Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| White Oak Energy LLC | White Oak Energy LLC | Carlock, IL | Midcontinent Independent System Operator, Inc. (MISO) | 399.9 GWh | May 2011 | Dec 2025 | Wind |
| Baldwin Wind LLC | Baldwin Wind LLC | Wilton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 384.1 GWh | Nov 2010 | Dec 2025 | Wind |
| Ashtabula Wind III LLC | Otter Tail Power Co | Luverne, ND | Midcontinent Independent System Operator, Inc. (MISO) | 119.9 GWh | Nov 2010 | Dec 2025 | Wind |
| Ridgewind | Ridgewind Power Partners LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 75.2 GWh | Dec 2010 | Dec 2025 | Wind |
| Uilk Wind LLC | RENEW Energy Inc | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 GWh | Dec 2009 | Dec 2025 | Wind |
| Community Wind North LLC | Northern States Power Co - Minnesota | Verdi Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 110.3 GWh | Apr 2011 | Dec 2025 | Wind |
| Adams Wind Generations LLC | BEAM US, LLC | Cosmos, MN | Midcontinent Independent System Operator, Inc. (MISO) | 57.2 GWh | Feb 2011 | Dec 2025 | Wind |
| Lakefield Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Lakefield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 391.0 GWh | Sep 2011 | Aug 2026 | Wind |
| Crystal Lake 3 LLC | Crystal Lake 3 LLC | Britt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 233.0 GWh | Nov 2009 | Aug 2026 | Wind |
| Cedar Hills Wind Farm | Montana-Dakota Utilities Co | Rhame, ND | Midcontinent Independent System Operator, Inc. (MISO) | 47.6 GWh | May 2010 | Dec 2025 | Wind |
| Glen Ullin Station 6 | Montana-Dakota Utilities Co | Glen Ullin, ND | Midcontinent Independent System Operator, Inc. (MISO) | 32.3 GWh | Jun 2009 | Dec 2025 | Waste Heat |
| Little Quinnesec Falls Hydro Project | Eagle Creek Renewable Energy, LLC | Niagara, WI | Midcontinent Independent System Operator, Inc. (MISO) | 60.8 GWh | Nov 1900 | Dec 2025 | Water |
| Bent Tree Wind Farm Phase 1 | Wisconsin Power & Light Co | Hartland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 334.1 GWh | Jan 2011 | Dec 2025 | Wind |
| Glacier Hills | Wisconsin Electric Power Co | Cambria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 330.9 GWh | Nov 2011 | Aug 2026 | Wind |
| Rolling Hills Wind Farm | MidAmerican Energy Co | Massena, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Nov 2011 | Aug 2026 | Wind |
| Laurel Wind Farm | MidAmerican Energy Co | Laurel, IA | Midcontinent Independent System Operator, Inc. (MISO) | 470.0 GWh | Nov 2011 | Dec 2025 | Wind |
| Settlers Trail Wind Farm LLC | RWE Clean Energy | Sheldon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 320.4 GWh | Sep 2011 | Dec 2025 | Wind |
| Shirley Wind | Deriva Energy | Denmark, WI | Midcontinent Independent System Operator, Inc. (MISO) | 57.0 GWh | Oct 2010 | Dec 2025 | Wind |
| Waverly Community Wind Project | Waverly Municipal Elec Utility - (IA) | Waverly, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2001 | Dec 2025 | Wind |
| Welcome Wind Turbine | Federated Rural Electric Assn | Welcome, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Apr 2008 | Dec 2025 | Wind |
| Iowa Lakes Community College Wind Farm | Iowa Lakes Community College | Estherville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 374.0 MWh | Jan 2005 | Apr 2026 | Wind |
| Pine Tree Acres WM LFGTE | WM Renewable Energy LLC | Lenox, MI | Midcontinent Independent System Operator, Inc. (MISO) | 87.6 GWh | Feb 2012 | Aug 2026 | Landfill Gas |
| Grant County Wind LLC | Grant County Wind, LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 52.9 GWh | Jul 2010 | Dec 2025 | Wind |
| OREG 3 Inc | Ormat Nevada Inc | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 43.0 GWh | Jul 2010 | Aug 2026 | Waste Heat |
| Big Blue | Big Blue Wind Farm LLC (MN) | Blue Earth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 70.6 GWh | Nov 2012 | Dec 2025 | Wind |
