Plant NameUtilityLocationBalancing AuthorityAnnual GenerationPlant DateLast UpdateFuel Types
ShorehamNational Grid Generation LLCWading River, NYNew York Independent System Operator (NYIS)1.0 GWhMar 1966Dec 2025 Distillate Fuel Oil
South HamptonNational Grid Generation LLCSouthampton, NYNew York Independent System Operator (NYIS)181.0 MWhFeb 1963Dec 2025 Distillate Fuel Oil
NIH Cogeneration FacilityNational Institutes of HealthBethesda, MDPJM Interconnection, LLC (PJM)120.4 GWhJun 2004Jun 2026 Natural Gas
National RaisinNational RaisinFowler, CACalifornia Independent System Operator (CISO)4.6 GWhMay 2015Dec 2025 Solar
National Energy of McBainNational Salvage & Service CorporationMcBain, MIMidcontinent Independent System Operator, Inc. (MISO)122.2 GWhNov 1988Dec 2024 Wood/Wood Waste Solids : 88.5% Tire-derived Fuels : 11.2%
NationwideNationwide Solar Energy LLCLancaster, MAISO New England (ISNE)4.7 GWhMay 2021Dec 2025 Solar
NaturEner Glacier Wind Energy 1NaturEner Glacier Wind Energy 1 LLCEthridge, MTNaturEner Power Watch, LLC (GWA)207.3 GWhSep 2008Jun 2026 Wind
NaturEner Glacier Wind Energy 2NaturEner Glacier Wind Energy 2 LLCEthridge, MTNaturEner Power Watch, LLC (GWA)205.6 GWhOct 2009May 2026 Wind
NaturEner Rim Rock EnergyNaturEner Rim Rock Energy LLCKevin, MTNaturEner Wind Watch, LLC (WWA)591.4 GWhNov 2012Jun 2026 Wind
P52ES 1755 Henryton Rd Phase 1 LLC CSGNautilus Solar SolutionsMarriottsville, MDPJM Interconnection, LLC (PJM)3.4 GWhMay 2021Dec 2025 Solar
Mtn Solar 6 LLC (CSG)Nautilus Solar SolutionsSterling, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.9 GWhFeb 2022Dec 2025 Solar
Pivot Solar 7 LLC (CSG)Nautilus Solar SolutionsRifle, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.6 GWhJun 2022Dec 2025 Solar
Pivot Solar 15 LLC (CSG)Nautilus Solar SolutionsBrush, COWestern Area Power Administration - Rocky Mountain Region (WACM)2.0 GWhNov 2022Dec 2024 Solar
Pivot Solar 2 LLC (CSG)Nautilus Solar SolutionsBrush, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.3 GWhNov 2022Dec 2025 Solar
Pivot Solar 14 LLC (CSG)Nautilus Solar SolutionsBrush, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.7 GWhNov 2022Dec 2025 Solar
Pivot Solar 1 LLC (CSG)Nautilus Solar SolutionsParachute, COWestern Area Power Administration - Rocky Mountain Region (WACM)1.9 GWhJun 2022Dec 2024 Solar
Pivot Solar 4 LLC (CSG)Nautilus Solar SolutionsPlatteville, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.6 GWhJun 2022Dec 2025 Solar
Bulldog Solar One, LLCNautilus Solar SolutionsBowie, MDPJM Interconnection, LLC (PJM)3.7 GWhOct 2020Dec 2025 Solar
Pittman Solar One LLCNautilus Solar SolutionsHancock, MDPJM Interconnection, LLC (PJM)3.7 GWhNov 2020Dec 2025 Solar
Mason Solar One LLCNautilus Solar SolutionsElkton, MDPJM Interconnection, LLC (PJM)1.9 GWhOct 2020Dec 2025 Solar
