Chino Mines
210 Cortez Ave., Hurley, NM 88043Plant Summary Information
Chino Mines is ranked #38 out of 158 power plants in New Mexico in terms of total annual net electricity generation.
Chino Mines is comprised of 2 generators and generated 41.1 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Chino Mines |
|---|---|
| Utility Name | FreePort-McMoRan-Corp-Chino Mines |
| Location | Grant County, NM |
| Initial Operation Date | October 1959 |
| Last Update | Jul 2026 |
| Annual Generation | 263.0 GWh |
| Annual Consumption | 3.5 M MMBtu |
| Ranked #2,229 out of 13,285 Power Plants Nationwide | |
| Ranked #691 out of 2,215 Natural Gas Power Plants Nationwide | |
| Ranked #38 out of 158 New Mexico Power Plants | |
| Ranked #10 out of 19 New Mexico Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
Phelps Dodge Corp-Chino Mines (2013 to 2013) FreePort-McMoRan-Corp-Chino Mines (2014 to 2025) |
Map of Chino Mines
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chino Mines.
Monthly Net Generation for Chino Mines
Monthly Plant Fuel Consumption for Chino Mines
Chino Mines Details
| Summary Information | |
|---|---|
| Plant Name | Chino Mines (54667) |
| Plant Address | 210 Cortez Ave., Hurley, NM 88043 |
| Utility | FreePort-McMoRan-Corp-Chino Mines (3670) |
| Latitude, Longitude | 32.6956, -108.1225 |
| Generation Dates on File | Jan 2001 to Jul 2026 |
| Initial Operation Date | October 1959 |
| Annual Generation | 263.0 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of New Mexico (PNM) |
| NAICS Code | Metal Ore Mining (2122) |
| Sector | Industrial Non-CHP (6) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | EL PASO NATURAL GAS COMPANY LLC |
| Natural Gas Storage | No |
Generator 7 Details Standby October 1959
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CTG9 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 16.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 15.4 MW |
| Winter Capacity | 15.5 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | October 1959 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 9 Details Standby July 2001
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CTG9 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 37.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 35 MW |
| Winter Capacity | 40 MW |
| Minimum Load | 4.5 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | July 2001 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Chino Mines Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #681 | T B Simon Power Plant | East Lansing, MI | 274.1 GWh |
| #682 | V H Braunig | Elmendorf, TX | 274.7 GWh |
| #683 | Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 271.8 GWh |
| #684 | Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh |
| #685 | Kearny Generating Station | Kearny, NJ | 270.1 GWh |
| #686 | Dahlberg | Nicholson, GA | 286.5 GWh |
| #687 | Pyramid | Lordsburg, NM | 266.6 GWh |
| #688 | West Point (PA) | West Point, PA | 265.3 GWh |
| #689 | Dickerson Power | Dickerson, MD | 308.1 GWh |
| #690 | US Borax | Boron, CA | 263.2 GWh |
| #692 | Portside Energy | Portage, IN | 262.4 GWh |
| #693 | Gallatin (TN) | Gallatin, TN | 4.9 TWh |
| #694 | Sylvarena | Raleigh, MS | 262.1 GWh |
| #695 | Ames Electric Services Power Plant | Ames, IA | 285.0 GWh |
| #696 | UCLA So Campus Cogen Project | Los Angeles, CA | 257.1 GWh |
| #697 | Hardin County Peaking Facility | Kountze, TX | 256.8 GWh |
| #698 | Salinas River Cogeneration | San Ardo, CA | 255.7 GWh |
| #699 | Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 255.4 GWh |
| #700 | Milford Power LP | Milford, MA | 253.3 GWh |
| #701 | Lieberman | Mooringsport, LA | 252.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chino Mines.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Afton Generating Station | La Mesa, NM | 509.7 GWh | 84.6 mi |
| Alta Luna | Deming, NM | 15.8 GWh | 38 mi |
| City of Truth or Consequences PV | Truth or Consequences, NM | 1.4 GWh | 56.6 mi |
| Columbus Solar Project | Columbus, NM | 5.2 GWh | 65.2 mi |
| Deming Solar Energy Center | Deming, NM | 20.1 GWh | 42.5 mi |
| Elephant Butte | Truth or Consequences, NM | 16.6 GWh | 62.6 mi |
| Emi NM Bent Bow | Garfield, NM | 440.0 MWh | 51.3 mi |
| Hatch Solar Energy Center I, LLC | Hatch, NM | 9.9 GWh | 50.4 mi |
| Lightning Dock Geothermal | Animas, NM | 72.7 GWh | 56.5 mi |
| Lordsburg Generating | Lordsburg, NM | 65.8 GWh | 41.1 mi |
| Luna Energy Facility | Deming, NM | 2.1 TWh | 33.8 mi |
| Macho Springs | Deming, NM | 124.2 GWh | 38.4 mi |
| Macho Springs Power I | Deming, NM | 115.3 GWh | 37 mi |
| NMSU Solar and Storage | Las Cruces, NM | 7.8 GWh | 85.1 mi |
| Pluma - SLT Las Cruces | Las Cruces, NM | 751.0 MWh | 84.4 mi |
| Pyramid | Lordsburg, NM | 266.6 GWh | 40.3 mi |
| Silver City WWTP PV Project | Silver City, NM | 2.0 GWh | 7.4 mi |
| Solar PV Development NM 18 II LLC | Deming, NM | 142.6 GWh | 36.9 mi |
| SunE EPE2 LLC | Las Cruces, NM | 26.4 GWh | 76.9 mi |
| Wal-Mart Truth or Consequences PV | Truth or Consequences, NM | 1.6 GWh | 59.7 mi |