Chickasaw Wind Farm is ranked #39 out of 281 power plants in Iowa in terms of total annual net electricity generation.
Chickasaw Wind Farm generated 170.7 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Chickasaw Wind Farm |
|---|---|
| Utility Name | MidAmerican Energy Co |
| Location | Chickasaw County, IA |
| Initial Operation Date | December 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 624.5 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,106 out of 12,637 Power Plants Nationwide | |
| Ranked #252 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #39 out of 281 Iowa Power Plants | |
| Ranked #27 out of 125 Iowa Wind Power Plants | |
| Fuel Types | Wind |
Map of Chickasaw Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chickasaw Wind Farm.
Monthly Net Generation for Chickasaw Wind Farm
Monthly Plant Fuel Consumption for Chickasaw Wind Farm
Chickasaw Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Chickasaw Wind Farm (66668) |
| Plant Address | 2162 150th St, New Hampton, IA 50659 |
| Utility | MidAmerican Energy Co (12341) |
| Latitude, Longitude | 43.14014, -92.32443 |
| Generation Dates on File | Dec 2023 to Feb 2026 |
| Initial Operation Date | December 2023 |
| Annual Generation | 624.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | MidAmerican Energy Co (12341) IA |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator CKWF Details Operating December 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MEC.CHICKASAW |
| Nameplate Capacity | 202.4 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Minimum Load | 0.1 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 66 |
| Turbine Details | |
| Number Of Turbines | 66 |
|---|---|
| Predominant Turbine Manufacturer | Siemens Gamesa |
| Predominant Turbine Model Number | SG 2.9-129 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 263 |
Chickasaw Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #242 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 642.7 GWh |
| #243 | Heart of Texas Wind Project | Brady, TX | 640.5 GWh |
| #244 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 638.4 GWh |
| #245 | Goodwell Wind Project LLC | Goodwell, OK | 637.5 GWh |
| #246 | Ledyard Windpower, LLC | Lakota, IA | 636.8 GWh |
| #247 | Meadow Lake Wind Farm VI LLC | Remington, IN | 635.1 GWh |
| #248 | Brady Wind Energy Center | Dickinson, ND | 632.3 GWh |
| #249 | Horizon Hill Wind Project | Crescent, OK | 631.6 GWh |
| #250 | Sweetwater Wind 4 LLC | Roscoe, TX | 627.7 GWh |
| #251 | Glacier Sands Wind Power, LLC | Mason City, IL | 626.5 GWh |
| #253 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
| #254 | Aragonne Wind LLC | Santa Rosa, NM | 622.8 GWh |
| #255 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 620.5 GWh |
| #256 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
| #257 | Kelly Creek Wind Project | Cabery, IL | 617.9 GWh |
| #258 | Headwaters Wind Farm LLC | Winchester, IN | 617.8 GWh |
| #259 | Brady II Wind Energy Center | Dickinson, ND | 617.6 GWh |
| #260 | Cimarron Bend III | Minneola, KS | 615.8 GWh |
| #261 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
| #262 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 614.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chickasaw Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alliant SBD 9206 Donaldson | Cresco, IA | 5.9 MWh | 18.8 mi |
| Buffalo Center Wind LLC | Little Cedar, IA | 4.8 GWh | 27.7 mi |
| Charles City Wind Farm | Charles City, IA | 274.1 GWh | 17.8 mi |
| Crane Creek Wind Energy Center | Riceville, IA | 302.0 GWh | 19.3 mi |
| DPC Madison | Ridgeway, IA | 3.1 GWh | 21.5 mi |
| Fillmore County Solar Project | Spring Valley, MN | 83.0 GWh | 28.5 mi |
| Hawkeye Wind Farm | Sumner, IA | 173.3 GWh | 18.7 mi |
| Luther College Wind Project | Decorah, IA | 2.7 GWh | 28.9 mi |
| Maple City | Osage Township, IA | 3.1 GWh | 25.4 mi |
| Merl Parr | Charles City, IA | 432.0 MWh | 19.5 mi |
| New Hampton | New Hampton, IA | 676.0 MWh | 4.9 mi |
| Osage (IA) | Osage, IA | 5.6 GWh | 26.3 mi |
| Pioneer Prairie Wind Farm | McIntire, IA | 839.8 GWh | 27.8 mi |
| Rockford | Rockford, IA | 4.0 MWh | 32 mi |
| Saratoga Wind Farm | Lime Springs, IA | 258.1 GWh | 21.4 mi |
| South Plant (IA) | Waverly, IA | 51.0 MWh | 29.2 mi |
| Sumner | Sumner, IA | 175.0 MWh | 23.3 mi |
| Turtle Creek Wind Farm LLC | St. Ansgar, IA | 699.3 GWh | 32.7 mi |
| Waverly Community Wind Project | Waverly, IA | 6.5 GWh | 29.2 mi |
| Waverly Municipal Electric North Plant | Waverly, IA | 232.0 MWh | 29.2 mi |