Ivester Wind Farm
15087 205th St, Wellsburg, IA 50680Plant Summary Information
Ivester Wind Farm is ranked #54 out of 123 wind farms in Iowa in terms of total annual net electricity generation.
Ivester Wind Farm generated 120.3 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Ivester Wind Farm |
---|---|
Utility Name | MidAmerican Energy Co |
Location | Grundy County, IA |
Initial Operation Date | December 2018 |
Last Update | Feb 2024 |
Annual Generation | 352.8 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,741 out of 11,455 Power Plants Nationwide | |
Ranked #534 out of 1,337 Wind Power Plants Nationwide | |
Ranked #67 out of 271 Iowa Power Plants | |
Ranked #54 out of 123 Iowa Wind Power Plants | |
Fuel Types | Wind |
Map of Ivester Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ivester Wind Farm.
Monthly Net Generation for Ivester Wind Farm
Ivester Wind Farm Details
Summary Information | |
---|---|
Plant Name | Ivester Wind Farm (61911) |
Plant Address | 15087 205th St Wellsburg, IA 50680 |
Utility | MidAmerican Energy Co (12341) |
Latitude, Longitude | 42.33327, -92.94644 |
Generation Dates on File | Dec 2018 to Feb 2024 |
Initial Operation Date | December 2018 |
Annual Generation | 352.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | ITC Midwest LLC (56161) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator WT1 Details Operating December 2018
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 90.8 MW |
Summer Capacity | 90 MW |
Winter Capacity | 90 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 35 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 35 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.625-120 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Ivester Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#524 | Bennington Wind | Minonk, IL | 356.7 GWh |
#525 | Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 353.2 GWh |
#526 | Morning Light Wind Farm | Adair, IA | 355.9 GWh |
#527 | Milford Wind Corridor I LLC | Milford, UT | 355.7 GWh |
#528 | Voyager Wind I | Mojave, CA | 355.5 GWh |
#529 | Prairie Winds ND1 | Minot, ND | 355.4 GWh |
#530 | Wapsipinicon Wind Project | Dexter, MN | 355.0 GWh |
#531 | FPL Energy Vansycle LLC (WA) | Touchet, WA | 354.1 GWh |
#532 | Sac County Wind, LLC | Sac City, IA | 353.6 GWh |
#533 | Bison 2 Wind Energy Center | New Salem, ND | 352.9 GWh |
#535 | Bishop Hill II Wind Farm | Cambridge, IL | 350.5 GWh |
#536 | Oakfield Wind Project | City of Oakfield, ME | 350.5 GWh |
#537 | Palouse | Oakesdale, WA | 349.8 GWh |
#538 | Bison 3 Wind Energy Center | New Salem, ND | 349.5 GWh |
#539 | Turkey Track Wind Energy LLC | Blackwell, TX | 348.7 GWh |
#540 | Smoky Hills Wind Project Phase I | Lincoln, KS | 348.7 GWh |
#541 | Caprock Wind Farm | San Jon, NM | 348.4 GWh |
#542 | Post Wind Farm LP | Fluvanna, TX | 348.3 GWh |
#543 | Broken Bow Wind II, LLC | Broken Bow, NE | 346.0 GWh |
#544 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 345.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ivester Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alliant SBD 9107 JBS USA | Marshalltown, IA | 43.1 MWh | 19.3 mi |
Cedar Falls Solar Farm | Cedar Falls, IA | 2.6 GWh | 26.9 mi |
Dike City Power Plant | Dike, IA | 79.0 MWh | 18.6 mi |
Electrifarm | Waterloo, IA | 12.7 GWh | 27.8 mi |
FPL Energy Story Wind LLC | Zearing, IA | 607.3 GWh | 23 mi |
Franklin County Solar | Hampton, IA | 11.9 GWh | 29.9 mi |
Franklin County Wind Farm | Iowa Falls, IA | 322.6 GWh | 27.4 mi |
Garden Wind LLC | Zearing, IA | 408.4 GWh | 23.1 mi |
Gas Turbine (IA) | Cedar Falls, IA | 631.4 MWh | 27 mi |
Grundy Center City Light Plant | Grundy Center, IA | 494.2 MWh | 9.1 mi |
Leonardo Wind 1 LLC | Alden, IA | 13.9 GWh | 24.3 mi |
Marshalltown | Marshalltown, IA | 80.6 GWh | 20.2 mi |
Marshalltown Generating Station | Marshalltown, IA | 3.8 TWh | 20.4 mi |
State Center | State Center, IA | 132.0 MWh | 24.5 mi |
Streeter Station | Cedar Falls, IA | 8.5 GWh | 29.1 mi |
Traer Wind Project | Traer, IA | 7.4 GWh | 28.4 mi |
University of Northern Iowa | Cedar Falls, IA | 23.6 GWh | 27.8 mi |
Vienna Wind Farm | Marshalltown, IA | 614.6 GWh | 14.8 mi |
Wellsburg Wind Project | Wellsburg, IA | 575.5 GWh | 4.1 mi |
Whispering Willow Wind Farm - East | Iowa Falls, IA | 625.5 GWh | 24.4 mi |