Bethlehem Energy Center is ranked #11 out of 944 power plants in New York in terms of total annual net electricity generation.
Bethlehem Energy Center is comprised of 4 generators and generated 707.3 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Bethlehem Energy Center |
|---|---|
| Utility Name | GB II New York LLC |
| Location | Albany County, NY |
| Initial Operation Date | July 2005 |
| Last Update | Feb 2026 |
| Annual Generation | 3.4 TWh |
| Annual Consumption | 40.5 M MMBtu |
| Ranked #344 out of 12,637 Power Plants Nationwide | |
| Ranked #189 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #11 out of 944 New York Power Plants | |
| Ranked #6 out of 115 New York Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operators |
PSEG Power New York Inc (2013 to 2021) Generation Bridge II New York LLC (2022 to 2023) GB II New York LLC (2024 to 2024) |
Map of Bethlehem Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bethlehem Energy Center.
Monthly Net Generation for Bethlehem Energy Center
Monthly Plant Fuel Consumption for Bethlehem Energy Center
Bethlehem Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Bethlehem Energy Center (2539) |
| Plant Address | 380 River Road, Glenmont, NY 12077 |
| Utility | GB II New York LLC (65417) |
| Latitude, Longitude | 42.5942, -73.76375 |
| Generation Dates on File | Jan 2001 to Feb 2026 |
| Initial Operation Date | July 2005 |
| Annual Generation | 3.4 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 00-141-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Hudson River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
| Grid Voltage | 115.00 kV / 115.00 kV / 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
DOMINION TRANSMISSION INCORPORATED TENNESSEE GAS PIPELINE COMPANY |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator 5 Details Operating July 2005
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | BETHLEHEM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 323560 |
| Nameplate Capacity | 194.3 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 178.4 MW |
| Winter Capacity | 205.8 MW |
| Minimum Load | 170 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2005 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Kerosene |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 176 MW |
| Net Winter Capacity With Natural Gas | 207 MW |
| Net Summer Capacity With Oil | 176 MW |
| Net Winter Capacity With Oil | 207 MW |
| Time To Switch From Gas To Oil | UNK |
| Time To Switch From Oil To Gas | UNK |
| Factors That Limit Switching | No |
Generator 6 Details Operating July 2005
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | BETHLEHEM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 323561 |
| Nameplate Capacity | 194.3 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 179.7 MW |
| Winter Capacity | 205.8 MW |
| Minimum Load | 170 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2005 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 176 MW |
| Net Winter Capacity With Natural Gas | 207 MW |
| Net Summer Capacity With Oil | 176 MW |
| Net Winter Capacity With Oil | 207 MW |
| Time To Switch From Gas To Oil | UNK |
| Time To Switch From Oil To Gas | UNK |
| Factors That Limit Switching | No |
Generator 7 Details Operating July 2005
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | BETHLEHEM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 323562 |
| Nameplate Capacity | 194.3 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 177.9 MW |
| Winter Capacity | 205.8 MW |
| Minimum Load | 170 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2005 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 176 MW |
| Net Winter Capacity With Natural Gas | 207 MW |
| Net Summer Capacity With Oil | 176 MW |
| Net Winter Capacity With Oil | 207 MW |
| Time To Switch From Gas To Oil | UNK |
| Time To Switch From Oil To Gas | UNK |
| Factors That Limit Switching | No |
Generator 8 Details Operating July 2005
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | BETHLEHEM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 352659 |
| Nameplate Capacity | 310.2 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 279.5 MW |
| Winter Capacity | 307.3 MW |
| Minimum Load | 170 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2005 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Bethlehem Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #179 | Osprey Energy Center Power Plant | Auburndale, FL | 3.6 TWh |
| #180 | Thomas C Ferguson | Horseshoe Bay, TX | 3.5 TWh |
| #181 | Washington Energy Facility | Beverly, OH | 3.5 TWh |
| #182 | Pastoria Energy Facility, LLC | Lebec, CA | 3.5 TWh |
| #183 | Bear Garden | New Canton, VA | 3.5 TWh |
| #184 | Baytown Energy Center | Baytown, TX | 3.5 TWh |
| #185 | Sabine | Orange, TX | 3.5 TWh |
| #186 | Wildcat Point Generation Facility | Conowingo, MD | 3.5 TWh |
| #187 | ANP Bellingham Energy Project | Bellingham, MA | 3.5 TWh |
| #188 | McWilliams | Gantt, AL | 3.5 TWh |
| #190 | Polk | Mulberry, FL | 3.5 TWh |
| #191 | Magnet Cove | Malvern, AR | 3.4 TWh |
| #192 | Tenaska Frontier Generation Station | Shiro, TX | 3.4 TWh |
| #193 | Kleen Energy Systems Project | Middletown, CT | 3.5 TWh |
| #194 | Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.4 TWh |
| #195 | Riverside Energy Center | Beloit, WI | 3.4 TWh |
| #196 | Marshall (NC) | Terrell, NC | 7.1 TWh |
| #197 | Lagoon Creek | Brownsville, TN | 3.3 TWh |
| #198 | Bobby C Smith Jr Energy Facility | Rincon, GA | 3.3 TWh |
| #199 | Cosumnes | Herald, CA | 3.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bethlehem Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Albany Medical Ctr Cogen Plant | Albany, NY | 28.8 GWh | 4.3 mi |
| Altamont (NY) (CSG) | Guilderland, NY | 12.0 MWh | 11 mi |
| Bethlehem - East | Selkirk, NY | 2.1 GWh | 4.9 mi |
| Bethlehem - West | Selkirk, NY | 2.1 GWh | 4.9 mi |
| Bethlehem Solar | New Scotland, NY | 2.2 GWh | 6.3 mi |
| Capital Hill Solar LLC | Albany, NY | 2.0 GWh | 7 mi |
| Castleton | Castleton on Hudson, NY | 8.1 GWh | 5.8 mi |
| Castleton Energy Center | Castleton, NY | 87.1 GWh | 4.1 mi |
| ELP Kinderhook CSG | Valatie, NY | 8.4 GWh | 9.7 mi |
| Empire Generating Co LLC | Rensselaer, NY | 3.0 TWh | 2.3 mi |
| Hecate Energy Albany 2 LLC | Coeymans, NY | 24.7 GWh | 7 mi |
| Hecate Energy Albany County 1 | Coeymans, NY | 26.5 GWh | 6.5 mi |
| HVCC Cogen Plant | Troy, NY | 13.8 GWh | 8.3 mi |
| Krumkill Road Solar North, LLC | Guilderland, NY | 2.6 GWh | 6.9 mi |
| Krumkill Road Solar South, LLC | Guilderland, NY | 2.8 GWh | 6.9 mi |
| MM Albany Energy | Albany, NY | 10.1 GWh | 8.8 mi |
| MSAP 13 | Troy, NY | 3.2 GWh | 8.6 mi |
| Owens Corning at Bethlehem | Bethlehem, NY | 2.7 GWh | 5.2 mi |
| Rensselaer Cogen | Rensselaer, NY | 18.8 GWh | 2.3 mi |
| Selkirk Cogen | Selkirk, NY | 92.4 GWh | 5 mi |