| Buffalo Ridge I LLC | Avangrid Power LLC | Elkton, SD | Midcontinent Independent System Operator, Inc. (MISO) | 97.3 GWh | Mar 2009 | Aug 2026 | Wind |
| Elm Creek Wind LLC | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 191.6 GWh | Nov 2008 | Dec 2025 | Wind |
| Luverne Wind Energy Center | Otter Tail Power Co | Luverne, ND | Midcontinent Independent System Operator, Inc. (MISO) | 151.4 GWh | Aug 2009 | Dec 2025 | Wind |
| Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 342.9 GWh | Apr 2008 | Dec 2025 | Wind |
| Ashtabula Wind Energy Center | Otter Tail Power Co | Luverne, ND | Midcontinent Independent System Operator, Inc. (MISO) | 88.6 GWh | Sep 2008 | Dec 2025 | Wind |
| Jeffers Wind 20 LLC | Northern States Power Co - Minnesota | Jeffers, MN | Midcontinent Independent System Operator, Inc. (MISO) | 196.5 GWh | Sep 2008 | Dec 2025 | Wind |
| Langdon Wind Energy Center | Otter Tail Power Co | Langdon, ND | Midcontinent Independent System Operator, Inc. (MISO) | 172.7 GWh | Nov 2007 | Dec 2025 | Wind |
| Charles City Wind Farm | MidAmerican Energy Co | Charles City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 267.7 GWh | Mar 2008 | Dec 2025 | Wind |
| Willmar Municipal East Substation | Willmar Municipal Utilities (MN) | Willmar, MN | Midcontinent Independent System Operator, Inc. (MISO) | 32.0 MWh | May 2000 | Dec 2025 | Distillate Fuel Oil |
| Moraine II Wind LLC | Avangrid Power LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 101.5 GWh | Jan 2009 | Dec 2025 | Wind |
| Velva Windfarm LLC | Acciona Wind Energy USA LLC | Velva, ND | Midcontinent Independent System Operator, Inc. (MISO) | 20.2 GWh | Nov 2005 | Dec 2025 | Wind |
| Tatanka Wind Power LLC | Acciona Wind Energy USA LLC | Ashley, ND | Midcontinent Independent System Operator, Inc. (MISO) | 420.0 GWh | Dec 2007 | Aug 2026 | Wind |
| Willmar Municipal SW Substation | Willmar Municipal Utilities (MN) | Willmar, MN | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | May 2000 | Dec 2025 | Distillate Fuel Oil |
| Geismar Cogen | Air Liquide Large Industries U S LP | Geismar, LA | Midcontinent Independent System Operator, Inc. (MISO) | 528.4 GWh | Dec 1999 | Dec 2025 | Natural Gas |
| Ameresco Jefferson City | AMERESCO Jefferson City LLC | Jefferson City, MO | Midcontinent Independent System Operator, Inc. (MISO) | 16.1 GWh | Feb 2009 | Dec 2025 | Landfill Gas |
| Bison I Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 196.5 GWh | Nov 2010 | Dec 2025 | Wind |
| Odin Wind Farm LLC | Aspenall Energies (Delaware), LLC | Mountainlake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 32.4 GWh | Apr 2008 | Dec 2025 | Wind |
| Diamond Willow Wind Facility | Montana-Dakota Utilities Co | Baker, MT | Midcontinent Independent System Operator, Inc. (MISO) | 88.0 GWh | Nov 2007 | Dec 2025 | Wind |
| Pioneer Prairie Wind Farm | Pioneer Prairie Wind Farm I, LLC | McIntire, IA | Midcontinent Independent System Operator, Inc. (MISO) | 841.7 GWh | Sep 2008 | Aug 2026 | Wind |
| Walnut Wind Farm | MidAmerican Energy Co | Walnut, IA | Midcontinent Independent System Operator, Inc. (MISO) | 558.3 GWh | Nov 2008 | Dec 2025 | Wind |
| Waste Management Eco Vista LFGTE | WM Renewable Energy LLC | Springdale, AR | Midcontinent Independent System Operator, Inc. (MISO) | 22.4 GWh | Oct 2010 | Dec 2025 | Natural Gas |
| Waste Management Northern Oaks LFGTE | WM Renewable Energy LLC | Harrison, MI | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Oct 2010 | Dec 2025 | Landfill Gas |
| Langdon Wind II LLC | FPL Energy Langdon Wind LLC | Osnabrock, ND | Midcontinent Independent System Operator, Inc. (MISO) | 174.8 GWh | Aug 2008 | Dec 2025 | Wind |
| Osceola Windpower II | Osceola Windpower II | Harris, IA | Midcontinent Independent System Operator, Inc. (MISO) | 191.6 GWh | Aug 2008 | Aug 2026 | Wind |
| Adair Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 551.2 GWh | Nov 2008 | Dec 2025 | Wind |
| Spruce Ridge Gas Recovery | WM Renewable Energy LLC | Glencoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 24.7 GWh | Mar 2008 | Dec 2025 | Landfill Gas |
