LRI LFGTE Facility
30919 Meridian Street East, Graham, WA 98338Plant Summary Information
LRI LFGTE Facility is ranked #1 out of 1 landfill gas power plants in Washington in terms of total annual net electricity generation.
LRI LFGTE Facility is comprised of 3 generators and generated 8.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | LRI LFGTE Facility |
---|---|
Utility Name | Frontier Operation Services |
Location | Pierce County, WA |
Initial Operation Date | November 2013 |
Last Update | Dec 2024 |
Annual Generation | 32.1 GWh |
Annual Consumption | 400.6 k MMBtu |
Ranked #4,552 out of 12,288 Power Plants Nationwide | |
Ranked #77 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #93 out of 131 Washington Power Plants | |
Ranked #1 out of 1 Washington Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
BioFuels Washington LLC (2013 to 2014) ENERGYneering Solutions, Inc (2015 to 2018) Frontier Operation Services (2019 to 2024) |
Map of LRI LFGTE Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for LRI LFGTE Facility.
Monthly Net Generation for LRI LFGTE Facility
LRI LFGTE Facility Details
Summary Information | |
---|---|
Plant Name | LRI LFGTE Facility (58688) |
Plant Address | 30919 Meridian Street East, Graham, WA 98338 |
Utility | Frontier Operation Services (63199) |
Latitude, Longitude | 46.97556, -122.29056 |
Generation Dates on File | Nov 2013 to Dec 2024 |
Initial Operation Date | November 2013 |
Annual Generation | 32.1 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF13-680-000f |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 13-680-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Puget Sound Energy (PSEI) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Puget Sound Energy Inc (15500) WA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator A Details Operating November 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator B Details Operating November 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator C Details Operating November 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
LRI LFGTE Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#67 | Springhill Gas Recovery Plant | Campbellton, FL | 35.3 GWh |
#68 | Zimmerman Energy | Argos, IN | 34.7 GWh |
#69 | Richmond Energy | Henrico, VA | 33.4 GWh |
#70 | Taylor | Mauk, GA | 33.4 GWh |
#71 | Hyland LFGTE Facility | Angelica, NY | 33.3 GWh |
#72 | Fitchburg Gas Recovery | Westminster, MA | 32.3 GWh |
#73 | Modern Innovative Energy LLC | Youngstown, NY | 32.3 GWh |
#74 | Ameresco Vasco Road | Livermore, CA | 32.3 GWh |
#75 | Austin Gas Recovery | Austin, TX | 32.2 GWh |
#76 | Uwharrie Mountain Renewable | Mt. Gilead, NC | 32.1 GWh |
#78 | Amelia | Jetersville, VA | 33.9 GWh |
#79 | Ameresco Forward | Manteca, CA | 31.8 GWh |
#80 | Chestnut Ridge Gas Recovery | Heiskell, TN | 31.1 GWh |
#81 | Stanton Energy Center | Orlando, FL | 4.1 TWh |
#82 | Ameresco San Joaquin | Linden, CA | 30.7 GWh |
#83 | Prairie View I & II LFGTE | Wyatt, IN | 30.5 GWh |
#84 | Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.5 GWh |
#85 | Model City Energy Facility | Youngstown, NY | 30.1 GWh |
#86 | Georgia LFG Oak Grove Plant | Winder, GA | 38.7 GWh |
#87 | Sarasota County LFGTE Facility | Nokomis, FL | 30.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding LRI LFGTE Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alder | La Grande, WA | 182.9 GWh | 12.1 mi |
Cedar Falls (WA) | North Bend, WA | 6.2 GWh | 38.9 mi |
Cedar Hills | Maple Valley, WA | 78.0 MWh | 35.2 mi |
Chehalis Generating Facility | Chehalis, WA | 2.6 TWh | 38.2 mi |
Cowlitz Falls | Randle, WA | 196.3 GWh | 36.2 mi |
Crystal Mountain | Greenwater, WA | 270.0 MWh | 38.5 mi |
Frederickson | Tacoma, WA | 87.8 GWh | 8 mi |
Frederickson Power LP | Tacoma, WA | 1.8 TWh | 8.4 mi |
LaGrande | La Grande, WA | 297.3 GWh | 10 mi |
Mayfield | Silver Creek, WA | 576.4 GWh | 35.5 mi |
Mossyrock | Silver Creek, WA | 798.5 GWh | 31.1 mi |
Packwood | Packwood, WA | 63.0 GWh | 43 mi |
Skookumchuck | Tenino, WA | 3.2 GWh | 24.2 mi |
Skookumchuck Wind Facility | Rainier, WA | 410.3 GWh | 19.6 mi |
Snoqualmie | Snoqualmie, WA | 65.9 GWh | 44.4 mi |
Snoqualmie 2 | Snoqualmie, WA | 108.9 GWh | 44.6 mi |
Transalta Centralia Generation | Centralia, WA | 3.1 TWh | 30.9 mi |
Twin Falls Hydro | North Bend, WA | 62.9 GWh | 43 mi |
Weeks Falls | North Bend, WA | 13.1 GWh | 43.7 mi |
Yelm | Yelm, WA | 33.7 GWh | 16.3 mi |