White Marsh SolarNautilus Solar SolutionsWhite Marsh, MDPJM Interconnection, LLC (PJM)2.5 GWhNov 2020Dec 2025 Solar
P52ES 1755 Henryton Rd Phase 2 LLCNautilus Solar SolutionsMarriottsville, MDPJM Interconnection, LLC (PJM)3.7 GWhMay 2021Dec 2025 Solar
Bright Field Solar LLC(CSG)Nautilus Solar SolutionsBurns, NYNew York Independent System Operator (NYIS)5.8 GWhNov 2021Dec 2025 Solar
NSE Camber Solar PS11 LLC (CSG)Nautilus Solar SolutionsSterling, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.7 GWhFeb 2022Dec 2025 Solar
NSE Camber BH CSG 2, LLCNautilus Solar SolutionsOrdway, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.9 GWhOct 2021Dec 2025 Solar
NSE Camber Solar PS13 LLC (CSG)Nautilus Solar SolutionsSterling, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.6 GWhJan 2022Dec 2025 Solar
Hostetter Solar One, LLCNautilus Solar SolutionsHagerstown, MDPJM Interconnection, LLC (PJM)3.5 GWhNov 2020Dec 2025 Solar
Burns Solar One LLCNautilus Solar SolutionsReisterstown, MDPJM Interconnection, LLC (PJM)3.7 GWhNov 2020Dec 2025 Solar
NSE Camber Solar PS6 LLC CSGNautilus Solar SolutionsPlatteville, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.6 GWhJan 2022Dec 2025 Solar
NSE Camber Solar PS5 LLC (CSG)Nautilus Solar SolutionsPlatteville, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.6 GWhJan 2022Dec 2025 Solar
TPE King Solar Holdings1, LLC (CSG)Nautilus Solar SolutionsNorth Smithfield, RIISO New England (ISNE)18.3 GWhMar 2022Dec 2025 Solar
Kirby Road Solar, LLCNautilus Solar SolutionsClinton, MDPJM Interconnection, LLC (PJM)2.4 GWhMay 2021Dec 2025 Solar
Pivot Solar 12 LLC(CSG)Nautilus Solar SolutionsSterling, COWestern Area Power Administration - Rocky Mountain Region (WACM)1.9 GWhFeb 2022Dec 2024 Solar
Pivot Solar 3 LLC (CSG)Nautilus Solar SolutionsParachute, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.8 GWhJun 2022Dec 2025 Solar
Pivot Solar 8 LLC (CSG)Nautilus Solar SolutionsPlatteville, COWestern Area Power Administration - Rocky Mountain Region (WACM)3.5 GWhJun 2022Dec 2025 Solar
Bright Oak Solar LLC(CSG)Nautilus Solar SolutionsBatavia, NYNew York Independent System Operator (NYIS)6.7 GWhNov 2021Dec 2025 Solar
Bright Hill Solar LLC(CSG)Nautilus Solar SolutionsDansville, NYNew York Independent System Operator (NYIS)7.8 GWhNov 2021Dec 2025 Solar
River Valley LLC (NY) (CSG)Nautilus Solar SolutionsOlean, NYNew York Independent System Operator (NYIS)7.2 GWhNov 2021Dec 2025 Solar
Clifton Park Solar 2, LLCNautilus Solar SolutionsRexford, NYNew York Independent System Operator (NYIS)3.1 GWhNov 2020Dec 2025 Solar
Clifton Park Solar 1, LLCNautilus Solar SolutionsRexford, NYNew York Independent System Operator (NYIS)8.2 GWhNov 2020Dec 2025 Solar
