Highland Wind Project (IA)
620 Industrial Park Rd, Primghar, IA 51245Plant Summary Information
Highland Wind Project (IA) is ranked #16 out of 1,374 wind farms nationwide in terms of total annual net electricity generation.
Highland Wind Project (IA) generated 367.6 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Highland Wind Project (IA) |
|---|---|
| Utility Name | MidAmerican Energy Co |
| Location | O'Brien County, IA |
| Initial Operation Date | June 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 1.6 TWh |
| Annual Consumption | 5.8 M MMBtu |
| Ranked #595 out of 12,613 Power Plants Nationwide | |
| Ranked #16 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #11 out of 281 Iowa Power Plants | |
| Ranked #3 out of 125 Iowa Wind Power Plants | |
| Fuel Types | Wind |
Map of Highland Wind Project (IA)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Highland Wind Project (IA).
Monthly Net Generation for Highland Wind Project (IA)
Monthly Plant Fuel Consumption for Highland Wind Project (IA)
Highland Wind Project (IA) Details
| Summary Information | |
|---|---|
| Plant Name | Highland Wind Project (IA) (58883) |
| Plant Address | 620 Industrial Park Rd, Primghar, IA 51245 |
| Utility | MidAmerican Energy Co (12341) |
| Latitude, Longitude | 43.08028, -95.65611 |
| Generation Dates on File | Jun 2015 to Dec 2025 |
| Initial Operation Date | June 2015 |
| Annual Generation | 1.6 TWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | MidAmerican Energy Co (12341) IA |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator HLWF5 Details Operating October 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 115 MW |
| Summer Capacity | 115 MW |
| Winter Capacity | 115 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 49 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 49 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Generator HLWF6 Details Operating November 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 86.8 MW |
| Summer Capacity | 85.8 MW |
| Winter Capacity | 85.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 40 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 40 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Generator HLWF7 Details Operating December 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 4.7 MW |
| Summer Capacity | 4.7 MW |
| Winter Capacity | 4.7 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 7 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 7 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Generator HLWF Details Operating June 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MEC.HIGHLAND1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC.HIGHLAND1 |
| Nameplate Capacity | 16.4 MW |
| Summer Capacity | 16.4 MW |
| Winter Capacity | 16.4 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 214 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 214 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Generator HLWF2 Details Operating July 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MEC.HIGHLAND2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC.HIGHLAND2 |
| Nameplate Capacity | 100.8 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 40 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 40 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Generator HLWF3 Details Operating August 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MEC.HIGHLAND3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC.HIGHLAND3 |
| Nameplate Capacity | 89.1 MW |
| Summer Capacity | 89.1 MW |
| Winter Capacity | 89.1 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 38 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 38 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Generator HLWF4 Details Operating September 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 89.2 MW |
| Summer Capacity | 89 MW |
| Winter Capacity | 89 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 38 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 38 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Highland Wind Project (IA) Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6 | Sagamore Wind | Rogers, NM | 2.1 TWh |
| #7 | Capricorn Ridge Wind LLC | Sterling City, TX | 2.0 TWh |
| #8 | Hale Community Wind Farm | Plainview, TX | 1.9 TWh |
| #9 | Orient Wind Farm | Orient, IA | 1.8 TWh |
| #10 | White Mesa Wind | Ozona, TX | 1.8 TWh |
| #11 | Aviator Wind | Robert Lee, TX | 1.7 TWh |
| #12 | Cheyenne Ridge Wind Farm | Cheyenne Wells, CO | 1.6 TWh |
| #13 | Rolling Hills Wind Farm | Massena, IA | 1.6 TWh |
| #14 | Young Wind | Graham, TX | 1.6 TWh |
| #15 | Maverick Creek Wind | Eden, TX | 1.6 TWh |
| #17 | Fowler Ridge Wind Farm LLC | Fowler, IN | 1.5 TWh |
| #18 | Palo Alto Wind Farm | Emmetsburg, IA | 1.5 TWh |
| #19 | Grande Prairie Wind Farm | O'Neill, NE | 1.4 TWh |
| #20 | TB Flats | Medicine Bow, WY | 1.4 TWh |
| #21 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
| #22 | North English | Montezuma, IA | 1.3 TWh |
| #23 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh |
| #24 | Beaver Creek Wind | Ogden, IA | 1.3 TWh |
| #25 | Inertia Wind Project | Haskell, TX | 1.2 TWh |
| #26 | Santa Rita East | Barnhart, TX | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Highland Wind Project (IA).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Municipal Utilities | Alta, IA | 70.0 MWh | 33.3 mi |
| Earl F Wisdom | Spencer, IA | 7.1 GWh | 20.9 mi |
| Flying Cloud Power Partners LLC | Lake Park, IA | 81.0 GWh | 27.9 mi |
| Glaciers Edge Wind Project | Cleghorn, IA | 828.4 GWh | 16.2 mi |
| Lake Park | Lake Park, IA | 46.0 MWh | 29.6 mi |
| Lost Lakes Wind Farm LLC | Lake Park, IA | 243.7 GWh | 24.8 mi |
| Milford | Milford, IA | 283.0 MWh | 30.7 mi |
| O'Brien Wind | Primghar, IA | 875.9 GWh | 8.5 mi |
| Osceola Windpower II | Harris, IA | 200.3 GWh | 27 mi |
| Osceola Windpower LLC | Harris, IA | 393.8 GWh | 27 mi |
| Otter Creek Ethanol Poet - Ashton | Ashton, IA | 44.8 GWh | 15.5 mi |
| Plymouth Wind | Remsen, IA | 799.6 GWh | 21.8 mi |
| Sibley No Two | Sibley, IA | 38.0 MWh | 22.4 mi |
| Sibley One | Sibley, IA | 42.0 MWh | 22.7 mi |
| Spencer Gas Turbine | Spencer, IA | 651.0 MWh | 26.2 mi |
| Storm Lake 1 | Alta, IA | 84.7 GWh | 29.9 mi |
| Storm Lake II | Alta, IA | 114.2 GWh | 20.8 mi |
| Sunset Breeze LLC | Rushmore, MN | 2.0 GWh | 35.2 mi |
| Upland Prairie | Spencer, IA | 1.1 TWh | 17.8 mi |
| Wolf Wind Enterprises LLC | Rushmore, MN | 2.0 GWh | 35.1 mi |