Swauk Wind LLC
18511 Highway 10, Thorp, WA 98946Plant Summary Information
Swauk Wind LLC is ranked #23 out of 23 wind farms in Washington in terms of total annual net electricity generation.
Swauk Wind LLC generated 505.0 MWh during the 3-month period between August 2024 to November 2024.
| Plant Name | Swauk Wind LLC |
|---|---|
| Utility Name | Gamesa Wind US LLC |
| Location | Kittitas County, WA |
| Initial Operation Date | December 2012 |
| Last Update | Nov 2024 |
| Annual Generation | 2.4 GWh |
| Annual Consumption | 8.2 k MMBtu |
| Ranked #10,024 out of 12,539 Power Plants Nationwide | |
| Ranked #1,313 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #126 out of 133 Washington Power Plants | |
| Ranked #23 out of 23 Washington Wind Power Plants | |
| Fuel Types | Wind |
Map of Swauk Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Swauk Wind LLC.
Monthly Net Generation for Swauk Wind LLC
Swauk Wind LLC Details
| Summary Information | |
|---|---|
| Plant Name | Swauk Wind LLC (58441) |
| Plant Address | 18511 Highway 10, Thorp, WA 98946 |
| Utility | Gamesa Wind US LLC (58430) |
| Latitude, Longitude | 47.13917, -120.75306 |
| Generation Dates on File | Jan 2013 to Nov 2024 |
| Initial Operation Date | December 2012 |
| Annual Generation | 2.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 13-93-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Puget Sound Energy (PSEI) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | N/A |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Puget Sound Energy Inc (15500) WA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator SW Details Operating December 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 4.3 MW |
| Summer Capacity | 4.3 MW |
| Winter Capacity | 4.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2012 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 5 |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 5 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G58-850 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 180 |
Swauk Wind LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1303 | Luther College Wind Project | Decorah, IA | 2.7 GWh |
| #1304 | St. Olaf Wind Turbine | Northfield, MN | 2.6 GWh |
| #1305 | Eolos Wind Energy Research Field Station | Rosemount, MN | 2.6 GWh |
| #1306 | Marshall Wind 1 LLC | Marshall, MN | 2.5 GWh |
| #1307 | Blue Breezes LLC | Blue Earth, MN | 2.4 GWh |
| #1308 | Blue Breezes II LLC | Blue Earth, MN | 2.4 GWh |
| #1309 | Mountain Lake | Mountain Lake, MN | 2.5 GWh |
| #1310 | Stahl Wind Energy | Pipestone, MN | 2.4 GWh |
| #1311 | WED Coventry 1 | Coventry, RI | 2.4 GWh |
| #1312 | WED NK Green | North Kingstown, RI | 2.4 GWh |
| #1314 | Northern Lights Wind LLC | Pipestone, MN | 2.4 GWh |
| #1315 | Scituate Wind | Scituate, MA | 2.4 GWh |
| #1316 | Camelot Wind LLC | Plymouth, MA | 2.3 GWh |
| #1317 | WED Coventry 4 | Coventry, RI | 2.3 GWh |
| #1318 | Vestas Towers America, Inc. | Pueblo, CO | 2.2 GWh |
| #1319 | WED Coventry 3 | Coventry, RI | 2.2 GWh |
| #1320 | Foundation ST | Tracy, CA | 2.2 GWh |
| #1321 | Lucky Wind | Pipestone, MN | 2.2 GWh |
| #1322 | Marshall Wind 5 LLC | Marshall, MN | 2.1 GWh |
| #1323 | Foundation AB | Fairfield, CA | 2.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Swauk Wind LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Camas Solar Project | Ellensburg, WA | 9.7 GWh | 16.9 mi |
| Cedar Falls (WA) | North Bend, WA | 6.2 GWh | 52 mi |
| Cowiche | Tieton, WA | 2.7 GWh | 30.9 mi |
| Crystal Mountain | Greenwater, WA | 492.0 MWh | 36.3 mi |
| Goose Prairie Solar | Moxee, WA | 161.7 GWh | 48.6 mi |
| Orchard Avenue 1 | Yakima, WA | 2.5 GWh | 37.7 mi |
| PEC Headworks | Moses Lake, WA | 17.8 GWh | 40.3 mi |
| Penstemon Solar Project | Ellensburg, WA | 10.7 GWh | 16.9 mi |
| Priest Rapids | Mattawa, WA | 4.0 TWh | 52.5 mi |
| Rock Island | Wenatchee, WA | 2.2 TWh | 34.2 mi |
| Rocky Reach | Wenatchee, WA | 5.1 TWh | 34.7 mi |
| Roza | Yakima, WA | 47.7 GWh | 38.3 mi |
| Sagebrush Power Partners | Ellensburg, WA | 277.8 GWh | 3.1 mi |
| Tieton Dam Hydro Electric Project | Rimrock, WA | 19.5 GWh | 37.7 mi |
| Twin Falls Hydro | North Bend, WA | 62.9 GWh | 48.6 mi |
| Urtica Solar Project | Ellensburg, WA | 10.6 GWh | 3.7 mi |
| Vantage Wind Energy LLC | Ellensburg, WA | 273.2 GWh | 29.8 mi |
| Wanapum | Beverly, WA | 4.3 TWh | 41.2 mi |
| Weeks Falls | North Bend, WA | 13.1 GWh | 46.6 mi |
| Wild Horse | Ellensburg, WA | 571.1 GWh | 26.7 mi |