Intrepid
506 West 2nd, Schaller, IA 51053Plant Summary Information
Intrepid is ranked #47 out of 279 power plants in Iowa in terms of total annual net electricity generation.
Intrepid generated 145.8 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Intrepid |
|---|---|
| Utility Name | MidAmerican Energy Co |
| Location | Buena Vista County, IA |
| Initial Operation Date | December 2004 |
| Last Update | Dec 2024 |
| Annual Generation | 549.4 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,239 out of 12,529 Power Plants Nationwide | |
| Ranked #324 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #47 out of 279 Iowa Power Plants | |
| Ranked #35 out of 123 Iowa Wind Power Plants | |
| Fuel Types | Wind |
Map of Intrepid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Intrepid.
Monthly Net Generation for Intrepid
Intrepid Details
| Summary Information | |
|---|---|
| Plant Name | Intrepid (56251) |
| Plant Address | 506 West 2nd, Schaller, IA 51053 |
| Utility | MidAmerican Energy Co (12341) |
| Latitude, Longitude | 42.5539, -95.3283 |
| Generation Dates on File | Jan 2004 to Dec 2024 |
| Initial Operation Date | December 2004 |
| Annual Generation | 549.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | MidAmerican Energy Co (12341) IA |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
Generator INWF Details Operating December 2004
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MEC.CLIPR1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC.CLIPR1 |
| Nameplate Capacity | 160.5 MW |
| Summer Capacity | 160.5 MW |
| Winter Capacity | 160.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 107 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 107 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5-82.5 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 213 |
Generator INWF2 Details Operating December 2005
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 15 MW |
| Summer Capacity | 15 MW |
| Winter Capacity | 15 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2005 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 15 |
| Planned New Prime Mover | WT |
| Planned Energy Source | WND |
| Planned New Nameplate Capacity | 15 MW |
| Planned Repower | January 2025 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 15 |
|---|---|
| Predominant Turbine Manufacturer | Mitsubishi |
| Predominant Turbine Model Number | MWT-1000A |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 197 |
Intrepid Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| We couldn't locate any owners for this plant | |||
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #314 | Carroll Wind Farm | Carroll, IA | 562.6 GWh |
| #315 | Alta Farms II Wind Project, LLC | Clinton, IL | 561.1 GWh |
| #316 | South Hurlburt Wind LLC | Arlington, OR | 557.6 GWh |
| #317 | Northern Colorado Wind LLC | Peetz, CO | 557.5 GWh |
| #318 | Babbitt Ranch Energy Center | Flagstaff, AZ | 555.7 GWh |
| #319 | Adair Wind Farm | Adair, IA | 554.8 GWh |
| #320 | Mesquite Creek Wind | Lamesa, TX | 554.6 GWh |
| #321 | Oliver Wind IV | Hannover, ND | 552.9 GWh |
| #322 | Logan Wind Energy | Peetz, CO | 552.9 GWh |
| #323 | NaturEner Rim Rock Energy | Kevin, MT | 550.4 GWh |
| #325 | Osage Wind, LLC | Burbank, OK | 549.0 GWh |
| #326 | King Creek Wind Farm 1, LLC | Throckmorton, TX | 546.5 GWh |
| #327 | Scioto Ridge Wind Farm | Belle Center, OH | 545.0 GWh |
| #328 | Manzana Wind LLC | Rosamond, CA | 543.7 GWh |
| #329 | Blue Canyon Windpower II | Carnegie, OK | 543.1 GWh |
| #330 | Gopher Creek Wind Farm | Fluvanna, TX | 542.8 GWh |
| #331 | Blackjack Creek Wind Farm | Skidmore, TX | 542.0 GWh |
| #332 | Bruennings Breeze Wind Farm | Raymondville, TX | 541.3 GWh |
| #333 | Astra Wind Farm | Happy, TX | 538.9 GWh |
| #334 | Old Settler Wind | Floydada, TX | 537.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Intrepid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Municipal Utilities | Alta, IA | 70.0 MWh | 8.4 mi |
| Carroll Wind Farm | Carroll, IA | 562.6 GWh | 33.9 mi |
| Crosswind Energy Project | Ruthven, IA | 55.3 GWh | 39.8 mi |
| Glaciers Edge Wind Project | Cleghorn, IA | 850.2 GWh | 31 mi |
| Highland Wind Project (IA) | Primghar, IA | 1.7 TWh | 40 mi |
| Ida Grove II | Ida Grove, IA | 720.7 GWh | 17 mi |
| Ida Grove Wind | Ida Grove, IA | 1.1 TWh | 14.5 mi |
| Laurens | Laurens, IA | 257.0 MWh | 31.7 mi |
| New Harvest Wind Project LLC | Schleswig, IA | 287.5 GWh | 27.8 mi |
| Plymouth Wind | Remsen, IA | 795.3 GWh | 37 mi |
| Pocahontas Prairie Wind Farm | Pomeroy, IA | 382.0 GWh | 34.1 mi |
| Pomeroy Wind Farm | Fonda, IA | 991.2 GWh | 29.7 mi |
| Richland (IA) | Odebolt, IA | 499.0 GWh | 14.2 mi |
| Sac County Wind, LLC | Sac City, IA | 320.9 GWh | 19.3 mi |
| Spencer Gas Turbine | Spencer, IA | 651.0 MWh | 41.9 mi |
| Storm Lake 1 | Alta, IA | 84.7 GWh | 10 mi |
| Storm Lake II | Alta, IA | 114.2 GWh | 20.3 mi |
| Victory Wind Farm | Westside, IA | 378.4 GWh | 31.9 mi |
| West Diesel Generation Unit | Pocahontas, IA | 23.0 MWh | 35.9 mi |
| West Receiving | Denison, IA | 11.0 MWh | 36.8 mi |