Wellsburg Wind Project is ranked #40 out of 123 wind farms in Iowa in terms of total annual net electricity generation.

Wellsburg Wind Project generated 132.2 GWh during the 3-month period between September 2024 to December 2024.

Plant NameWellsburg Wind Project
Utility NameMidAmerican Energy Co
LocationGrundy County, IA
Initial Operation DateDecember 2014
Last Update Dec 2024
Annual Generation 468.7 GWh
Annual Consumption 1.7 M MMBtu
Ranked #1,374 out of 12,312 Power Plants Nationwide
Ranked #388 out of 1,355 Wind Power Plants Nationwide
Ranked #52 out of 278 Iowa Power Plants
Ranked #40 out of 123 Iowa Wind Power Plants
Fuel Types Wind

Map of Wellsburg Wind Project

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wellsburg Wind Project.

Create Your Account Today

Monthly Net Generation for Wellsburg Wind Project

80k80k60k60k40k40k20k20k0020152015201620162017201720182018201920192020202020212021202220222023202320242024
Download SVG
Download PNG
Download CSV

Wellsburg Wind Project Details

Summary Information
Plant NameWellsburg Wind Project (58886)
Plant Address15087 205th St., Wellsburg, IA 50680
UtilityMidAmerican Energy Co (12341)
Latitude, Longitude42.39083, -92.96667
Generation Dates on FileDec 2014 to Dec 2024
Initial Operation DateDecember 2014
Annual Generation 468.7 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerITC Midwest LLC (56161)
Grid Voltage 161.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name MIDAMERICAN ENERGY COMPANY

Generator WBWF Details Operating December 2014

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
RTO ISO LMP Node DesignationMEC.WELLSBURG
RTO ISO Location Designation For Reporting Wholesale Sales DataMEC.WELLSBURG
Nameplate Capacity140.8 MW
Summer Capacity138.6 MW
Winter Capacity138.6 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2014
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWind
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys60
Planned New Prime MoverWT
Planned Energy SourceWND
Planned New Nameplate Capacity143 MW
Planned RepowerNovember 2025
Other Planned ModificationsNo
Multiple FuelsNo
Turbine Details
Number Of Turbines60
Predominant Turbine ManufacturerSiemens
Predominant Turbine Model NumberSWT-2.3-108
Design Wind Speed16.8 MPH
Wind Quality Class3 - Low Wind
Turbine Hub Height Feet262.4

Wellsburg Wind Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#378Top of the World Windpower ProjectGlenrock, WY478.9 GWh
#379Babbitt Ranch Energy CenterFlagstaff, AZ478.8 GWh
#380NedPower Mount StormMount Storm, WV476.8 GWh
#381Clear Creek WindMaryville, MO476.7 GWh
#382Flat Ridge 3Zenda, KS474.8 GWh
#383Adams WindLenox, IA474.5 GWh
#384Marble River Wind FarmChurubusco, NY472.4 GWh
#385Sweetwater Wind 3 LLCSweetwater, TX470.0 GWh
#386Rockhaven Wind Project, LLCHennepin, OK469.4 GWh
#387Limon Wind IILimon, CO468.7 GWh
#389Papalote Creek II LLCTaft, TX468.2 GWh
#390La Chalupa, LLCRio Hondo, TX468.1 GWh
#391RockspringsDel Rio, TX468.1 GWh
#392Cactus Flats Wind Energy ProjectEden, TX465.7 GWh
#393Ensign Wind LLCMontezuma, KS464.2 GWh
#394Laurel Wind FarmLaurel, IA463.1 GWh
#395Bobcat Bluff Wind Project LLCArcher, TX462.3 GWh
#396Otter Creek Wind Farm LLCRansom, IL461.6 GWh
#397Buffalo Ridge WindLake Benton, MN461.5 GWh
#398Gunsight Mountain Wind Energy LLCBig Spring, TX460.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Wellsburg Wind Project.

Plant NamePlant LocationAnnual GenerationDistance
Alliant SBD 9107 JBS USAMarshalltown, IA35.3 MWh23.4 mi
Cedar Falls Solar FarmCedar Falls, IA2.4 GWh26.7 mi
Dike City Power PlantDike, IA50.0 MWh18 mi
ElectrifarmWaterloo, IA11.0 GWh28.1 mi
FPL Energy Story Wind LLCZearing, IA544.1 GWh25.2 mi
Franklin County SolarHampton, IA11.7 GWh25.9 mi
Franklin County Wind FarmIowa Falls, IA190.7 GWh24 mi
Garden Wind LLCZearing, IA351.0 GWh23.8 mi
Gas Turbine (IA)Cedar Falls, IA690.0 MWh26.4 mi
Ivester Wind FarmWellsburg, IA340.1 GWh4.1 mi
Leonardo Wind 1 LLCAlden, IA10.0 GWh21.8 mi
MarshalltownMarshalltown, IA79.0 GWh24.4 mi
Marshalltown Generating StationMarshalltown, IA3.4 TWh24.5 mi
State CenterState Center, IA75.0 MWh27.7 mi
Streeter StationCedar Falls, IA7.8 GWh28.5 mi
Traer Wind ProjectTraer, IA5.8 GWh31.1 mi
University of Northern IowaCedar Falls, IA19.6 GWh27.2 mi
Vienna Wind FarmMarshalltown, IA397.6 GWh18.7 mi
Waterloo LundquistWaterloo, IA38.0 MWh32.7 mi
Whispering Willow Wind Farm - EastIowa Falls, IA425.2 GWh20.6 mi