| FPL Energy Ashtabula Wind LLC | FPL Energy Ashtabula Wind LLC | Luverne, ND | Midcontinent Independent System Operator, Inc. (MISO) | 583.0 GWh | Nov 2008 | Dec 2025 | Wind |
| Carroll Wind Farm | MidAmerican Energy Co | Carroll, IA | Midcontinent Independent System Operator, Inc. (MISO) | 556.6 GWh | Nov 2008 | Dec 2025 | Wind |
| FPL Energy Crystal Lake Wind LLC | FPL Energy Crystal Lake Wind LLC | Britt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 579.8 GWh | Nov 2008 | Aug 2026 | Wind |
| FPL Energy Story Wind LLC | FPL Energy Story Wind LLC | Zearing, IA | Midcontinent Independent System Operator, Inc. (MISO) | 568.7 GWh | Nov 2008 | Aug 2026 | Wind |
| Grand Meadow | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 378.7 GWh | Nov 2008 | Dec 2025 | Wind |
| FPL Energy Crystal Lake Wind II LLC | FPL Energy Crystal Lake Wind II LLC | Britt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 701.6 GWh | Dec 2008 | Aug 2026 | Wind |
| Forward Wind Energy Center | Wisconsin Public Service Corp | Brownsville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 119.7 GWh | Jun 2008 | Aug 2026 | Wind |
| Winnebago Wind Power Project | Avangrid Power LLC | Forest City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 61.3 GWh | Aug 2008 | Dec 2025 | Wind |
| Rail Splitter Wind Farm | Rail Splitter Wind Farm LLC | Hopedale, IL | Midcontinent Independent System Operator, Inc. (MISO) | 269.2 GWh | Jul 2009 | Dec 2025 | Wind |
| Hardin Hilltop Wind LLC | Hardin Holdco LLC | Jefferson, IA | Midcontinent Independent System Operator, Inc. (MISO) | 31.2 GWh | Apr 2007 | Dec 2025 | Wind |
| Lost Lakes Wind Farm LLC | Lost Lakes Wind Farm LLC | Lake Park, IA | Midcontinent Independent System Operator, Inc. (MISO) | 270.1 GWh | Nov 2009 | Dec 2025 | Wind |
| Pinconning White Feather | Energy Developments, Inc d/b/a EDL | Pinconning, MI | Midcontinent Independent System Operator, Inc. (MISO) | 16.1 GWh | Feb 2009 | Dec 2025 | Landfill Gas |
| Ewington Energy Systems, LLC | Ewington Energy Systems, LLC | Worthington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 81.4 GWh | Dec 2007 | Dec 2025 | Wind |
| Taconite Ridge 1 Wind Energy Center | ALLETE, Inc. | Mountain Iron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 53.1 GWh | Apr 2008 | Dec 2025 | Wind |
| Bryon Center | Energy Developments, Inc d/b/a EDL | Byron Center, MI | Midcontinent Independent System Operator, Inc. (MISO) | 30.8 GWh | Feb 2009 | Dec 2025 | Landfill Gas |
| Rugby Wind Power Project | Avangrid Power LLC | Barton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 348.1 GWh | Nov 2009 | Dec 2025 | Wind |
| Spiritwood Station | Great River Energy | Spiritwood, ND | Midcontinent Independent System Operator, Inc. (MISO) | 271.3 GWh | Oct 2014 | Aug 2026 | Natural Gas : 62.2% Refined Coal : 37.8% |
| Harvest | Harvest Windfarm, LLC | Elkton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 116.6 GWh | Dec 2007 | Dec 2025 | Wind |
| Wapsipinicon Wind Project | EDF Renewable Asset Holdings, Inc. | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 268.1 GWh | Jan 2009 | Dec 2025 | Wind |
| Hoosier Wind Project LLC | AES Indiana | Goodland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 243.5 GWh | Oct 2009 | Dec 2025 | Wind |
| Farmers City Wind LLC | Avangrid Power LLC | Tarkio, MO | Midcontinent Independent System Operator, Inc. (MISO) | 253.0 GWh | Mar 2009 | Dec 2025 | Wind |
| Marshall Wind 1 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Nov 2007 | Dec 2025 | Wind |
| Granite City Works | United States Steel Granite City Works | Granite City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 447.9 GWh | May 2010 | Aug 2026 | Purchased Steam : 49.2% Natural Gas : 43.5% Blast Furnace Gas : 7.3% |
| Twin Cities Hydro LLC | Twin Cities Hydro LLC | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 97.1 GWh | Sep 1924 | Dec 2025 | Water |
