King Mountain Wind Ranch 1
120 E. 5th Street, McCamey, TX 79752Plant Summary Information
King Mountain Wind Ranch 1 is ranked #80 out of 228 wind farms in Texas in terms of total annual net electricity generation.
King Mountain Wind Ranch 1 generated 184.0 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | King Mountain Wind Ranch 1 |
|---|---|
| Utility Name | FPL Energy Upton Wind LP |
| Location | Upton County, TX |
| Initial Operation Date | June 2001 |
| Last Update | Jun 2026 |
| Annual Generation | 639.5 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #1,090 out of 13,094 Power Plants Nationwide | |
| Ranked #247 out of 1,369 Wind Power Plants Nationwide | |
| Ranked #207 out of 858 Texas Power Plants | |
| Ranked #80 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of King Mountain Wind Ranch 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for King Mountain Wind Ranch 1.
Monthly Net Generation for King Mountain Wind Ranch 1
Monthly Plant Fuel Consumption for King Mountain Wind Ranch 1
King Mountain Wind Ranch 1 Details
| Summary Information | |
|---|---|
| Plant Name | King Mountain Wind Ranch 1 (55581) |
| Plant Address | 120 E. 5th Street, McCamey, TX 79752 |
| Utility | FPL Energy Upton Wind LP (6354) |
| Latitude, Longitude | 31.2092, -102.2417 |
| Generation Dates on File | Aug 2001 to Jun 2026 |
| Initial Operation Date | June 2001 |
| Annual Generation | 639.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator EXIS Details Operating June 2001
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 278 MW |
| Summer Capacity | 278 MW |
| Winter Capacity | 278 MW |
| Minimum Load | 14.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2001 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 214 |
| Turbine Details | |
| Number Of Turbines | 214 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-1.3-62 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 203.4 |
King Mountain Wind Ranch 1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #237 | Wildcat Ranch Wind Project | Morton, TX | 655.4 GWh |
| #238 | Brazos Wind Farm | Fluvanna, TX | 655.2 GWh |
| #239 | Windy Flats Wind Project | Centerville, WA | 650.9 GWh |
| #240 | Cedar Creek Wind | Grover, CO | 647.4 GWh |
| #241 | Monte Cristo 1 | Monte Alto, TX | 646.7 GWh |
| #242 | Ledyard Windpower, LLC | Lakota, IA | 646.6 GWh |
| #243 | Limon III Wind LLC | Limon, CO | 644.4 GWh |
| #244 | Headwaters Wind Farm LLC | Winchester, IN | 642.3 GWh |
| #245 | Glacier Sands Wind Power, LLC | Mason City, IL | 641.6 GWh |
| #246 | Chickasaw Wind Farm | New Hampton, IA | 641.2 GWh |
| #248 | South Hurlburt Wind LLC | Arlington, OR | 639.0 GWh |
| #249 | Brady Wind Energy Center | Dickinson, ND | 638.9 GWh |
| #250 | Horseshoe Bend Wind LLC | Arlington, OR | 634.9 GWh |
| #251 | Peyton Creek Wind Farm II | Bay City, TX | 634.2 GWh |
| #252 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 633.6 GWh |
| #253 | Patriot Wind Farm | Bishop, TX | 633.3 GWh |
| #254 | Brady II Wind Energy Center | Dickinson, ND | 631.6 GWh |
| #255 | Heart of Texas Wind Project | Brady, TX | 631.3 GWh |
| #256 | Willow Creek Wind (OK) | Morrison, OK | 627.8 GWh |
| #257 | Kelly Creek Wind Project | Cabery, IL | 627.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding King Mountain Wind Ranch 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo 6 | Fort Stockton, TX | 206.9 GWh | 15 mi |
| Appaloosa Run Wind | Rankin, TX | 683.8 GWh | 24.5 mi |
| Big Sampson Wind | TBD, TX | 459.3 GWh | 28 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 350.0 GWh | 3.6 mi |
| Crane Solar Project | Crane, TX | 385.4 GWh | 5.2 mi |
| Desert Sky | Iraan, TX | 541.2 GWh | 22.1 mi |
| East Pecos Solar | McCamey, TX | 228.2 GWh | 14.6 mi |
| Emerald Grove | Crane, TX | 234.9 GWh | 10.6 mi |
| Greasewood II LLC | Girvin, TX | 840.3 GWh | 22.7 mi |
| Greasewood Solar | Fort Stockton, TX | 424.6 GWh | 19.1 mi |
| High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.5 TWh | 21.5 mi |
| Midway Solar - TX | Fort Stockton, TX | 299.7 GWh | 14.8 mi |
| NWP Indian Mesa Wind Farm | Iraan, TX | 178.5 GWh | 19.3 mi |
| Pearl Solar | Fort Stockton, TX | 86.1 GWh | 15.4 mi |
| RE Maplewood | McCamey, TX | 527.6 GWh | 16.1 mi |
| Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh | 3 mi |
| Sherbino II | Ft. Stockton, TX | 538.8 GWh | 34 mi |
| Upton County Solar | McCamey, TX | 267.7 GWh | 3.6 mi |
| Woodward Mountain I | Girvin, TX | 140.1 GWh | 20.5 mi |
| Woodward Mountain II | Girvin, TX | 132.5 GWh | 20.5 mi |