GCC Trident Solar Project
4070 Trident Rd, Three Forks, MT 59752Plant Summary Information
GCC Trident Solar Project is ranked #3 out of 9 solar farms in Montana in terms of total annual net electricity generation.
GCC Trident Solar Project generated 1.0 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | GCC Trident Solar Project |
|---|---|
| Utility Name | GCC Trident LLC |
| Location | Gallatin County, MT |
| Initial Operation Date | December 2022 |
| Last Update | Dec 2025 |
| Annual Generation | 7.0 GWh |
| Annual Consumption | 23.8 k MMBtu |
| Ranked #7,408 out of 13,081 Power Plants Nationwide | |
| Ranked #2,886 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #61 out of 71 Montana Power Plants | |
| Ranked #3 out of 9 Montana Solar Power Plants | |
| Fuel Types | Solar |
Map of GCC Trident Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for GCC Trident Solar Project.
Monthly Net Generation for GCC Trident Solar Project
Monthly Plant Fuel Consumption for GCC Trident Solar Project
GCC Trident Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | GCC Trident Solar Project (68260) |
| Plant Address | 4070 Trident Rd, Three Forks, MT 59752 |
| Utility | GCC Trident LLC (66692) |
| Latitude, Longitude | 45.93728, -111.46373 |
| Generation Dates on File | Jan 2024 to Dec 2025 |
| Initial Operation Date | December 2022 |
| Annual Generation | 7.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 1470749 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | NorthWestern Energy (NWMT) (NWMT) |
| NAICS Code | Nonmetallic Mineral Product Manufacturing (327) |
| Sector | Industrial Non-CHP (6) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | NorthWestern Energy LLC - (MT) (12825) MT |
| Grid Voltage | 4.16 kV |
| Energy Storage | No |
Generator GCC1 Details Operating December 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2022 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 2.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator GCC2 Details Operating March 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2025 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 2.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
GCC Trident Solar Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2876 | Swaggertown Solar II | Glenville, NY | 7.0 GWh |
| #2877 | HCE Amelia Solar II, LLC | Amelia, VA | 7.0 GWh |
| #2878 | Happy Solar | Four Oaks, NC | 7.0 GWh |
| #2879 | Turkey Branch Solar LLC | Fairmont, NC | 7.0 GWh |
| #2880 | Harding Solar, LLC | Hookerton, NC | 7.0 GWh |
| #2881 | Klamath Falls Solar 2 CSG | Klamath Falls, OR | 7.0 GWh |
| #2882 | Rice Lake Solar Array | Rice Lake, WI | 7.0 GWh |
| #2883 | GMP Solar/Storage-Milton Hybrid | Milton, VT | 7.0 GWh |
| #2884 | Sheesley (CSG) | Canton, NY | 7.0 GWh |
| #2885 | Lady Slipper Solar Array CSG | Red Wing, MN | 7.0 GWh |
| #2887 | NY Grand Island 871 Whitehaven Rd Solar | Grand Island, NY | 7.0 GWh |
| #2888 | New Bedford (MA) Plymouth | Plymouth, MA | 7.0 GWh |
| #2889 | Zeuber | Little Rock, AR | 7.0 GWh |
| #2890 | Mass Midstate Solar 2 | Warren, MA | 7.0 GWh |
| #2891 | Goose Pond Solar | Southwick, MA | 7.0 GWh |
| #2892 | Meadowbrook Solar Farm | Rockwell, NC | 7.0 GWh |
| #2893 | Middleton Solar Park | Middleton, MA | 6.8 GWh |
| #2894 | Hunt Road Solar | Amesbury, MA | 7.0 GWh |
| #2895 | Raffia Road Solar Project | Enfield, CT | 7.0 GWh |
| #2896 | SunE CPS2 LLC | San Antonio, TX | 7.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding GCC Trident Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apex Solar | Dillon, MT | 151.9 GWh | 78.7 mi |
| Basin Creek Plant | Butte, MT | 126.2 GWh | 50.7 mi |
| Beaver Creek Wind Facility | Big Timber, MT | 531.1 GWh | 94.5 mi |
| Big Timber Wind Farm | Big Timber, MT | 79.2 GWh | 87.4 mi |
| Broadwater Power Project | Toston, MT | 27.9 GWh | 12.9 mi |
| Canyon Ferry | Helena, MT | 273.1 GWh | 50.8 mi |
| Dave Gates Generating Station | Anaconda, MT | 420.9 GWh | 68.8 mi |
| Flint Creek Hydroelectric LLC | Philipsburg, MT | 9.0 GWh | 90 mi |
| Gordon Butte Wind LLC | Martinsdale, MT | 66.5 GWh | 63.1 mi |
| Great Divide Solar, LLC | Canyon Creek, MT | 5.7 GWh | 70.7 mi |
| Green Meadow Solar, LLC | Helena, MT | 5.1 GWh | 59.6 mi |
| Hauser | Helena, MT | 128.4 GWh | 60.7 mi |
| Holter | Wolf Creek, MT | 247.5 GWh | 77.3 mi |
| Judith Gap Wind Energy Center | Harlowton, MT | 406.8 GWh | 92.8 mi |
| Madison Dam | Ennis, MT | 75.6 GWh | 32.1 mi |
| Musselshell Wind Project | Shawmut, MT | 23.1 GWh | 97.7 mi |
| Mystic | Fishtail, MT | 52.5 GWh | 95.8 mi |
| River Bend Solar, LLC (MT) | Reed Point, MT | 3.1 GWh | 92.8 mi |
| Stillwater Wind, LLC | Reed Point, MT | 269.2 GWh | 95.7 mi |
| Two Dot Wind Farm | Two Dot, MT | 28.8 GWh | 74.7 mi |