| St Paul Cogeneration | St Paul Cogeneration LLC | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 74.5 GWh | Mar 2003 | Dec 2025 | Wood/Wood Waste Solids : 82.4% Natural Gas : 17.6% |
| Crane Creek Wind Energy Center | Wisconsin Public Service Corp | Riceville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 284.0 GWh | Nov 2009 | Dec 2025 | Wind |
| Marshall Wind 6 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Nov 2007 | Dec 2025 | Wind |
| Marshall Wind 2 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Nov 2007 | Nov 2025 | Wind |
| Barton Windpower LLC | Avangrid Power LLC | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 365.4 GWh | May 2009 | Dec 2025 | Wind |
| Merricourt Wind Energy Center | Otter Tail Power Co | Kulm, ND | Midcontinent Independent System Operator, Inc. (MISO) | 561.2 GWh | Nov 2020 | Aug 2026 | Wind |
| Nobles Wind Project | Northern States Power Co - Minnesota | Reading, MN | Midcontinent Independent System Operator, Inc. (MISO) | 784.7 GWh | Nov 2010 | Aug 2026 | Wind |
| Butler Ridge | Butler Ridge Wind Energy Center | Mayville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 138.1 GWh | Jan 2009 | Aug 2026 | Wind |
| Marshall Wind 5 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2007 | Dec 2025 | Wind |
| Marshall Wind 4 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 2007 | Dec 2025 | Wind |
| Marshall Wind 3 LLC | Marshall Wind Farm, LLC | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Nov 2007 | Dec 2025 | Wind |
| Michigan Wind 2 | Michigan Wind 2, LLC | Minden City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 329.1 GWh | Nov 2011 | Dec 2025 | Wind |
| Tipton | City of Tipton - (IA) | Tipton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 266.0 MWh | Oct 1955 | Dec 2025 | Distillate Fuel Oil |
| Hopkinton | City of Hopkinton - (IA) | Hopkinton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 54.0 MWh | Aug 1973 | Dec 2025 | Distillate Fuel Oil |
| Nine Springs | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 89.0 MWh | Nov 1964 | Dec 2025 | Natural Gas |
| Port Allen (LA) | Placid Refining Co LLC | Port Allen, LA | Midcontinent Independent System Operator, Inc. (MISO) | 49.8 GWh | Apr 1990 | Dec 2025 | Natural Gas |
| Cargill Corn Milling Division | Cargill Inc North America Sweetners | Eddyville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 112.1 GWh | Nov 1952 | Dec 2025 | Natural Gas |
| Sabine River Operations | The Dow Chemical Company | Orange, TX | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 TWh | Dec 1947 | Aug 2026 | Natural Gas : 99.8% |
| WestRock (TX) | WestRock (TX) | Evadale, TX | Midcontinent Independent System Operator, Inc. (MISO) | 441.2 GWh | May 1954 | Dec 2025 | Black Liquor : 65.1% Natural Gas : 20.7% Wood/Wood Waste Solids : 14.2% |
| Midland Cogeneration Venture | Midland Cogeneration Venture | Midland, MI | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 TWh | May 1989 | Aug 2026 | Natural Gas |
| Gaylord - Wolverine | Wolverine Power Supply Coop | Gaylord, MI | Midcontinent Independent System Operator, Inc. (MISO) | 37.1 GWh | May 2001 | Dec 2025 | Natural Gas |
| Escanaba Mill | Billerud Escanaba LLC | Escanaba, MI | Midcontinent Independent System Operator, Inc. (MISO) | 457.3 GWh | Dec 1968 | Aug 2026 | Black Liquor : 46.4% Natural Gas : 30.8% Wood/Wood Waste Solids : 22.0% Residual Fuel Oil : 0.7% |
| Industrial Park | City of Rock Falls - (IL) | Rock Falls, IL | Midcontinent Independent System Operator, Inc. (MISO) | 838.0 MWh | Jun 2001 | Dec 2025 | Distillate Fuel Oil |
| Coyote | Otter Tail Power Co | Beulah, ND | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 TWh | Apr 1981 | Aug 2026 | Lignite Coal : 99.8% |
| CF Industries Yazoo City Complex | CF Industries Nitrogen LLC | Yazoo City, MS | Midcontinent Independent System Operator, Inc. (MISO) | 81.8 GWh | Jun 1984 | Aug 2026 | Natural Gas |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |