GCC Trident Solar Project
4070 Trident Rd, Three Forks, MT 59752Plant Summary Information
GCC Trident Solar Project is ranked #8 out of 9 solar farms in Montana in terms of total annual net electricity generation.
GCC Trident Solar Project generated 384.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | GCC Trident Solar Project |
---|---|
Utility Name | GCC Trident LLC |
Location | Gallatin County, MT |
Initial Operation Date | December 2022 |
Last Update | Dec 2024 |
Annual Generation | 3.7 GWh |
Annual Consumption | 12.6 k MMBtu |
Ranked #8,696 out of 12,299 Power Plants Nationwide | |
Ranked #3,694 out of 6,182 Solar Power Plants Nationwide | |
Ranked #64 out of 70 Montana Power Plants | |
Ranked #8 out of 9 Montana Solar Power Plants | |
Fuel Types | Solar |
Map of GCC Trident Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for GCC Trident Solar Project.
Monthly Net Generation for GCC Trident Solar Project
GCC Trident Solar Project Details
Summary Information | |
---|---|
Plant Name | GCC Trident Solar Project (68260) |
Plant Address | 4070 Trident Rd, Three Forks, MT 59752 |
Utility | GCC Trident LLC (66692) |
Latitude, Longitude | 45.93728, -111.46373 |
Generation Dates on File | Jan 2024 to Dec 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 3.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 1470749 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | NorthWestern Energy (NWMT) (NWMT) |
NAICS Code | Nonmetallic Mineral Product Manufacturing (327) |
Sector | Industrial Non-CHP (6) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | NorthWestern Energy LLC - (MT) (12825) MT |
Grid Voltage | 4.16 kV |
Energy Storage | No |
Generator GCC1 Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
GCC Trident Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3684 | Goldenrod Solar | Pamplico, SC | 3.7 GWh |
#3685 | Ellsworth I CSG | Mechanicville, NY | 3.7 GWh |
#3686 | Next Generation Solar Farm | New Haven, VT | 3.7 GWh |
#3687 | Terrell Riles Stovall | Dawson, GA | 3.7 GWh |
#3688 | Gunnison Solar | Gunnison, UT | 3.7 GWh |
#3689 | USS Itasca Clean Energy Solar LLC | Grand Rapids, MN | 3.6 GWh |
#3690 | Wabasha Holdco Solar CSG | Wabasha, MN | 3.7 GWh |
#3691 | County College of Morris | Randolph, NJ | 3.7 GWh |
#3692 | Washington St Community Solar Farm #3 | Ogden, NY | 3.7 GWh |
#3693 | Cumberland Solar | Cumberland, WI | 3.7 GWh |
#3695 | MHG Wallingford | Wallingford, VT | 3.7 GWh |
#3696 | Morgan Solar 2, LLC CSG | Murrayville, IL | 3.7 GWh |
#3697 | Venture 2 - 1B | Aurora, CO | 3.7 GWh |
#3698 | Venture 3 - 1C | Aurora, CO | 3.7 GWh |
#3699 | MA Blackstone | Blackstone, MA | 3.7 GWh |
#3700 | KDC Solar CV Ascend One LLC | West Friendship, MD | 3.7 GWh |
#3701 | Mtn. Solar 2 | Watkins, CO | 3.7 GWh |
#3702 | THD Baltimore DCs - 5829 Project Lion | Edgemere, MD | 3.7 GWh |
#3703 | Rutan | Palmdale, CA | 3.7 GWh |
#3704 | Aulander Hwy 42 Solar, LLC | Aulander, NC | 3.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding GCC Trident Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Solar | Dillon, MT | 161.3 GWh | 78.7 mi |
Basin Creek Plant | Butte, MT | 187.6 GWh | 50.7 mi |
Big Timber Wind Farm | Big Timber, MT | 67.7 GWh | 87.4 mi |
Broadwater Power Project | Toston, MT | 47.4 GWh | 12.9 mi |
Canyon Ferry | Helena, MT | 275.1 GWh | 50.8 mi |
Dave Gates Generating Station | Anaconda, MT | 463.7 GWh | 68.8 mi |
Flint Creek Hydroelectric LLC | Philipsburg, MT | 11.0 GWh | 90 mi |
Gordon Butte Wind LLC | Martinsdale, MT | 72.8 GWh | 63.1 mi |
Great Divide Solar, LLC | Canyon Creek, MT | 6.1 GWh | 70.7 mi |
Green Meadow Solar, LLC | Helena, MT | 5.6 GWh | 59.6 mi |
Hauser | Helena, MT | 134.4 GWh | 60.7 mi |
Holter | Wolf Creek, MT | 265.8 GWh | 77.3 mi |
Judith Gap Wind Energy Center | Harlowton, MT | 436.7 GWh | 92.8 mi |
Madison Dam | Ennis, MT | 76.2 GWh | 32.1 mi |
Musselshell Wind Project | Shawmut, MT | 23.1 GWh | 97.7 mi |
Musselshell Wind Project Two LLC | Shawmut, MT | 26.5 GWh | 97.7 mi |
Mystic | Fishtail, MT | 53.7 GWh | 95.8 mi |
River Bend Solar, LLC | Reed Point, MT | 3.5 GWh | 92.8 mi |
Stillwater Wind, LLC | Reed Point, MT | 285.1 GWh | 95.7 mi |
Two Dot Wind Farm | Two Dot, MT | 34.8 GWh | 74.7 mi |