Segunda II (CSG)
1544 N 13th Rd, Streator, IL 61364Plant Summary Information
Segunda II (CSG) is ranked #79 out of 198 solar farms in Illinois in terms of total annual net electricity generation.
Segunda II (CSG) generated 747.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Segunda II (CSG) |
---|---|
Utility Name | Segunda Solar II, LLC |
Location | LaSalle County, IL |
Initial Operation Date | November 2021 |
Last Update | Dec 2024 |
Annual Generation | 4.0 GWh |
Annual Consumption | 15.1 k MMBtu |
Ranked #8,568 out of 12,530 Power Plants Nationwide | |
Ranked #3,585 out of 6,379 Solar Power Plants Nationwide | |
Ranked #212 out of 367 Illinois Power Plants | |
Ranked #79 out of 198 Illinois Solar Power Plants | |
Fuel Types | Solar |
Map of Segunda II (CSG)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Segunda II (CSG).
Monthly Net Generation for Segunda II (CSG)
Segunda II (CSG) Details
Summary Information | |
---|---|
Plant Name | Segunda II (CSG) (64732) |
Plant Address | 1544 N 13th Rd, Streator, IL 61364 |
Utility | Segunda Solar II, LLC (64297) |
Latitude, Longitude | 41.11773, -88.86371 |
Generation Dates on File | Nov 2021 to Dec 2024 |
Initial Operation Date | November 2021 |
Annual Generation | 4.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator SEGU2 Details Operating November 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 25 |
DC Net Capacity | 3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 2 MW |
Segunda II (CSG) Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3575 | Bunker Hill Solar | Lyndon, IL | 4.0 GWh |
#3576 | Blue Goose Solar CSG | Morrison, IL | 4.0 GWh |
#3577 | Shrewsbury Solar | Shrewsbury, MA | 4.0 GWh |
#3578 | CA Dept of Public Health at Richmond | Richmond, CA | 4.0 GWh |
#3579 | NSF Aurelius Site 2, LLC | Auburn, NY | 4.0 GWh |
#3580 | Hurricane Creek CSG | Carterville, IL | 4.0 GWh |
#3581 | Barone | Wurtsboro, NY | 4.0 GWh |
#3582 | Bear Creek Solar (CA) | Lodi, CA | 4.0 GWh |
#3583 | Portland SP | BROCTON, NY | 4.0 GWh |
#3584 | NJMC Landfill | Kearny, NJ | 4.0 GWh |
#3586 | CA-DGS RFP-Pleasant Valley State Prison | Coalinga, CA | 4.0 GWh |
#3587 | Stoneheart Solar, LLC | Saginaw, MI | 4.0 GWh |
#3588 | St Louis Solar | Gervais, OR | 4.0 GWh |
#3589 | Susquehanna University Solar | Selinsgrove, PA | 4.0 GWh |
#3590 | East Wayne Solar LLC | Goldsboro, NC | 4.0 GWh |
#3591 | Monson Solar | Monson, MA | 4.0 GWh |
#3592 | Crittenden Solar Facility | Dry Ridge, KY | 4.0 GWh |
#3593 | Cubera Solar, LLC | Dunn, NC | 4.0 GWh |
#3594 | Sampson Solar | Roseboro, NC | 4.0 GWh |
#3595 | CED Beecher Sun Solar | Beecher, IL | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Segunda II (CSG).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bennington Wind | Minonk, IL | 305.8 GWh | 15.9 mi |
Blackstone Wind Farm II LLC | Dwight, IL | 506.9 GWh | 17.4 mi |
Blackstone Wind Farm LLC | Ransom, IL | 250.1 GWh | 12.7 mi |
Briscoe 1A | Tonica, IL | 4.3 GWh | 10.7 mi |
Briscoe 2A | Lostant, IL | 4.6 GWh | 9.4 mi |
City of Peru Plank Road Generating Station | Peru, IL | 15.4 GWh | 21.7 mi |
Dayton Hydro | Ottawa, IL | 15.6 GWh | 19.1 mi |
Grand Ridge Solar Farm | Marseilles, IL | 26.6 GWh | 5.8 mi |
Grand Ridge Wind Energy Center | Marseilles, IL | 485.5 GWh | 12 mi |
LaSalle Generating Station | Marseilles, IL | 19.5 TWh | 13.4 mi |
Livingston Generating Facility | Pontiac, IL | 63.5 GWh | 16.9 mi |
Minonk Wind Farm | Minonk, IL | 651.1 GWh | 17.3 mi |
Otter Creek Wind Farm LLC | Ransom, IL | 453.2 GWh | 8 mi |
Pontiac | Pontiac, IL | 4.2 GWh | 18.6 mi |
Pontiac 1A | Pontiac, IL | 1.3 GWh | 18.8 mi |
Putnam Solar 1 | Granville, IL | 2.2 GWh | 20.5 mi |
Putnam Solar 1B | Granville, IL | 1.5 GWh | 20.6 mi |
Richland Township Solar, LLC | Washburn, IL | 43.3 GWh | 25.4 mi |
Streator Cayuga Ridge South | Odell, IL | 686.2 GWh | 21.2 mi |
Walldog | Pontiac, IL | 210.0 MWh | 18.2 mi |