Hamlin Solar 1, LLCNautilus Solar SolutionsHamlin, NYNew York Independent System Operator (NYIS)9.3 GWhNov 2020Dec 2025 Solar
Mashpee Landfill SolarNautilus Solar SolutionsMashpee, MAISO New England (ISNE)2.0 GWhAug 2014Dec 2025 Solar
Exeter Mail CSGNautilus Solar SolutionsExeter, RIISO New England (ISNE)8.9 GWhDec 2024Dec 2025 Solar
Exeter Ten (CSG)Nautilus Solar SolutionsExeter, RIISO New England (ISNE)4.8 GWhNov 2024Dec 2025 Solar
Comfort CSGNautilus Solar SolutionsGrand Island, NYNew York Independent System Operator (NYIS)7.8 GWhAug 2024Dec 2025 Solar
Ver Plank South (CSG)Nautilus Solar SolutionsClay, NYNew York Independent System Operator (NYIS)8.3 GWhNov 2024Dec 2025 Solar
Washington WS01Nautilus Solar SolutionsWashington, MEISO New England (ISNE)5.1 GWhMay 2022Dec 2025 Solar
Beech Road (CSG)Nautilus Solar SolutionsTemple Hill, MDPJM Interconnection, LLC (PJM)7.9 GWhJul 2024Dec 2025 Solar
Bear OneNautilus Solar SolutionsHancock, MDPJM Interconnection, LLC (PJM)3.9 GWhOct 2023Dec 2025 Solar
Altamont (NY) (CSG)Nautilus Solar SolutionsGuilderland, NYNew York Independent System Operator (NYIS)3.5 GWhNov 2024Dec 2025 Solar
BNRG Norridgewock (CSG)Nautilus Solar SolutionsNorridgewock, MEISO New England (ISNE)3.3 GWhOct 2024Dec 2025 Solar
Athens AT01Nautilus Solar SolutionsAthens, MEISO New England (ISNE)7.1 GWhMay 2022Dec 2025 Solar
Wells (ME)Nautilus Solar SolutionsWells, MEISO New England (ISNE)8.4 GWhJun 2022Dec 2025 Solar
Ver Plank North (CSG)Nautilus Solar SolutionsClay, NYNew York Independent System Operator (NYIS)5.0 GWhNov 2024Dec 2025 Solar
North BridgtonNautilus Solar SolutionsOakland, MEISO New England (ISNE)8.0 GWhOct 2022Dec 2025 Solar
Mustang OneNautilus Solar SolutionsCambridge, MDPJM Interconnection, LLC (PJM)3.2 GWhJan 2024Dec 2025 Solar
Town HouseNautilus Solar SolutionsChelsea, MEISO New England (ISNE)8.3 GWhNov 2022Dec 2025 Solar
Missile Street (CSG)Nautilus Solar SolutionsPresque Island, MEISO New England (ISNE)4.3 GWhNov 2024Dec 2025 Solar
Meeting HouseNautilus Solar SolutionsNorth East, MDPJM Interconnection, LLC (PJM)3.8 GWhJul 2023Dec 2025 Solar
Dynamic - Leeds Solar (CSG)Nautilus Solar SolutionsLeeds, MEISO New England (ISNE)8.8 GWhOct 2024Dec 2025 Solar
Dynamic - Norridgewock Martin Stream (CSG)Nautilus Solar SolutionsNorridgewock, MEISO New England (ISNE)8.8 GWhOct 2024Dec 2025 Solar
Mechanic Street (CSG)Nautilus Solar SolutionsPresque Island, MEISO New England (ISNE)4.2 GWhNov 2024Dec 2025 Solar
TiffanyNautilus Solar SolutionsNorwich, NYNew York Independent System Operator (NYIS)8.2 GWhNov 2022Dec 2025 Solar
Ten OaksNautilus Solar SolutionsClarksville, MDPJM Interconnection, LLC (PJM)3.5 GWhMar 2024Dec 2025 Solar
StandishNautilus Solar SolutionsStandish, MEISO New England (ISNE)7.3 GWhSep 2023Dec 2025 Solar
SolarClub 30 (CSG)Nautilus Solar SolutionsEden Valley, MNMidcontinent Independent System Operator, Inc. (MISO)2.0 GWhDec 2023Dec 2025 Solar
SolarClub 03Nautilus Solar SolutionsStarbuck, MNMidcontinent Independent System Operator, Inc. (MISO)2.0 GWhAug 2023Dec 2025 Solar
Livingston Crossing (CSG)Nautilus Solar SolutionsClinton, MDPJM Interconnection, LLC (PJM)1.0 GWhJun 2025Dec 2025 Solar
Wolcott Hill (Camden) (CSG)Nautilus Solar SolutionsCamden, NYNew York Independent System Operator (NYIS)6.4 GWhNov 2024Dec 2025 Solar
Sheesley (CSG)Nautilus Solar SolutionsCanton, NYNew York Independent System Operator (NYIS)7.0 GWhNov 2024Dec 2025 Solar
Brewer (CSG)Nautilus Solar SolutionsBrewer, MEISO New England (ISNE)7.0 GWhJul 2024Dec 2025 Solar
SidneyNautilus Solar SolutionsSidney, MEISO New England (ISNE)2.3 GWhApr 2023Dec 2025 Solar
ShakerNautilus Solar SolutionsGray, MEISO New England (ISNE)6.2 GWhJun 2022Dec 2025 Solar
Farmingdale FA01Nautilus Solar SolutionsFarmingdale, MEISO New England (ISNE)8.0 GWhMay 2022Dec 2025 Solar
Sanford -NYNautilus Solar SolutionsSanford, MEISO New England (ISNE)8.1 GWhJan 2024Dec 2025 Solar
Sanford CGANautilus Solar SolutionsSanford, MEISO New England (ISNE)7.8 GWhMay 2022Dec 2025 Solar
Sabattus SB01Nautilus Solar SolutionsSabattus, MEISO New England (ISNE)7.7 GWhSep 2023Dec 2025 Solar
Ryans RanchNautilus Solar SolutionsParis, MEISO New England (ISNE)4.9 GWhMay 2022Dec 2025 Solar
QuarryNautilus Solar SolutionsNorth Berwick, MEISO New England (ISNE)10.4 GWhNov 2022Dec 2025 Solar
FryeburgNautilus Solar SolutionsFryeburg, MEISO New England (ISNE)9.3 GWhApr 2023Dec 2025 Solar
Pomham Islander (CSG)Nautilus Solar SolutionsNorth Smithfield, RIISO New England (ISNE)1.5 GWhJun 2025Dec 2025 Solar
Pivot Solar 10Nautilus Solar SolutionsAurora, COPublic Service Company of Colorado (PSCO)3.8 GWhMar 2024Dec 2025 Solar
KE73 CSGNautilus Solar SolutionsDover, DEPJM Interconnection, LLC (PJM)1.0 MWhNov 2025Dec 2025 Solar
Gowans (CSG)Nautilus Solar SolutionsAngola, NYNew York Independent System Operator (NYIS)2.4 GWhJun 2025Dec 2025 Solar
Pivot Solar 9Nautilus Solar SolutionsAurora, COPublic Service Company of Colorado (PSCO)3.9 GWhMar 2024Dec 2025 Solar
Peterboro (CSG)Nautilus Solar SolutionsVernon, NYNew York Independent System Operator (NYIS)6.8 GWhMay 2024Dec 2025 Solar
Parker PlaceNautilus Solar SolutionsSalisbury, MDPJM Interconnection, LLC (PJM)4.6 GWhMar 2024Dec 2025 Solar
OaklandNautilus Solar SolutionsOakland, MEISO New England (ISNE)8.7 GWhAug 2022Dec 2025 Solar
North Woods (CSG)Nautilus Solar SolutionsCanton, NYNew York Independent System Operator (NYIS)2.3 GWhJun 2025Dec 2025 Solar
BNRG North Anson (CSG)Nautilus Solar SolutionsNorth Anson, MEISO New England (ISNE)3.2 GWhOct 2024Dec 2025 Solar
BRNG Nicolin (CSG)Nautilus Solar SolutionsEllsworth, MEISO New England (ISNE)5.8 GWhNov 2024Dec 2025 Solar
BNRG Masardis (CSG)Nautilus Solar SolutionsMasardis, MEISO New England (ISNE)4.5 GWhNov 2024Dec 2025 Solar
Lion OneNautilus Solar SolutionsBaltimore, MDPJM Interconnection, LLC (PJM)3.6 GWhMar 2024Dec 2025 Solar
SolarClub 15 LLCNautilus Solar SolutionsClear Lake, MNMidcontinent Independent System Operator, Inc. (MISO)2.1 GWhNov 2020Dec 2025 Solar
SolarClub 10 LLCNautilus Solar SolutionsMonticello, MNMidcontinent Independent System Operator, Inc. (MISO)2.0 GWhNov 2020Dec 2025 Solar
SolarClub 20 LLCNautilus Solar SolutionsWabasha, MNMidcontinent Independent System Operator, Inc. (MISO)2.1 GWhNov 2020Dec 2025 Solar
SolarClub 23 LLCNautilus Solar SolutionsLa Crescent, MNMidcontinent Independent System Operator, Inc. (MISO)2.1 GWhNov 2020Dec 2025 Solar
SolarClub 28 LLCNautilus Solar SolutionsGaylord, MNMidcontinent Independent System Operator, Inc. (MISO)2.1 GWhNov 2020Dec 2025 Solar
SolarClub 35 LLCNautilus Solar SolutionsMankato, MNMidcontinent Independent System Operator, Inc. (MISO)2.2 GWhNov 2020Dec 2025 Solar
Guildlerland CSGNautilus Solar SolutionsGuilderland, NYNew York Independent System Operator (NYIS)3.0 GWhNov 2018Dec 2025 Solar

Summary of Power Plants By State

Figures are based on June 2026 generation numbers.
StateRankActive PlantsJun 2026 Generation
Alabama# 97712,594.28 GWh
Alaska# 48140563.53 GWh
Arizona# 1119911,138.97 GWh
Arkansas# 211176,425.86 GWh
California# 41,74417,197.11 GWh
Colorado# 293094,933.21 GWh
Connecticut# 341733,737.86 GWh
Delaware# 4935376.53 GWh
District of Columbia# 511718.29 GWh
Florida# 234226,309.59 GWh
Georgia# 725013,880.75 GWh
Hawaii# 4770767.91 GWh
Idaho# 411522,099.32 GWh
Illinois# 549416,673.62 GWh
Indiana# 182228,401.10 GWh
Iowa# 232976,139.01 GWh
Kansas# 251885,758.25 GWh
Kentucky# 22616,181.49 GWh
Louisiana# 15909,779.36 GWh
Maine# 452421,215.46 GWh
Maryland# 362283,591.08 GWh
Massachusetts# 446661,410.23 GWh
Michigan# 142769,804.74 GWh
Minnesota# 307904,889.70 GWh
Mississippi# 20606,899.16 GWh
Missouri# 241296,066.44 GWh
StateRankActive PlantsJun 2026 Generation
Montana# 40712,225.73 GWh
Nebraska# 391263,184.64 GWh
Nevada# 311174,654.59 GWh
New Hampshire# 43571,659.52 GWh
New Jersey# 283985,055.63 GWh
New Mexico# 331594,408.01 GWh
New York# 101,06411,564.60 GWh
North Carolina# 891312,773.20 GWh
North Dakota# 35593,713.80 GWh
Ohio# 621313,969.06 GWh
Oklahoma# 171449,156.03 GWh
Oregon# 272815,322.08 GWh
Pennsylvania# 325921,018.65 GWh
Rhode Island# 46107854.92 GWh
South Carolina# 162099,442.42 GWh
South Dakota# 42531,803.66 GWh
Tennessee# 19997,036.17 GWh
Texas# 11,02857,844.67 GWh
Utah# 381293,196.09 GWh
Vermont# 50118180.62 GWh
Virginia# 1225010,352.13 GWh
Washington# 1313510,051.77 GWh
West Virginia# 32414,489.44 GWh
Wisconsin# 262665,542.48 GWh
Wyoming# 37693,318.53 GWh