstown, MD | PJM Interconnection, LLC (PJM) | 2.1 GWh | Apr 2015 | Dec 2024 | Solar |
| Spruce - WCMD - Resh I | MN8 Energy LLC | Hagerstown, MD | PJM Interconnection, LLC (PJM) | 2.8 GWh | Feb 2016 | Dec 2024 | Solar |
| Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.6 GWh | Jul 2020 | Dec 2024 | Solar |
| Spring Lane | MN8 Energy LLC | Ligonier, PA | PJM Interconnection, LLC (PJM) | 667.0 MWh | Nov 2024 | Dec 2024 | Solar |
| RIC - Hanover (CSG) | MN8 Energy LLC | Silver Creek, NY | New York Independent System Operator (NYIS) | 8.7 GWh | Jul 2023 | Dec 2024 | Solar |
| Summit - Cicero | MN8 Energy LLC | Brewerton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jan 2024 | Dec 2024 | Solar |
| Summit - Oswego | MN8 Energy LLC | Oswego, NY | New York Independent System Operator (NYIS) | 4.0 GWh | May 2023 | Dec 2024 | Solar |
| Summit - Lysander (CSG) | MN8 Energy LLC | Lysander, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Jul 2023 | Dec 2024 | Solar |
| Toms River CSG | MN8 Energy LLC | Toms River, NJ | PJM Interconnection, LLC (PJM) | 6.5 GWh | Aug 2023 | Dec 2024 | Solar |
| Summit - Scriba CSG | MN8 Energy LLC | Scriba, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Aug 2023 | Dec 2024 | Solar |
| RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 23.9 GWh | Dec 2013 | Dec 2024 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.6 GWh | Jul 2016 | Dec 2024 | Solar |
| Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 11.4 GWh | Nov 2013 | Dec 2024 | Solar |
| Utah Red Hills Renewable Energy Park | MN8 Energy LLC | Parowan, UT | PacifiCorp East (PACE) | 208.6 GWh | Nov 2015 | Dec 2024 | Solar |
| RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.3 GWh | Dec 2013 | Dec 2024 | Solar |
| Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2024 | Solar |
| RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2013 | Dec 2024 | Solar |
| RE Gillespie 1 LLC | MN8 Energy LLC | Gila Bend, AZ | Arizona Public Service Company (AZPS) | 36.8 GWh | Nov 2013 | Dec 2024 | Solar |
| Berry Plastics Solar | MN8 Energy LLC | Phillipsburg, NJ | PJM Interconnection, LLC (PJM) | 14.5 GWh | Nov 2013 | Dec 2024 | Solar |
| Rockland Solar CSG | MN8 Energy LLC | Rockland, MA | ISO New England (ISNE) | 2.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2013 | Dec 2024 | Solar |
| Bryan Solar, LLC | MN8 Energy LLC | Presidio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 23.4 GWh | May 2013 | Dec 2024 | Solar |
| Picture Rocks Solar, LLC | MN8 Energy LLC | Marana, AZ | Tucson Electric Power (TEPC) | 49.8 GWh | Nov 2012 | Dec 2024 | Solar |
| Lake Pleasant WTP | MN8 Energy LLC | Peoria, AZ | Arizona Public Service Company (AZPS) | 12.9 GWh | Nov 2012 | Dec 2024 | Solar |
| Antares-GRE 314 East Lyme LLC | MN8 Energy LLC | East Lyme, CT | ISO New England (ISNE) | 4.6 GWh | May 2014 | Feb 2026 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |