Milford Wind Corridor I LLC
2390 East First Wind Rd, Milford, UT 84751Plant Summary Information
Milford Wind Corridor I LLC is ranked #10 out of 120 power plants in Utah in terms of total annual net electricity generation.
Milford Wind Corridor I LLC generated 122.1 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Milford Wind Corridor I LLC |
---|---|
Utility Name | Milford Wind Corridor Phase I, LLC (Longroad) |
Location | Beaver County, UT |
Initial Operation Date | September 2009 |
Last Update | Mar 2025 |
Annual Generation | 391.5 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,566 out of 12,288 Power Plants Nationwide | |
Ranked #459 out of 1,353 Wind Power Plants Nationwide | |
Ranked #10 out of 120 Utah Power Plants | |
Ranked #1 out of 4 Utah Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
First Wind O&M, LLC (2013 to 2017) Longroad Energy Services LLC (2018 to 2022) Milford Wind Corridor Phase I, LLC (Longroad) (2023 to 2024) |
Map of Milford Wind Corridor I LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milford Wind Corridor I LLC.
Monthly Net Generation for Milford Wind Corridor I LLC
Milford Wind Corridor I LLC Details
Summary Information | |
---|---|
Plant Name | Milford Wind Corridor I LLC (57079) |
Plant Address | 2390 East First Wind Rd, Milford, UT 84751 |
Utility | Milford Wind Corridor Phase I, LLC (Longroad) (65908) |
Latitude, Longitude | 38.53569, -112.935 |
Generation Dates on File | Nov 2009 to Mar 2025 |
Initial Operation Date | September 2009 |
Annual Generation | 391.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG09-71 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Intermountain Power Agency (40576) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 203.5 MW |
Summer Capacity | 203.5 MW |
Winter Capacity | 203.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 97 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 97 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 XLE |
Design Wind Speed | 13.2 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Milford Wind Corridor I LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#449 | Tuolumne Wind Project | Goldendale, WA | 399.7 GWh |
#450 | Voyager Wind I | Mojave, CA | 399.1 GWh |
#451 | Willow Creek Wind Power LLC | Newell, SD | 398.9 GWh |
#452 | Vienna Wind Farm | Marshalltown, IA | 397.6 GWh |
#453 | Reloj del Sol Wind Farm | San Ygnacio, TX | 397.3 GWh |
#454 | Tatanka Wind Power LLC | Ashley, ND | 396.6 GWh |
#455 | Boswell Wind | Rock River, WY | 395.5 GWh |
#456 | Roundhouse Renewable Energy II | Granite, WY | 393.1 GWh |
#457 | Shiloh Wind Project 2 LLC | Birds Landing, CA | 393.1 GWh |
#458 | Northern Wind | Lake Wilson, MN | 391.8 GWh |
#460 | Bluff Point Wind Facility | Portland, IN | 390.9 GWh |
#461 | Elbow Creek Wind Project LLC | Forsan, TX | 390.7 GWh |
#462 | Glacier Hills | Cambria, WI | 390.4 GWh |
#463 | Shiloh I Wind Project | Rio Vista, CA | 389.6 GWh |
#464 | South Fork Wind | East Hampton, NY | 387.7 GWh |
#465 | Penascal Wind Power LLC | Sarita, TX | 387.0 GWh |
#466 | Midway Wind, LLC | Taft, TX | 386.8 GWh |
#467 | Babbitt Ranch Energy Center | Flagstaff, AZ | 386.5 GWh |
#468 | Pocahontas Prairie Wind Farm | Pomeroy, IA | 382.0 GWh |
#469 | Post Rock Wind Power Project, LLC | Ellsworth, KS | 382.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Milford Wind Corridor I LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 31.8 mi |
Blundell | Milford, UT | 272.5 GWh | 5.5 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.9 GWh | 37.1 mi |
Cove Fort | Cove Fort, UT | 120.8 GWh | 19.2 mi |
Escalante Solar I, LLC | Milford, UT | 215.1 GWh | 5.4 mi |
Escalante Solar II, LLC | Milford, UT | 216.0 GWh | 5.7 mi |
Escalante Solar III, LLC | Milford, UT | 213.7 GWh | 3.8 mi |
Granite Peak Solar Plant | Milford, UT | 6.2 GWh | 9.6 mi |
Greenville Solar Plant | Milford, UT | 4.4 GWh | 22.1 mi |
Laho Solar Plant | Milford, UT | 6.2 GWh | 17.7 mi |
Milford 2 | Milford, UT | 7.0 GWh | 10.6 mi |
Milford Flat Solar Plant | Milford, UT | 6.2 GWh | 17.3 mi |
Milford Solar 1 | Milford, UT | 260.4 GWh | 5.5 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 178.6 GWh | 3.4 mi |
Pavant Solar, LLC | Fillmore, UT | 114.3 GWh | 42.6 mi |
Smithfield 1 | Milford, UT | 8.5 GWh | 10.7 mi |
Smithfield 3 | Milford, UT | 5.5 GWh | 23.4 mi |
South Milford Solar Plant | Milford, UT | 7.4 GWh | 16.8 mi |
Thermo No 1 | Milford, UT | 57.7 GWh | 29.5 mi |
Upper Beaver | Beaver, UT | 10.1 GWh | 30.8 mi |